Texline Texas Directional Boring: Sunray Loam, Clay Loam, BNSF Railway

Quick Answer: The USDA soil survey maps Sunray loam beneath Texline, where directional boring, also called horizontal directional drilling (HDD), can place lines below US 87 without cutting the roadway. Texline is 376 road miles from our Yukon, Oklahoma main office, so a bore near BNSF Railway needs mobilization planned with the track crossing. Clay loam is mapped at about 40 inches across 82 percent of town, and sticky cuttings can build on a reamer. We plan the reaming and fluid for that ground before pulling in pipe.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Texline bores at a glance

  • Incorporated city in Dallam County, Texas. Population 492 (Census Bureau 2024 estimate).
  • Road distance from our Yukon, Oklahoma main office: 376 miles, about 7 hours of driving.
  • Ground: Sunray soil is mapped on 52 percent of the area, with clay loam about 40 inches down.
  • Rock: no bedrock is mapped in the top 60 inches.
  • Highways inside the boundary: US 87 and FM 296. State permit office: TxDOT Amarillo District.
  • Railroad track inside the boundary: BNSF Railway, with 3 mapped street and rail crossings.
  • Public water: Texline Municipal Water System, groundwater wells.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Which contractor handles directional boring near Texline and Junkyard Creek?

We take directional boring work in Texline, an incorporated town in Dallam County with 492 people, according to the Census Bureau Vintage 2024 estimate. A water service near the Texline Municipal Water System, sewer along 4th Street, gas, electric conduit or fiber can each call for a different bore plan. We size the work to the line and route, including crossings on US 87.

Our main office is in Yukon, Oklahoma, and Texline work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. We have had no utility strike in over 25 years, and directional boring has been part of our family business since 1982, which started in 1965. Around the Texline Municipal Water System and the electric lines reported in Dallam County, we expose marked utilities before drilling near them.

Trinity Boring Solutions Vermeer D24x40 directional drill set up for a bore
Our Vermeer D24x40 directional drill set up for a bore. Photos on this page are from our jobs in Oklahoma and Texas.

What is Texline ground like to bore in Sunray soil?

The USDA soil survey maps Sunray soil across 52 percent of Texline, with Sunray loam, 0 to 1 percent slopes, covering 47 percent. Gruver, Conlen and Dumas are also mapped soil series. At about 40 inches below the surface, the mapped texture is clay loam in 82 percent of town and silt loam in 17 percent. The survey maps heavy clay at that depth across 71 percent of the area, while sandy ground is not mapped there. These are soil patterns, not test borings. Clay loam can hold an open hole, but sticky material can ball up on the reamer.

USDA soil survey, inside the Texline city limitsWhat is mapped
Soil series mappedSunray 52 percent, Gruver 19 percent, Conlen 17 percent and Dumas 11 percent
Texture at the surfaceloam 100 percent
Texture about 40 inches downclay loam 82 percent and silt loam 17 percent
Engineering class about 40 inches downlean clay (CL) 82 percent and silt (ML) 17 percent
Average clay content about 40 inches down31 percent
Bedrock mapped within 60 inchesNone mapped
Seasonal water table within 60 inches0 percent of the area
Flood prone soils0 percent of the area
High corrosion risk for uncoated steel19 percent of the area

Bedrock is not mapped in the top five feet of Texline, though the geologic map does show Cenozoic sedimentary rocks from the Paleocene and Holocene sand sheet deposits. The survey maps no seasonal water table within 60 inches and no flood prone soils, so those conditions are not mapped as local constraints. High steel corrosion risk is mapped in 19 percent of town. For steel casing or tracer wire near Market Street, the line owner should weigh that mapped concern when choosing protection; HDPE does not share the steel corrosion issue.

How do crews bore Texline clay loam?

Sunray loam and clay loam mapped beneath Texline call for controlled reaming, not a rushed pull. We track the drill head from the surface and log depth and pitch as the bore advances near local streets and utilities.

  1. Because clay loam is mapped at about 40 inches across 82 percent of Texline, we use staged reaming and fluid suited to sticky cuttings.
  2. When the bore route follows Market Street, we keep fluid pressure controlled beneath pavement and watch returns so ground does not lift.
  3. Before approaching marked lines near the Texline Municipal Water System, we hydrovac pothole to expose each utility and confirm its depth.
  4. Near BNSF Railway, we track the head from the surface and log depth and pitch while following the approved crossing plan.
Bore pit with a 6 inch PVC sleeve, traffic cones and blue water line flags at NE 24th Street in Oklahoma City
A bore pit with a 6 inch PVC sleeve, traffic cones and blue water line flags at NE 24th Street in Oklahoma City.

What is in the way of a new Texline line near Market Street?

US 87 and FM 296 each run through Texline, with 1.0 mapped roadway mile of each inside town limits. Utility work in either highway right of way needs review by TxDOT’s Amarillo District. Market Street is the longest named street in town at 1.08 miles, followed by 4th Street at 1.04 miles and 2nd Street at 1.02 miles. A bore route under these roads can avoid open cuts, but the plan must account for pavement and existing lines.

CrossingTypeMapped extentWho has a say
US 87US highway1 roadway miles insideState highway office
FM 296State highway1 roadway miles insideState highway office
BNSF RailwayRailroad1.59 track miles insideThe railroad
Junkyard CreekStream nearby0.1 miles outsideChecked for Corps of Engineers jurisdiction
West Rita Blanca CreekStream nearby0.6 miles outsideChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

BNSF Railway has 1.59 track miles inside Texline, on the BNSF Railway Dalhart Subdivision. Public records map 3 street and rail crossings in town, so a line near the tracks needs a route that accounts for railroad access and approval. Junkyard Creek is 0.1 miles from the town limits, and West Rita Blanca Creek is 0.6 miles away. No named stream crossings are mapped on Texline streets, so creek work would depend on the actual route beyond the limits.

Whose permission does a Texline bore in Dallam County need?

US 87 and FM 296 are the named state and US highways through Texline, and TxDOT’s Amarillo District reviews utility work in their right of way. The utility that owns a line files for the TxDOT permit through RULIS; we prepare the bore plan and profile and work under the permit issued to that owner. Because Texline is incorporated, we treat its city streets as belonging to the city when planning a bore. A crossing of BNSF Railway track needs an agreement from BNSF, and a route near Junkyard Creek is checked for Corps jurisdiction during planning.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Which utilities serve Texline near Texline Municipal Water System lines?

Texline Municipal Water System is locally owned and draws from groundwater wells. It serves 448 people through 278 service connections, so a proposed service route may need to avoid its buried lines. Electric service providers reporting in Dallam County are Southwestern Public Service, Rita Blanca Electric Cooperative, Southwestern Electric Cooperative and Tri-County Electric Cooperative. We confirm the line owner before planning an electric conduit bore because the provider can vary by address.

Line ownerWhat it isSourceSize
Texline Municipal Water SystemPublic water systemGroundwater wells278 connections, 448 people served
Southwestern Public Service, Rita Blanca Electric Cooperative, Southwestern Electric Cooperative and Tri-County Electric CooperativeElectric utilities reporting service in Dallam CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

Texline’s median housing year is 1989 in the American Community Survey 2019 to 2023 five year estimates, a detail we keep in view when planning underground work. The same survey estimates that 16 percent of homes were built before 1960, 44 percent from 1960 to 1999 and 40 percent in 2000 or later. That mix can mean a route for replacement work as well as new service near Market Street. Before drilling near the water system or an electric line, we hydrovac pothole each marked utility on the planned path because paint does not show depth.

Reel of yellow polyethylene gas pipe on a trailer staged for a directional bore
A reel of yellow polyethylene gas pipe on a trailer, staged for a directional bore.

Do you cover Texline and nearby Dalhart?

Texline is in Dallam County in the Texas Panhandle, with an elevation of 4,682 feet and land area of 1.02 square miles. Its ZIP code is 79087. Dalhart, the county seat and nearest larger city listed, is 35.8 miles southeast and has a population of 8,443. From our Yukon, Oklahoma main office, the road distance is 376 miles and the drive is 7.0 hours. That distance matters when we plan crew mobilization for a bore on US 87 or a rural route outside Texline.

Places near Texline

What boring work comes up around Texline and 4th Street?

  • Highway crossing: A bore beneath US 87 or FM 296 keeps a utility below the roadway, with TxDOT review for right of way work.
  • Water service: A new connection near Texline Municipal Water System needs a route checked against its groundwater lines and existing connections.
  • Fiber route: A fiber bore along Market Street can pass below pavement while avoiding buried utilities exposed before drilling.
  • Rail crossing: A route beneath BNSF Railway needs the railroad’s agreement and a plan for casing, depth and flagging.
  • Creek crossing: Work near Junkyard Creek needs route planning that checks whether the crossing falls under Corps jurisdiction.
  • Street service: A bore along 4th Street can connect a property while limiting cuts through the street surface.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

How do I get a quote for Texline work near US 87?

For a bore near US 87, start with the address or a map pin so we can see the route. Tell us what goes in the ground, such as water service near the Texline Municipal Water System or fiber along Market Street. Include pipe or conduit size and footage. A sketch or plans help us see crossings such as BNSF Railway and choose a useful route.

A short run through Sunray loam with few crossings is simpler to plan than a route beneath US 87 or BNSF Railway. Cost depends on length, pipe or conduit size, soil, utilities to expose, pavement, creek or drainage crossings, pits, excavator time and sand backfill. The 376 road miles from Yukon affect mobilization. Emergency or high profile work can also change the scope. A route map helps us assess the details before pricing.

Questions people ask about boring in Texline

Does Trinity take directional boring jobs in Texline and Dallam County?

Yes. We take Texline work with our own crews and partner drilling contractors we have vetted, while keeping your contact with Trinity from the first call through the bore log. A route near US 87 or the Texline Municipal Water System gets planned for its local crossings and ground.

Who approves our directional boring permit for a crossing under US 87 in Texline?

TxDOT’s Amarillo District reviews utility work in the US 87 right of way through Texline. The utility that owns the line submits the application in TxDOT’s RULIS system. We prepare the bore plan and profile and work under the permit issued to that utility owner.

What does BNSF Railway require for our bore beneath it in Texline?

A bore beneath BNSF Railway needs an agreement from the railroad that owns the track. The agreement sets the crossing requirements, including casing, depth and flagging. Texline has 1.59 track miles inside town limits, so the route and railroad review need to be part of planning.

Can a line be bored under Junkyard Creek near Texline?

A bore may be planned for a creek crossing, but the route has to be checked during planning for U.S. Army Corps of Engineers jurisdiction. Junkyard Creek is 0.1 miles from Texline’s limits, and West Rita Blanca Creek is 0.6 miles away, so the exact site matters.

Who runs Texline’s public water system, and where does its water come from as we plan underground work?

Texline Municipal Water System is owned by the local government and uses groundwater wells. Texline’s water system serves 448 people through 278 service connections, figures we consider when planning underground work. We check for its lines before a bore near Market Street or another proposed service route.

Which electric line owner should I check in Texline and Dallam County?

The county reports electric service from Southwestern Public Service, Rita Blanca Electric Cooperative, Southwestern Electric Cooperative and Tri-County Electric Cooperative. The provider for a particular Texline address must be confirmed before a conduit bore, so ask the line owner about conduit specifications for the project.

Does Trinity cover Dalhart and rural sites outside Texline?

We take work in Texas, including jobs outside Texline town limits. Dalhart is 35.8 miles southeast and is the nearest larger city listed for Texline. A rural route still needs its address or map pin so we can assess the ground and crossings.

How much notice does Texas811 need for a Texline bore near Market Street?

Request a Texas811 locate at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before work. If the start slips more than 14 days past the original notice for a Market Street bore, submit a new request. In Texline, we use Texas811 to refresh worn or moved marks before directional boring work continues.

What affects the cost of directional boring along US 87 in Texline as we plan a crossing?

The price depends on the job details, including length, pipe or conduit size, Sunray soil conditions, pavement and the number of utilities to expose. A crossing beneath US 87 or BNSF Railway adds planning demands. Mobilization from Yukon matters too, since Texline is 376 road miles from our main office.

Where the Texline facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Texline

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Texline, Texas

Type the address of your job in Texline. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Texline

All counties: Texas county list.