Bore Planner: Map Your Directional Bore and Request a Quote
Mark your job on the map, tell us what is going in and send it with your contact details. Trinity Boring Solutions receives the length, the location and what you are installing, so the first call is about your job. No map handy? Type the details instead.
1Find the site
Search a street address, or zoom and drag the map to the site.
2Mark the start and the end
Tap the map where the bore starts.
- AStart
- Not set
- BEnd
- Not set
Surface distance between the pins. Drag either pin to adjust. Final footage is confirmed after a site review and utility locates.
3Describe the job
For an emergency, the fastest way to reach Trinity is to call (405) 409-7423.
4Send it to Trinity
Your quote request
Mark the job on the map to build your quote request.
Trinity reviews every request before pricing it. Nothing is charged or scheduled from this page. Prefer to talk it through? Call (405) 409-7423 or use the contact form.
How does the Bore Planner work?
- Find the site. Search a street address or zoom the aerial map to the property.
- Mark the bore. Tap once where the bore starts and once where it ends. The planner measures the surface distance between the two pins.
- Describe the job and send. Choose the type of work, what is going in and what it crosses. Add your contact details and any plans or photos, then send it to Trinity.
What happens after you send your bore plan?
Trinity reviews the scope and gets in touch with you about the job. The planner does not show a price. Every bore is priced from its own footage, ground conditions, depth and crossings, and final footage is confirmed after a site review and utility locates.
The planner does not replace a utility locate. Call 811 or contact your state 811 center before any work starts.
Want background before you send? Read what drives directional boring cost in Oklahoma and how Trinity handles bore path planning.
Bore Planner questions
Does the Bore Planner give a price?
No. The planner collects the scope so Trinity can review the job. Pricing depends on footage, ground conditions, depth, pipe size and what the bore crosses.
How accurate is the bore length?
The planner measures the straight line surface distance between the two pins. The drilled path is usually longer because the bore enters and exits the ground at an angle and curves under the crossing. Trinity confirms final footage after a site review and utility locates.
Can I request a quote without using the map?
Yes. Under step 2, choose No map, then type the job site address and a rough length. The rest of the request works the same way.
Can I send plans or photos with my request?
Yes. Attach PDF plans, drawings or site photos in the last step before you send.
What if the pipe size or timing is not known yet?
Choose Not sure yet for the size and leave the timing blank. Add anything that helps in the notes, such as required depth, known rock or who supplies the pipe.
Where does the aerial imagery come from?
The aerial view uses public imagery from USGS The National Map and the USDA National Agriculture Imagery Program. Public imagery can be a few years old, so recent construction may not appear. Address searches are answered by the U.S. Census Bureau geocoder.
© 2026 Trinity Boring Solutions, Inc. All rights reserved.
Terms of use: The Bore Planner is provided for planning a job and requesting a quote from Trinity Boring Solutions. Its design, text and code may not be copied, reproduced or used on another website or in another product without written permission from Trinity Boring Solutions, Inc. Map imagery and map data belong to the providers credited on the map.