Charlotte Texas Directional Boring: Webb Soil, FM 140 and Clay
Quick Answer: From Yukon, Charlotte is 540 road miles away, so we staff Edwards Avenue work with our crews and vetted partners. Trinity Boring Solutions handles directional boring, also called horizontal directional drilling (HDD), for routes crossing Edwards Avenue or connecting properties along it. The USDA soil survey maps Webb soil across 25 percent of Charlotte, and sticky clay at depth can grip pipe and build up on the reamer. We plan staged reaming and have pipe ready to pull while the hole is open.
Charlotte bores at a glance
- Incorporated city in Atascosa County, Texas. Population 1,620 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 540 miles, about 10.3 hours of driving.
- Ground: Webb soil is mapped on 25 percent of the area, with clay about 40 inches down.
- Rock: bedrock is mapped within 60 inches on 6 percent of the area.
- Highways inside the boundary: FM 140, Texas State Highway 97, FM 1333 and FM 1549. State permit office: TxDOT San Antonio District.
- Railroad track inside the boundary: none mapped.
- Public water: City of Charlotte, groundwater wells.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Which contractor handles directional boring on Edwards Avenue in Charlotte?
From Yukon, the 540 road miles to Charlotte shape mobilization, and we staff Edwards Avenue jobs with our own crews and vetted partner drilling contractors. Charlotte is in Atascosa County, where the Census Bureau Vintage 2024 estimate puts its population at 1,620. We install water, sewer, gas, electric conduit and fiber along property routes or beneath Edwards Avenue when plans and utility locations call for a crossing.
Our main office is in Yukon, Oklahoma, and Charlotte work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. For a service connection off Hindes Avenue or a larger casing run near FM 140, our range runs from 3/4 inch lines to 48 inch casing and 10 feet to 5,000 feet long. Our family business began in 1965, and we have done directional boring since 1982.

What does the soil survey show beneath Charlotte and Webb soil?
The USDA soil survey maps Webb soil across 25 percent of Charlotte, with Webb fine sandy loam listed as the leading map unit. Elmendorf soil covers 20 percent, Amphion 17 percent and Hanis 16 percent. About 40 inches below the surface, the survey maps clay in 38 percent of the area and sandy clay in 25 percent. Average clay content at that depth is 38 percent, and heavy clay is mapped across 80 percent of the city. These are mapped patterns, not test borings. Sticky clay can collect on a reamer and tighten around pipe, so the exact bore path matters.
| USDA soil survey, inside the Charlotte city limits | What is mapped |
|---|---|
| Soil series mapped | Webb 25 percent, Elmendorf 20 percent, Amphion 17 percent, Hanis 16 percent and Floresville 13 percent |
| Texture at the surface | fine sandy loam 39 percent, sandy clay loam 35 percent and clay loam 20 percent |
| Texture about 40 inches down | clay 38 percent, sandy clay 25 percent and sandy clay loam 19 percent |
| Engineering class about 40 inches down | lean clay (CL) 76 percent and fat clay (CH) 22 percent |
| Average clay content about 40 inches down | 38 percent |
| Bedrock mapped within 60 inches | 6 percent of the area (0 percent hard rock, 6 percent weathered rock) |
| Seasonal water table within 60 inches | 0 percent of the area |
| Flood prone soils | 1 percent of the area |
| High corrosion risk for uncoated steel | 80 percent of the area |
The USDA soil survey maps bedrock within 60 inches in 6 percent of Charlotte, mostly as weathered bedrock; hard bedrock is not mapped at that depth. Typical bedrock depth is 49 inches, so a bore may meet changing material rather than a uniform layer. Seasonal water tables are not mapped within 60 inches, and flood prone soils cover 1 percent. High steel corrosion risk is mapped across 80 percent, so the line owner should choose any protection for steel casing or tracer wire. The Cook Mountain Formation, of Bartonian age, includes clay and sandstone; changing from clay to sandstone can slow drilling and affect steering.
How do we bore through Charlotte clay and Webb soil?
Charlotte’s mapped clay can hold an open hole but stick to the reamer. We adjust the fluid and reaming sequence to the ground along the planned route, including the Webb soil areas.
- Clay control: Charlotte’s mapped heavy clay can stick to the reamer, so we use a thinner fluid mix and polymer, then open the hole in stages.
- Same day pull: Where Webb soil holds the bore open, we keep pipe ready so it can go in before sticky ground tightens around it.
- Utility exposure: Near City of Charlotte water routes or an electric conduit crossing, we hydrovac pothole each marked line before bringing the drill close.
- Steering checks: Along FM 140, we track the drill head from the surface and log depth and pitch so changes in clay or sandstone do not go unchecked.

What might a new line cross near Edwards Avenue in Charlotte?
FM 140, Texas State Highway 97, FM 1333 and FM 1549 run within Charlotte, while Texas State Highway 85 is close outside the limits. Work in any of those highway rights of way needs the TxDOT process. Edwards Avenue is the longest named street in the city at 2.52 miles. Hindes Avenue runs 1.52 miles, and Blunzer Road runs 1.41 miles. Those long street corridors can make a bore useful for reaching properties without opening pavement, but the route still has to be checked against marked utilities and access for entry and exit pits.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| FM 140 | State highway | 1.6 roadway miles inside | State highway office |
| Texas State Highway 97 | State highway | 1.5 roadway miles inside | State highway office |
| FM 1333 | State highway | 1.1 roadway miles inside | State highway office |
| FM 1549 | State highway | 0.3 roadway miles inside | State highway office |
| Texas State Highway 85 | Highway nearby | 0.2 miles outside | State highway office |
No railroad is mapped inside Charlotte or within one mile outside it, so there is no mapped track crossing to plan around. No named streams or lakes and ponds are mapped in or near the city. The survey does map 0.37 miles of unnamed drainage within the limits, so a route near a drainage feature needs a site specific review. No street crossings of named streams are mapped. If a planned bore reaches a water crossing, its possible U.S. Army Corps of Engineers jurisdiction is checked during planning.
Who approves a bore on Atascosa County roads near Charlotte?
Charlotte is an incorporated city, so streets such as Edwards Avenue belong to the city. FM 140, Texas State Highway 97, FM 1333 and FM 1549 are state highways, and work in their right of way needs a TxDOT utility permit reviewed by the San Antonio District. The line owner, not Trinity, files through TxDOT’s online RULIS system. We give the owner the bore plan and profile for the filing. For a highway crossing, electric and communication lines need 60 inches of cover below the lowest crossed grade; water lines need 60 inches, and pressurized sewer lines need 60 inches. The district can set different depths in the permit.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Which utilities should Charlotte crews check with the City of Charlotte?
The City of Charlotte public water system serves 2,247 people through 749 service connections and draws from groundwater wells. Before a bore crosses a marked water line, we use hydrovac potholing to expose it and confirm its depth. Electric service reported in Atascosa County includes AEP Texas Central, City of San Antonio, Karnes Electric Cooperative and Medina Electric Cooperative. The electric line owner at the specific Charlotte address needs to be confirmed before conduit specifications are set.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| City of Charlotte | Public water system | Groundwater wells | 749 connections, 2,247 people served |
| AEP Texas Central, City of San Antonio, Karnes Electric Cooperative and Medina Electric Cooperative | Electric utilities reporting service in Atascosa County | EIA Form 861 | Confirm the line owner by address |
The American Community Survey 2019 to 2023 five year estimates put Charlotte’s median housing year at 1976. The survey says 24 percent of housing units were built before 1960, 55 percent from 1960 to 1999 and 21 percent in 2000 or later. That range means a replacement bore along Hindes Avenue may follow older buried infrastructure, while newer service work may need a separate route. We hydrovac pothole marked utilities before drilling near them because surface marks do not show depth.

How far is Charlotte from Christine and other nearby places?
Charlotte is in Atascosa County, at an elevation of 545 feet, and covers 2.04 square miles. Its ZIP code is 78011. Jourdanton, the county seat, is 10.4 miles east; Christine is 13.3 miles east. Pleasanton is 14.4 miles northeast and is the nearest larger city. The Yukon yard is 540 road miles away, a drive of 10.3 hours. That distance is part of mobilization planning for Charlotte jobs, whether the bore follows FM 140 or serves a property outside the city limits.
Places near Charlotte
- Directional boring in Jourdanton: 10.4 miles east
- Directional boring in Christine: 13.3 miles east
- Directional boring in Pleasanton: 14.4 miles northeast
- Directional boring in Poteet: 14.5 miles northeast
- Directional boring in Bigfoot: 16.8 miles northwest
Which jobs call for a bore near Hindes Avenue in Charlotte?
- Highway crossing: A line beneath FM 140 can be bored rather than trenched through pavement, with the route and right of way planned for TxDOT review.
- Water service: A new connection near a City of Charlotte groundwater well route needs marked water lines exposed before the drill approaches them.
- Fiber route: A fiber bore along Edwards Avenue can pass beneath street pavement, with entry and exit pits placed in suitable work areas.
- Electric conduit: Near Texas State Highway 97, we first confirm the line owner and expose marked utilities along the planned conduit path.
- Sewer replacement: A replacement line off Hindes Avenue can use a bore to avoid an open cut along the street, subject to route and utility checks.
- Drainage crossing: A route near Charlotte’s mapped unnamed drainage needs review for depth and crossing conditions before the bore plan is set.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What drives the price of directional boring near FM 140 in Charlotte?
A map pin matters near FM 140 because a few blocks can change the street, utility crossings and room for bore pits. Send the Charlotte address or pin, what goes in the ground, the pipe or conduit size and the footage. A sketch or plans help us see the route, access and any pavement or drainage crossings before we scope the work.
Price follows the job details, not length alone. Webb soil and the clay mapped at about 40 inches affect drilling and reaming. Crossings of FM 140 or other utilities add locating and exposure work, while pavement, concrete and drainage features can change pit placement and restoration needs. Pit size, excavator time and sand backfill also count. Charlotte is 540 road miles from Yukon, so mobilization is part of the logistics. High profile or emergency work can call for a different plan.
Questions people ask about boring in Charlotte
Does Trinity take directional boring jobs in Atascosa County around Charlotte, and who staffs them?
Yes. We take directional boring work in Charlotte and across Atascosa County. Our own crews and partner drilling contractors Trinity has vetted handle the field work, while customers deal with Trinity from the first call through the bore log. A route along Edwards Avenue is planned around its access, marked utilities and bore pit locations.
Who owns electric lines in Atascosa County near Charlotte, and who confirms conduit specs?
Electric service reported in Atascosa County includes AEP Texas Central, City of San Antonio, Karnes Electric Cooperative and Medina Electric Cooperative. We confirm which company owns the line at the Charlotte job address before conduit specifications are set. Near a City of Charlotte water route, we also expose marked utilities before drilling close to them.
Does Charlotte control Blunzer Road, and can a bore avoid cutting the street?
Blunzer Road is a city street in incorporated Charlotte, so it is under city authority. Directional boring can carry a line below the pavement instead of opening a trench through the street. The bore still needs suitable entry and exit pits, and the route has to account for marked utilities beneath Blunzer Road.
How old are buried lines near Hindes Avenue in Charlotte, and do replacements need bores?
The American Community Survey 2019 to 2023 five year estimates put Charlotte’s median housing year at 1976, with 24 percent of housing units built before 1960. A replacement route near Hindes Avenue may encounter older services, but the survey does not date buried lines. We expose marked utilities before drilling near them and plan around the actual route.
Does Webb soil in Charlotte corrode steel, and what pipe should a bore use?
High steel corrosion risk is mapped across 80 percent of Charlotte, including mapped Webb soil areas. The line owner selects any coating for steel casing or tracer wire. HDPE is not affected by soil corrosion. The material choice depends on the line and plans, so we use the specified pipe for a bore near Edwards Avenue.
What ground does a Charlotte bore pass through in Webb soil at depth?
The USDA soil survey maps Webb soil across 25 percent of Charlotte, and clay covers 38 percent of the mapped area at about 40 inches below the surface. Sandy clay accounts for 25 percent at that depth. Sticky clay can cling to a reamer, so a bore near FM 140 may need staged reaming and careful fluid control.
Does Trinity cover Jourdanton and rural sites outside Charlotte too?
Yes. We take work in Texas beyond Charlotte, including around Jourdanton and rural properties in Atascosa County. Jourdanton is 10.4 miles east and is the county seat. For a route outside Charlotte, the address or map pin helps us assess access, utility crossings and mobilization from the Yukon yard.
How early should I call Texas811 for a Charlotte bore near Edwards Avenue?
Count back at least 48 hours from the planned start, excluding Saturdays, Sundays and legal holidays, and do not request a locate more than 14 days ahead. For work near Edwards Avenue, a delay of more than 14 days past the original notice requires a new notice. If marks wear off or move, request refreshed marks before work continues.
What affects directional boring cost near FM 140 in Charlotte?
The route, pipe size and footage matter, along with the clay mapped near FM 140, utility crossings, pavement, pit work and any drainage crossing. Charlotte’s 540 road miles from Yukon also affect mobilization. A map pin and sketch help us see the actual access and ground conditions before we prepare a job scope.
Where the Charlotte facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Charlotte
- U.S. Census Bureau, TIGER/Line 2024: Charlotte boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Charlotte
- U.S. Census Bureau, American Community Survey 2019 to 2023: Charlotte housing units and year built
- Macrostrat geologic map compilation: map units under Charlotte
- U.S. EPA Safe Drinking Water Information System: public water systems serving Charlotte
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Atascosa County
- U.S. Geological Survey, Elevation Point Query Service: Charlotte elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Charlotte
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Charlotte
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Charlotte, Texas
Type the address of your job in Charlotte. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Charlotte
Same county: Lytle · Leming. All counties: Texas county list.
