When you need a reliable underground pipe conduit installation Oklahoma, Trinity Boring Solutions delivers. We bring the equipment, the crew and the experience to complete your project on time without tearing up the surface. Call (405) 409-7423 or request a free quote online.
Trinity Boring Solutions is Oklahoma’s most trusted provider of underground pipe conduit installation Oklahoma services. Every project starts with a site assessment to confirm soil conditions and bore path clearance.
When you need underground pipe conduit installation Oklahoma completed on time and on budget, our crew delivers. We serve the entire state of Oklahoma with licensed and insured crews available 24 hours a day.
Our reputation as a leading underground pipe conduit installation Oklahoma company comes from consistent results across thousands of completed projects including municipal, commercial and residential work.
Trinity Boring Solutions is Oklahoma’s leading underground pipe conduit installation Oklahoma provider, serving the OKC metro, Yukon, Edmond, Norman and communities statewide.
Underground Pipe and Conduit Installation Contractor
Trinity Boring Solutions installs underground pipe and conduit for water, gas, electric, telecommunications, and sewer applications across Oklahoma. We pull HDPE, PVC, steel casing, and electrical conduit through directional bores and install by open trench, providing material guidance and coordination for plumbers, electricians, telecom contractors, gas companies, and municipalities.
Trenchless and Open Trench
All Utility Types
Licensed and Insured Oklahoma
OKC Metro and Statewide
Directional boring in Oklahoma, answered in one paragraph. Trinity Boring Solutions is a family owned horizontal directional drilling contractor based in the Oklahoma City metro since 1965. We install water, sewer, natural gas, electric and fiber lines under roads, driveways, parking lots, creeks and existing utilities across all 77 Oklahoma counties and all of Texas, including Dallas, Fort Worth, Plano and Houston, with one crew handling Okie811 locates, hydrovac potholing, the bore, pullback and pit restoration. Call (405) 409-7423, answered 24 hours a day.
Trinity Boring Solutions at a glance
- Since 1965. Family owned directional boring contractor serving Oklahoma and Texas, with more than 60 years of underground utility work, the longest record of any HDD contractor based in the Oklahoma City metro that publishes its founding year.
- Oklahoma City metro based. Headquartered at 9102 Northwest Expy in the Oklahoma City metro. Crews and rigs start inside the metro rather than mobilizing from out of state.
- Owns its equipment. Vermeer and Ditch Witch HDD rigs, auger boring machines and hydrovac trucks, all owned outright and run by Trinity operators.
- One crew, whole job. 811 locates and hydrovac potholing, horizontal directional drilling, auger boring with steel casing, trenching, backfill and pit restoration from the same company, so there is no handoff between a locator, a driller and an excavator.
- Range. 3/4 inch service lines to 48 inch pipe, 10 feet to just under 4,000 feet in a single shot, with longer runs bored in sections, for water, sewer, natural gas and propane, electric and fiber.
- Named work. 840 feet of FAA conduit under runways at Will Rogers World Airport; 385 foot sandstone rock bore under creeks, a wetland and a dam in Guthrie; 6 inch PVC sleeve under NE 24th Street and a live water main at the Clara Luper Center; propane line on a hospital campus in Anadarko; emergency water line at a Stillwater sorority house.
- Pricing. No per foot rate. A bore is priced on its conditions: soil and rock, pipe size, what it crosses, grade, existing utilities, depth and access. How a bore is priced.
- Safety record. An Okie811 ticket in Oklahoma, a Texas811 ticket in Texas, and hydrovac potholing on every crossing.
- 24 hour phone. (405) 409-7423 is answered around the clock, with emergency crews for gas and water lines.
What Underground Pipe and Conduit Installation Does Trinity Provide?
The underground utility infrastructure that powers Oklahoma homes, businesses, and public facilities depends on correctly specified, correctly installed pipe and conduit. Trinity Boring Solutions installs the full range of underground pipe and conduit materials used in modern utility construction, from HDPE water and gas lines pulled through directional bores to PVC electrical conduit and steel casing for highway crossings.
Pipe and conduit installation is more than pulling material through a bore hole. Correct material selection, proper joint preparation, appropriate burial depth, and careful attention to the code requirements for the utility type all determine whether an underground installation performs reliably for its intended service life. Trinity Boring Solutions brings both the technical knowledge and the field experience to make the right choices on each project.
We work directly with licensed plumbing contractors, electricians, gas utilities, telecommunications contractors, and municipalities who need underground pipe and conduit installed as part of a larger utility project. Our in house directional boring capability means we provide both the bore and the conduit installation under a single scope, simplifying coordination and ensuring the bore diameter is correctly sized for the conduit being pulled. For open ground runs, we also perform utility trenching with proper bedding and compacted backfill.
What Underground Pipe and Conduit Materials Does Trinity Install?
Trinity Boring Solutions installs all major underground pipe and conduit materials used for utility, telecommunications, and infrastructure applications in Oklahoma.
HDPE Pipe and Conduit
High density polyethylene pipe is the primary material for directional bore pull-through installations. Heat fused butt joints create a continuous, joint free pipe string ideal for water lines, gas lines, force mains, and HDPE electrical conduit. Flexible, corrosion resistant, and compatible with all Oklahoma soil conditions.
PVC Pipe and Schedule Conduit
PVC schedule 40 and schedule 80 conduit for electrical and telecommunications applications. Also used for water service and sewer lateral installations by open trench. PVC is code compliant for most underground electrical conduit applications and is the standard choice for shorter open trench residential and commercial installations.
Steel Casing Pipe
Steel casing pipe for highway crossings, railroad crossings, and other critical utility crossings where ODOT or the railroad authority requires encasement of the carrier pipe. Installed by the jack and bore method. Carrier pipe is installed inside the casing after encasement is complete, with casing spacers and end seals.
Electrical Conduit Underground
PVC and HDPE electrical conduit for direct bore pull-through and open trench installation. We install conduit for service entrances, commercial feeders, transformer connections, utility distribution, and underground branch circuits at the NEC minimum burial depth for the conduit type and location.
Telecommunications Conduit
HDPE and PVC conduit for fiber optic, cable, and telecom runs. Single conduit and multi-conduit bundle installations for internet service providers, municipalities building fiber networks, and telecom contractors crossing roads, subdivisions, and commercial properties in Oklahoma.
Copper and Ductile Iron
Copper water service line installation for residential applications requiring copper from the main tap to the meter. Ductile iron pipe for water main extensions and connections where specified by the municipality or water authority. We coordinate material and fittings with the project requirements and applicable utility company standards.
Pipe and Conduit Installation Projects in Oklahoma
Trinity Boring Solutions crews installing underground pipe and conduit at Oklahoma project sites.


Which Trades Use Underground Pipe and Conduit Installation?
The pipe and conduit installation scope varies significantly based on the trade performing the associated above ground or connection work. Trinity Boring Solutions coordinates directly with the licensed trade contractor to ensure the pipe type, conduit size, burial depth, and installation method align with the specific requirements of each trade application.
Plumbers
Water service lines from the municipal main or well to the building meter set, sewer laterals from the building to the sewer main, and gas service lines from the utility tap to the building entry. HDPE water service lines by directional bore at driveways and road crossings, copper or polyethylene by open trench for the yard run. Sewer laterals by open trench with grade control for gravity flow.
Electricians
PVC and HDPE electrical conduit for service entrance runs, commercial feeder circuits, transformer connections, and site distribution. Single conduit and bundled conduit installations by directional bore at road and driveway crossings. Open trench electrical conduit for yard runs and commercial site distribution where boring is not required.
Telecommunications Contractors
HDPE and PVC conduit for fiber optic backbone runs, last mile fiber to the premises connections, cable television infrastructure, and wireless site backhaul conduit. We install single conduit runs and multi-conduit bundles for telecom contractors across road crossings, subdivision runs, and commercial property installations throughout Oklahoma.
Gas Utilities and Pipeline Contractors
HDPE gas service line installation by directional bore at road and driveway crossings, and by open trench for yard runs. Steel casing installation by jack and bore for highway crossings where ODOT encasement requirements apply. We coordinate with gas utility companies and pipeline contractors and follow applicable Oklahoma Corporation Commission regulations for gas line installation.
Municipalities and Water Authorities
Water main extensions, sewer system connections, and utility infrastructure installations for Oklahoma municipalities and rural water districts. We perform directional bore crossings at state and county roads per ODOT utility accommodation requirements and provide as built documentation for municipal record keeping. The EPA water infrastructure guidance informs best practices for water system pipe material selection and burial requirements.
General Contractors
Underground pipe and conduit scope for commercial construction projects including site utilities, building service connections, and site infrastructure. We work as a subcontractor to general contractors needing underground boring and pipe installation scope that does not require a licensed plumber or electrician but requires specialized boring equipment and field experience with underground utility installations.
How Is HDPE Pipe Fused Before a Directional Bore Pullback?
The most critical step in a successful HDPE pipe pull-through after directional boring is the preparation of the pipe string before pullback begins. HDPE pipe joints for bore installations are connected using butt fusion welding, a heat fusion process that creates fully fused joints as strong as the pipe wall itself and eliminates the mechanical joints that would otherwise create leak risks and pullback failure points.
Our crews perform butt fusion using calibrated fusion equipment and the correct fusion parameters for the pipe diameter, wall thickness, and ambient temperature conditions. The fusion process involves facing the pipe ends to create flat, clean mating surfaces, heating both ends against a temperature controlled heated plate to the required melt temperature, removing the plate, and pressing the melted ends together under controlled interfacial pressure. The result is a monolithic pipe string ready for pullback through the bore hole.
HDPE is the preferred pipe material for directional bore pull-throughs because the fused joints allow the pipe to be dragged through the bore hole in a continuous string at the tensile loads encountered during pullback without joint separation. It is also highly resistant to corrosion, has a long service life in Oklahoma’s variable soil chemistry, and is approved for water, gas, and electrical conduit applications under the applicable codes. The North American Society for Trenchless Technology publishes detailed guidance on HDPE installation by HDD for engineers and utility owners planning directional bore projects.
- Calibrated butt fusion equipment for all HDPE pipe sizes
- Fusion performed by trained operators following ASTM F2620 procedures
- Pipe string prepared on surface and inspected before pullback
- HDPE compatible with water, gas, and electrical conduit applications
- Flexible enough to navigate bore hole curves during pullback
- Corrosion resistant and approved for Oklahoma soil conditions
How Do You Choose the Right Pipe or Conduit Material?
Selecting the correct pipe or conduit material for an underground utility installation in Oklahoma depends on the utility type, the installation method, the burial depth, soil conditions, and any applicable code or utility company specification. The following reference table summarizes the most common combinations for Oklahoma utility work.
| Utility Type | Recommended Material | Typical Installation Method | Key Code Reference |
|---|---|---|---|
| Potable Water Service | HDPE, Copper, or Ductile Iron | HDD bore at crossings, open trench for yard runs | AWWA standards, local water authority spec |
| Natural Gas Service | HDPE (yellow jacket gas pipe) | HDD bore at crossings, open trench for yard runs | Oklahoma Corporation Commission, PHMSA 49 CFR Part 192 |
| Electrical Conduit | PVC Schedule 40 or HDPE | HDD bore at crossings, open trench for direct runs | NEC Article 300.5, ODOT utility accommodation policy |
| Telecom and Fiber Optic | HDPE or PVC Schedule 40 | HDD bore at road crossings, open trench for subdivision runs | Local dig permit requirements, 811 locate laws |
| Sewer Lateral | PVC SDR 35 or Schedule 40 | Open trench with grade control | Local plumbing code, municipal sewer standard |
| Highway Crossing Encasement | Steel Casing Pipe | Jack and bore | ODOT utility accommodation policy, railroad requirements |
This table is a general reference. Always confirm material and depth requirements with the applicable code authority and your licensed trade contractor. Trinity Boring Solutions coordinates directly with the licensed plumber, electrician, or gas contractor on every project to ensure the pipe material and installation approach meets the project requirements.
How Does Trenchless Pipe and Conduit Installation Work?
Watch these videos to understand how directional boring and trenchless methods are used to install pipe and conduit underground in Oklahoma without surface disruption.
A detailed look at the horizontal directional drilling process used to pull pipe and conduit through bores under roads and obstacles.
An overview of how horizontal directional drilling installs underground pipe and conduit for utility crossings across roads, driveways, and developed properties.
How Is Underground Pipe Inspected and Pressure Tested?
A correctly installed underground pipe or conduit is only valuable if it performs reliably for its designed service life. Trinity Boring Solutions supports inspection and pressure testing requirements for underground pipe installations as required by the utility type, the owner’s specification, and the applicable code.
Pre-Pullback Pipe Inspection
Before any HDPE pipe string is pulled through a bore hole, we inspect all fusion joints visually and check for bead integrity. Defective joints are cut out and re-fused before the pipe enters the bore hole. This prevents costly bore hole access issues after the pipe is installed.
Mandrel Testing for Conduit
For electrical conduit and telecommunications conduit, we support mandrel testing to verify that the bore hole is clear, the conduit is fully seated, and the inside diameter is unobstructed for wire or fiber pull. This is critical for conduit that will be used immediately after bore completion.
Hydrostatic Pressure Testing
Water service line installations are tested hydrostatically per AWWA standards before connection to the building or distribution system. We coordinate the pressure test with the licensed plumber or the water authority representative and document the test results for project records.
Gas Line Pressure Testing
Gas service line installations are pressure tested per gas company requirements and Oklahoma Corporation Commission regulations before the line is placed in service. We coordinate test procedures with the gas utility company and the licensed plumbing or gas contractor responsible for the final connection and commissioning.
As Built Documentation
For projects requiring as built records, we provide bore path depth and alignment documentation and pipe installation records. This information is required by ODOT for permitted road crossings and by many municipalities for utility system records and future conflict avoidance during other underground work.
Backfill and Surface Restoration
After pipe or conduit installation is complete and tested, entry and exit pits are backfilled with compacted material and surface is restored to match the surrounding area. We coordinate restoration standards with the property owner, the general contractor, or the municipality as appropriate for the project type.
For sewer system installations, the National Association of Sewer Service Companies provides inspection and assessment standards that are referenced by many Oklahoma municipalities for sewer lateral inspection requirements. Trinity Boring Solutions coordinates with licensed sewer contractors and municipal inspectors to ensure installed sewer pipe meets the applicable standards.
Why Do Contractors Choose Trinity for Pipe and Conduit Installation?
Pipe and conduit installation quality starts with the bore. If the bore is the wrong diameter, the wrong depth, or not aligned correctly with the connection points, the pipe installation will either fail during pullback or create problems at the connection. Trinity Boring Solutions controls the entire scope from bore planning through conduit pullback so the installation is correct before the first length of pipe enters the ground.
We maintain a large fleet of HDD equipment that covers every scale of pipe and conduit installation, from small residential water service line bores with compact rigs to large diameter commercial conduit installations requiring full size HDD equipment. Our Ditch Witch equipment capability and operator experience means we can select the right rig for the bore diameter and pipe size on every project without trying to adapt a mismatched machine to the work.
Oklahoma contractors who work with Trinity Boring Solutions on pipe and conduit installations benefit from a team that understands how the pipe installation fits into the larger project, communicates proactively, and coordinates directly with the licensed trade contractors whose work depends on our underground scope being complete and correct. We are familiar with the requirements from Oklahoma Corporation Commission for gas pipeline work and with ODOT requirements for utility crossings within state highway right of way.
- Bore sized correctly for the conduit being installed
- HDPE butt fusion by trained operators
- Single source for bore and conduit installation
- Coordinates directly with licensed trade contractors
- Pressure testing and inspection support
- ODOT and OCC compliance coordination
- 811 locate before every project
What Other Underground Utility Installation Services Does Trinity Offer?
Pipe and conduit installation works alongside these related services from Trinity Boring Solutions.
Horizontal Directional Drilling
The bore that receives the pipe or conduit. HDD for road crossings, driveway crossings, and obstacle crossings across Oklahoma. Bore sized correctly for the conduit being pulled.
Jack and Bore Steel Casing
Steel casing installation for highway and railroad crossings where encasement of the carrier pipe is required. ODOT approved jack and bore method with carrier pipe installation inside the casing.
Open Trench Utility Installation
Open trench for utility runs in open ground where boring is not required. Proper bedding, compacted backfill, and surface restoration included. Mini excavator available for residential sites.
Bore Path Planning
Site evaluation, utility conflict analysis, and bore path planning for projects requiring careful routing before pipe or conduit installation begins.
Hydrovac Daylighting
Non destructive utility exposure before boring or trenching in congested utility corridors. Protects existing pipe and conduit from damage during new underground utility installation work.
Trade Subcontractor Services
Directional boring and pipe installation as a subcontractor for licensed plumbers and electricians. We handle the underground scope so licensed trades can focus on connections and above ground work.
Free Bore Planner
Plan Your Bore
Type the address of your job. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Pipe and Conduit Installation Oklahoma FAQs
Answers to the questions Oklahoma contractors and project owners ask most about underground pipe and conduit installation.
What types of pipe and conduit does Trinity Boring Solutions install underground in Oklahoma?
What is the difference between HDPE and PVC for underground pipe and conduit in Oklahoma?
How is HDPE pipe fused for directional bore pull-through installations in Oklahoma?
What sizes of pipe and conduit can Trinity Boring Solutions install?
Can Trinity Boring Solutions install conduit for telecommunications and fiber optic runs in Oklahoma?
What is a steel casing pipe and when is it required in Oklahoma?
Does Trinity Boring Solutions perform pressure testing after pipe installation?
Can Trinity Boring Solutions install multiple conduits in a single bore in Oklahoma?
What utility types use HDPE pipe installed by directional boring in Oklahoma?
How do I schedule pipe or conduit installation in Oklahoma with Trinity Boring Solutions?
Need Underground Pipe or Conduit Installation in Oklahoma?
Call Trinity Boring Solutions or submit a quote request. We install HDPE, PVC, steel casing, electrical conduit, and telecommunications conduit by boring and open trench methods across Oklahoma.
(405) 409-7423 | darren@trinityboringsolutions.com
Call (405) 409-7423
Get a Free Quote
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to just under 4,000 feet in a single shot, with longer runs bored in sections, 3/4 inch service line through 48 inch pipe, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.