This page answers the questions crews and engineers actually ask about how a bore is drilled, how big the pits have to be, what casing and product pipe are allowed, and how far a shot can realistically run. Horizontal directional drilling has no regulated maximum length. What governs the design is the owner of the crossing: the Iowa SUDAS Design Manual Chapter 14 is the most widely cited public design reference for trenchless work, AREMA sets minimum steel casing wall thickness for railroad crossings, state DOTs such as Iowa DOT publish casing and clearance rules for highway crossings, and OSHA 29 CFR 1926 Subpart P governs any bore pit deep enough to count as an excavation.
Every number below is tied to a named authority or a published manufacturer specification, and where the industry does not publish a number, this page says so instead of guessing. That matters most on the question of maximum bore distance, which no drill manufacturer actually rates.
Trinity Boring Solutions is a family business operating since 1965. We bore 10 ft to 5,000 ft in diameters from 3/4 inch to 48 inch, on Vermeer and Ditch Witch directional boring equipment we own outright, plus hydro vacuum trailers and trucks, across all of Oklahoma and northern Texas.
The Five Trenchless Methods, Side by Side
Definitions, size ranges, and typical lengths as published in the Iowa SUDAS Design Manual Chapter 14, Trenchless Construction. Trinity performs directional boring and auger boring, or jack and bore. Pipe ramming and microtunneling are listed here as industry reference, not as Trinity services.
| Method | How it works | Typical size | Typical length |
|---|---|---|---|
| Horizontal directional drilling | Steerable and surface launched, a pilot bore on a sag shaped arc is back reamed to roughly 1.5 times product diameter and the product is pulled in | Mini-HDD up to 10 in; HDD 12 in to 60 in | Mini-HDD under 600 ft; HDD over 2,000 ft |
| Auger boring | Straight pit to pit push with a rotating cutting head, spoil carried back to the drive shaft by helical auger flights inside a steel casing | Most common pipe sizes 8 in to 36 in | Typically 175 ft to 225 ft, greater than 600 ft possible |
| Jack and bore, or pipe jacking | Pipe installed directly behind a shield machine by hydraulic jacking from a drive shaft, with personnel excavating at the face | Not published in the source manual | Not published in the source manual |
| Pipe ramming | Non-steerable percussion hammer drives an open ended steel casing from a launch pit, soil cleaned out by auger, jetting, or compressed air | 2 in to 55 in, sizes as large as 147 in have been done | Usually under 150 ft, up to 300 ft possible |
| Microtunneling | Remote controlled, laser guided pipe jacking with continuous pressure at the face and no personnel entry | 10 in to 120 in | Not published in the source manual |
AREMA Minimum Steel Casing Wall Thickness, E80 Loading
Selected values from AREMA Table 1-5-1 for railroad crossings. AREMA also requires casing steel with a specified minimum yield strength of at least 35,000 psi, conforming to ASTM A1097, with leakproof butt welded or interlocking joints. Individual railroad standards may vary and always govern the final submittal.
| Nominal diameter (in) | Coated or cathodically protected (in) | Not coated, not protected (in) |
|---|---|---|
| 12-3/4 and under | 0.188 | 0.188 |
| 14 | 0.188 | 0.250 |
| 16 | 0.219 | 0.281 |
| 18 | 0.250 | 0.312 |
| 20 and 22 | 0.281 | 0.344 |
| 24 | 0.312 | 0.375 |
| 30 | 0.406 | 0.469 |
| 36 | 0.469 | 0.531 |
| 48 | 0.625 | 0.688 |
| 60 | 0.781 | 0.844 |
| 72 | 0.938 | 1.000 |
Where casing is neither coated nor cathodically protected, AREMA requires the wall thickness to be increased to the nearest standard size at least 0.063 inches greater than the thickness required, except at diameters under 12-3/4 inches. Iowa DOT publishes a comparable roadway table and adds that casing diameter should provide a minimum of 4 inches between the inside of the casing and the largest outside diameter of the carrier pipe, including pipe bells.
Directional Boring, Bore Pit, and Casing FAQ
Eighteen questions crews, engineers, and inspectors ask most, answered with the governing source named.
What does bore mean in construction?
+
In construction, to bore means to form a hole through the ground horizontally so a pipe, casing, conduit, or cable can be installed without opening a trench along the route. The Iowa SUDAS Design Manual Chapter 14 groups these techniques under trenchless construction and describes several distinct ways to form the hole: a steerable fluid drilled arc, a straight rotating auger inside a steel casing, hydraulic jacking of pipe behind a shield, and percussion ramming of an open casing. In every case the finished bore is the void the product occupies. A bore is measured by length, diameter, depth, and tolerance to line and grade, and those four numbers drive the method selection more than anything else on a crossing.
What is underground boring?
+
Underground boring is installing utilities beneath the surface by drilling or pushing a hole through the soil rather than excavating an open cut. The Iowa SUDAS Design Manual Chapter 14 defines the leading form, directional boring, as a minimal impact method of installing pipe, conduit, or cable in a relatively shallow arc using a surface launched drilling rig. The practical benefit is that roads, railroads, creeks, driveways, and mature landscaping stay intact, and the disturbance is limited to the entry and exit areas. Before any bore starts, the route has to be located and, where the design is tight, physically verified. Trinity handles that step with hydrovac daylighting so the drill head is never steered blind past a live line.
What is another name for directional drilling?
+
The most common alternate names are horizontal directional drilling, HDD, directional boring, and simply a bore. Vermeer and Ditch Witch both market the machines as directional drills or HDD systems, and trade publications use directional drill and HDD boring interchangeably. There is a real distinction of scale worth knowing: directional boring generally implies mini and small rigs, small diameter product, and crossings measured in hundreds of feet, while horizontal directional drilling generally implies large or maxi rigs, large diameter bores, and crossings measured in thousands of feet. Note also that trenchless is the umbrella category, not a synonym for HDD, because it also covers auger boring, pipe ramming, and microtunneling. Terms sometimes heard on jobsites are not standardized in published references, so specifications should use HDD.
What is auger boring?
+
Auger boring is a technique for forming a bore from a drive pit to a reception pit using a rotating cutting head, with spoil removed back to the drive shaft by helically wound auger flights turning inside a steel casing, as defined in the Iowa SUDAS Design Manual Chapter 14. The machine is track mounted in the pit, and setting that track to exact line and grade is the critical step because there is very little ability to correct deviation once the bore is running. Steel is the standard casing material for auger boring because of the rotating augers, and a carrier pipe of almost any material can then be installed inside the casing. Most common pipe sizes run 8 inches to 36 inches. It is the method of choice under railroads and highways.
What are jacking pipes?
+
Jacking pipes are the pipe segments pushed into the ground by hydraulic rams during pipe jacking, forming a continuous string in the ground behind a shield machine, as the Iowa SUDAS Design Manual Chapter 14 describes it. Because the jacks transmit the entire thrust load through the pipe wall and joint, jacking pipe has to be manufactured for axial compression, with square ends and joints designed to transfer that load without spalling. The jacking frame reacts against a thrust block, normally concrete, built into the back wall of the drive shaft. Steel casing is the usual product on utility crossings, and the carrier line then goes inside it. Where a railroad governs the crossing, AREMA sets the minimum casing wall thickness and material grade, and the railroad reviews the submittal.
How do you install a jack and bore pipe?
+
You excavate a drive pit and a reception pit, build a thrust block, set the machine to exact line and grade, then advance the pipe from the drive shaft while the face is excavated ahead of it. In true pipe jacking the Iowa SUDAS Design Manual Chapter 14 describes hydraulic jacking of pipe behind a shield machine that provides a safe area for workers excavating at the face, guided by laser to line and grade. In auger boring the same pit setup applies but a rotating auger inside the steel casing removes the spoil instead. Both pits are excavations, so once they exceed 5 feet deep, OSHA 29 CFR 1926.652 protective system rules apply. See our trenching and excavation safety reference for the shoring requirements.
How far can you directionally bore?
+
Trinity directionally bores from 10 ft to 5,000 ft, in product and casing diameters from 3/4 inch to 48 inch. There is no regulated maximum bore length anywhere in United States code, so the practical limits come from design guidance and site conditions. The Iowa SUDAS Design Manual Chapter 14 gives the standard planning ranges by rig class: Mini-HDD handles pipe up to 10 inches in diameter at drive lengths of less than 600 feet, while full HDD installs pipe 12 to 60 inches in diameter at pipe lengths over 2,000 feet. Beyond rig size, what actually limits a shot is soil type, product diameter, drilling fluid management, and available pullback. Long crossings in Oklahoma and northern Texas are routine work for our underground utility crews.
How far can you bore underground?
+
It depends entirely on the method, and the range across methods is wide. Trinity bores 10 ft to 5,000 ft. For comparison, the Iowa SUDAS Design Manual Chapter 14 reports typical auger bore lengths of 175 feet to 225 feet with maximums greater than 600 feet possible, and pipe ramming usually under 150 feet with installations as long as 300 feet successfully completed. Directional drilling reaches much further, with bore lengths reported from a few metres to over 1 km by the UK Society for Trenchless Technology, and the trade press notes that HDD bores up to 2,438.4 m, roughly 8,000 ft, are becoming more common. Method selection should start with required accuracy and product material, then length, because a long shot that cannot hold grade is the wrong answer.
How far can you directionally drill?
+
Utility scale directional drilling routinely runs from a few hundred feet to several thousand, and Trinity drills up to 5,000 ft on a single crossing. The controlling variables are pullback capacity, drilling fluid volume and returns, product diameter, and soil. Accuracy also degrades with distance, and that has to be designed for: the Iowa SUDAS Design Manual Chapter 14 states that normally an accuracy of plus or minus 1 percent of the length of the bore can be expected for HDD, and within 6 to 12 inches for Mini-HDD. On a 2,000 ft shot that 1 percent is 20 feet of tolerance, which is why deep pipeline crossings get profile drawings and pilot verification. Long fiber runs are a good fit, and we detail them in our fiber conduit installation guide.
How far can you auger bore?
+
Typical auger bore lengths now range between 175 feet and 225 feet, with maximum bore lengths of greater than 600 feet possible, according to the Iowa SUDAS Design Manual Chapter 14. That is far shorter than HDD, and for good reason: the auger and casing are pushed straight from the drive pit, spoil has to travel the full length back through the casing on the auger flights, and there is little ability to correct line or grade once the bore is started. What you gain is accuracy and the ability to install rigid pipe. Standard auger boring holds about plus or minus 1 percent both vertically and horizontally, while steerable auger boring holds plus or minus 0.1 percent vertically. Most highway and railroad casing crossings fall comfortably inside these lengths.
How far can a ditch witch bore?
+
Ditch Witch and Vermeer do not publish a maximum bore distance for their drills, so any single number you see quoted is somebody’s field experience rather than a manufacturer rating. They rate machines by thrust, pullback, rotary torque, drill pipe length, and on-board rod capacity. The Ditch Witch JT100 spec sheet lists 70,000 lb of thrust force, 100,000 lb of pullback force, 14.75 ft drill pipe, and a minimum bend radius of 205 ft, with no bore length stated. On the small end, the Vermeer D8x12 carries a total machine rod capacity of 180 ft, which can be extended by loading more rod. Achievable distance comes down to soil, product diameter, drilling fluid management, and pullback capacity. For planning, use the Iowa SUDAS ranges rather than a machine model number.
What is a bore pit?
+
A bore pit, also called a drive pit, launch pit, or entry pit, is the excavation the boring machine works from. At the far end is the reception or exit pit, defined in the Iowa SUDAS Design Manual Chapter 14 as the excavation into which trenchless equipment is driven and recovered after the product pipe, conduit, or cable is installed. The bottom of a bore pit is usually over-excavated and backfilled with crushed stone to give the machine adequate support. Worth knowing: HDD normally needs no entry pit at all, because the directional drill rig is normally set up on the ground surface, though a shallow pit to catch returning fluid and cuttings is common at both ends. Auger boring and jack and bore always require pits at both ends.
How big do bore pits need to be?
+
Generally 26 to 40 feet long and 8 to 12 feet wide, per the Iowa SUDAS Design Manual Chapter 14, which notes that pit dimensions vary depending on the size and length of the casing being used and on the depth of the boring. Placement matters as much as size. The manual advises locating pits beyond the roadway foreslope where possible, and on urban sections keeping them several feet back from the curb to prevent undermining the roadway. It also reminds designers that crossing under a 24 foot roadway requires a bore longer than 24 feet. When the pit exceeds 5 feet deep it is an excavation under OSHA 29 CFR 1926 Subpart P and needs a protective system. Call a boring contractor early if the pit size is uncertain.
What are the dimensions of a jack and bore pit?
+
Plan on a pit in the range of 26 to 40 feet long and 8 to 12 feet wide, which is the range the Iowa SUDAS Design Manual Chapter 14 publishes for bore pits. The length is driven by the casing joint length the crew is pushing plus the machine and jacking frame behind it, and the depth is set by the required invert of the crossing. Jack and bore adds a requirement auger boring does not: a thrust block, normally concrete, in the back wall to react the jacking force. Depth almost always puts these pits past 5 feet, so OSHA 29 CFR 1926.652 protective systems apply, and above 20 feet the system must be designed by a registered professional engineer. Confirm final dimensions with the contractor before permitting.
Can you directional bore a sewer line?
+
Yes for pressure sewer, usually no for gravity sewer. The Iowa SUDAS Design Manual Chapter 14 lists sewer force mains among the pipelines directional drilling is used to install, and force mains and pressure sewers are a good HDD fit because they do not depend on a continuous fall. Gravity sewer is different, because it has to hold a designed grade over the whole run, and HDD accuracy is normally plus or minus 1 percent of the bore length, or within 6 to 12 inches for Mini-HDD. On a long shot that tolerance swamps a shallow slope. For gravity sewer the correct method is auger boring or jack and bore inside a steel casing, which holds about plus or minus 1 percent, or plus or minus 0.1 percent vertically when steerable.
Can you directional bore steel pipe?
+
Yes. The Iowa SUDAS Design Manual Chapter 14 names steel and HDPE as the two most common materials installed by directional drilling, and steel is standard on gas and pipeline crossings pulled by HDD. The real constraint is bend radius rather than the material itself. The drill string and the installed product both have to tolerate the arc, and published rig specifications give a sense of scale: the Ditch Witch JT100 lists a minimum bend radius of 205 ft for its drill pipe, and the product being pulled must be compatible with the path actually drilled. Welded joints have to be tested and the coating protected during pullback. Trinity installs steel product and steel casing from 3/4 inch to 48 inch across Oklahoma and northern Texas.
What are the most common sizes of borehole casings?
+
For utility crossings, steel casing most commonly falls between 8 inches and 36 inches, which the Iowa SUDAS Design Manual Chapter 14 gives as the most common pipe sizes for auger boring. The size is not chosen freely. Iowa DOT requires the casing diameter to provide a minimum of 4 inches between the inside of the casing pipe and the largest outside diameter of the carrier pipe, including pipe bells, so the carrier and its bells set the floor. Wall thickness is then set by loading: AREMA publishes minimum wall thickness for E80 railroad loading, from 0.188 in at 12-3/4 in and under up to 1.000 in at 72 in uncoated. Individual railroad standards may vary, and the railroad or DOT of jurisdiction sets the final spec.
What kind of conduit is used for directional boring?
+
HDPE is the workhorse conduit for directional boring, because it fuses into a continuous string with no joints to pull apart and it bends through the drilled arc. The Iowa SUDAS Design Manual Chapter 14 names steel and HDPE as the most common materials installed by directional drilling, and adds that PVC, copper, and other flexible materials can also be successfully installed. Rigid and brittle products are the exception, and those belong in a steel casing installed by auger boring or jack and bore, where the carrier pipe is protected by the structural rigidity of the casing and can be almost any standard pipe material. Burial depth and raceway type for electrical work are governed by NEC Table 300.5, covered in our utility depth and 811 guide.
Regulatory and technical references on this page:
Iowa SUDAS Design Manual, Chapter 14, Trenchless Construction,
AREMA wireline crossing requirements, Section 5.1.5, Casing Pipe,
Iowa DOT Design Manual 11D-1, Casing Pipe,
Ditch Witch JT100 specifications,
Vermeer D8x12 spec sheet,
Vermeer Horizontal Directional Drills,
UK Society for Trenchless Technology, Horizontal Directional Drilling,
Trenchless Technology, HDD vs. Auger Boring,
Directional boring, terminology overview,
eCFR, 29 CFR 1926 Subpart P, Excavations,
NEC Table 300.5, minimum cover requirements.
Send Us the Crossing and We Will Tell You the Right Method
Trinity has been boring since 1965, from 10 ft to 5,000 ft in 3/4 inch to 48 inch, on Vermeer and Ditch Witch equipment we own outright. Send plans or a location anywhere in Oklahoma or northern Texas and we will scope the pits, the casing, and the shot. See our trenching cost and production rate reference if you are comparing open cut against a bore.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and north Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.