Scottsville Texas Directional Boring: Kirvin Soil, FM 2199 and Union Pacific Track
Quick Answer: Kirvin soil turns sticky at depth, so we use directional boring, also called horizontal directional drilling (HDD), beneath FM 2199 and other Scottsville routes. Our Yukon, Oklahoma main office is 356 road miles away, and the Union Pacific track shapes crossing access. The USDA soil survey maps clay at 40 inches, where cuttings can cling to the reamer and grip the pipe. We control fluid returns near FM 2199 pavement and stage the reaming before pulling a line.
Scottsville bores at a glance
- Incorporated city in Harrison County, Texas. Population 339 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 356 miles, about 7.2 hours of driving.
- Ground: Kirvin soil is mapped on 27 percent of the area, with clay about 40 inches down.
- Rock: bedrock is mapped within 60 inches on 27 percent of the area.
- Highways inside the boundary: FM 2199 and FM 1998. State permit office: TxDOT Atlanta District.
- Railroad track inside the boundary: Union Pacific, with 6 mapped street and rail crossings.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Which contractor handles directional boring near FM 2199 in Scottsville?
Kirvin soil is the largest mapped series in Scottsville, and the Census Bureau Vintage 2024 estimate puts the city population at 339. Along FM 2199, Harkins Lane, or the Union Pacific corridor, we install water, sewer, gas, electric conduit, and fiber by directional bore, with the route set to the line and access.
Our main office is in Yukon, Oklahoma, and Scottsville work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our range runs from a 3/4 inch service line along Harkins Lane to 48 inch casing for a larger crossing near the Union Pacific track. Our family business began in 1965 and has done directional boring since 1982, serving Oklahoma and Texas routes such as FM 2199.

What is Kirvin soil like to bore in Scottsville?
The USDA soil survey maps Kirvin soil across 27 percent of Scottsville, followed by Latex at 23 percent, Eastwood at 14 percent, Keatchie at 12 percent, and Scottsville soil at 9 percent. These are mapped area shares, not test borings. About 40 inches below the surface, clay is mapped across 50 percent of the area, clay loam across 23 percent, sandy clay loam across 20 percent, and fine sandy loam across 7 percent. The average clay content there is 35 percent, so sticky cuttings and pipe grip deserve attention.
| USDA soil survey, inside the Scottsville city limits | What is mapped |
|---|---|
| Soil series mapped | Kirvin 27 percent, Latex 23 percent, Eastwood 14 percent, Keatchie 12 percent and Scottsville 9 percent |
| Texture at the surface | fine sandy loam 50 percent, very fine sandy loam 43 percent and gravelly fine sandy loam 7 percent |
| Texture about 40 inches down | clay 50 percent, clay loam 23 percent and sandy clay loam 20 percent |
| Engineering class about 40 inches down | lean clay (CL) 49 percent, fat clay (CH) 43 percent and silty clayey sand (SC SM) 7 percent |
| Average clay content about 40 inches down | 35 percent |
| Bedrock mapped within 60 inches | 27 percent of the area (0 percent hard rock, 27 percent weathered rock) |
| Seasonal water table within 60 inches | 47 percent of the area |
| Flood prone soils | 7 percent of the area |
| High corrosion risk for uncoated steel | 46 percent of the area |
USDA soil mapping shows weathered bedrock within 60 inches across 27 percent of Scottsville; hard bedrock is not mapped at that depth. That points to possible slower drilling in weathered material, not a need to assume hard rock everywhere. A seasonal water table is mapped within 60 inches across 47 percent of the area, so pits may need pumping. Flood prone soils cover 7 percent, and high steel corrosion risk is mapped across 46 percent. The Eocene Reklaw Formation includes sandstone and clay, which can mean changing ground as a bore advances.
How do we drill through clay in Scottsville?
The mapped clay at 40 inches can make cuttings sticky, while seasonal water near Scottsville can affect pits. We match the fluid, reaming sequence, and pullback timing to those ground conditions.
- Kirvin soil and clay mapped at 40 inches can cling to the reamer, so we use a thinner fluid with polymer and open the hole in stages.
- With heavy clay mapped in Scottsville, we watch the returning drilling fluid near FM 2199 pavement and keep pressure controlled to avoid lifting the surface.
- Seasonal water is mapped within 60 inches across 47 percent of the area, so we keep pits compact and pump them if water collects near Harkins Lane.
- Before drilling near a marked line on Sugar Creek Drive, we pothole to verify its depth, then track the drill head and record depth and pitch.

Where might a Scottsville line go under Eightmile Creek?
FM 2199 has 1.6 mapped roadway miles inside Scottsville, and FM 1998 has 1.0. US 80 runs along or touches the city limits, while Interstate 20 is 1.4 miles away. Those state and federal routes can call for a planned bore rather than an open cut through pavement. Harkins Lane is the longest named street at 0.41 miles in the city, followed by Sugar Creek Drive at 0.37 and Town Oaks Drive at 0.35. Each route needs its own utility and access check.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| FM 2199 | State highway | 1.6 roadway miles inside | State highway office |
| FM 1998 | State highway | 1 roadway miles inside | State highway office |
| US 80 | Highway nearby | Runs along or touches the city limits | State highway office |
| Interstate 20 | Highway nearby | 1.4 miles outside | State highway office |
| Union Pacific | Railroad | 2.54 track miles inside | The railroad |
| Eightmile Creek | Stream nearby | 0.4 miles outside | Checked for Corps of Engineers jurisdiction |
| Hagerty Creek | Stream nearby | 0.6 miles outside | Checked for Corps of Engineers jurisdiction |
| Verhalen Lake | Lake or pond | 25 acres, nearby | Checked for Corps of Engineers jurisdiction |
| Scottsville Lake | Lake or pond | 14 acres, nearby | Checked for Corps of Engineers jurisdiction |
Union Pacific owns 2.54 track miles inside Scottsville on its Reisor Subdivision, and six mapped street and rail crossings make track access a practical planning issue. No named stream is mapped inside the city. Eightmile Creek is 0.4 miles outside the limits and Hagerty Creek is 0.6 miles away; no mapped street crosses a named stream inside the city. Verhalen Lake and Scottsville Lake are also outside the limits, within one mile.
Who approves a bore in Harrison County near Scottsville?
FM 2199 and FM 1998 run through Scottsville, while US 80 touches its limits and Interstate 20 is nearby. Work in those highway rights of way needs a TxDOT utility permit reviewed by the TxDOT Atlanta District; the utility owner files through RULIS, and we prepare the bore plan and profile for its application. TxDOT cover rules vary by line type, including 60 inches for electric and communication crossings and 60 inches for water crossings. City streets belong to the incorporated city. A Union Pacific crossing needs the railroad’s agreement, and a planned Eightmile Creek crossing is checked for Corps jurisdiction.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Whose lines may be in the ground in Harrison County near Scottsville?
The provider for a specific Scottsville address has to be confirmed with the city, county, or local water district before a bore is planned. EPA drinking water records for Texas do not tie systems to towns, and no system named Scottsville could be matched, so the address needs an individual check. Utilities reporting electric service in Harrison County include Southwestern Electric Power, Panola Harrison Electric Cooperative, and Upshur Rural Electric Cooperative. Before an electric conduit bore along FM 2199, we confirm which utility owns the line at that location.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| Southwestern Electric Power, Panola-Harrison Electric Cooperative and Upshur Rural Electric Cooperative | Electric utilities reporting service in Harrison County | EIA Form 861 | Confirm the line owner by address |
For underground work in Scottsville, we keep the housing context in view: American Community Survey 2019 to 2023 five year estimates put the median housing year at 1986. We keep Scottsville’s housing age mix in view for underground planning: estimates put 5 percent of homes before 1960, 57 percent from 1960 to 1999, and 38 percent in 2000 or later. Work along Harkins Lane could involve replacing an existing line or adding a new service; the address and scope decide which. We hydrovac pothole marked utilities on the planned path before drilling near them, since locate marks show position, not depth.

Do you cover Waskom and nearby Scottsville routes?
Scottsville is an incorporated city in Harrison County, covers 1.32 square miles, and sits at an elevation of 409 feet. The city’s ZIP code is 75672. Marshall, the county seat and nearest larger city, is 6.6 miles west; Waskom is 11.1 miles southeast. Nesbitt is 12.5 miles west, Uncertain is 12.7 miles northeast, and Jefferson is 16.7 miles northwest. From our Yukon, Oklahoma main office, Scottsville is 356 road miles away and a 7.2 hour drive. We take work across Texas, including rural routes beyond the city limits.
Places near Scottsville
- Directional boring in Marshall: 6.6 miles west
- Directional boring in Waskom: 11.1 miles southeast
- Nesbitt: 12.5 miles west
- Directional boring in Uncertain: 12.7 miles northeast
- Directional boring in Jefferson: 16.7 miles northwest
What would we bore near Harkins Lane in Scottsville?
- Highway crossing: A bore beneath FM 2199 can carry water or conduit without cutting the paved route, subject to the utility owner’s permit.
- Service line: A water or sewer connection along Harkins Lane can be bored from pits in the dirt rather than an open cut across a driveway.
- Fiber route: Electric conduit or fiber along Sugar Creek Drive can be installed below the surface while keeping the street pavement intact.
- Rail crossing: A utility route under the Union Pacific Reisor Subdivision needs the railroad’s agreement before the crossing details are set.
- Creek approach: A line near Eightmile Creek needs a planned route beneath the channel and a check for Corps jurisdiction.
- Drainage route: A bore near Hagerty Creek can be laid out to avoid cutting the drainage path and disturbing its banks.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
How do I get a quote for Scottsville work near Union Pacific?
For a Scottsville quote, send the address or map pin, what will go underground, the pipe or conduit size, the footage, and any sketch or plans. A route beside FM 2199 or the Union Pacific track helps us assess access and crossings before setting the work scope.
The route and ground set the estimate for a Scottsville bore. Kirvin soil and clay at 40 inches can affect reaming and fluid control; a Union Pacific crossing or work near FM 2199 adds crossing and permit planning. The number of utilities to expose, pavement or concrete, creek or drainage crossings, pits, excavator time, and sand backfill also matter. Mobilization reflects the 356 road miles from Yukon, while emergency timing or a high profile route can change the crew plan.
Questions people ask about boring in Scottsville
Does Trinity take directional boring jobs in Scottsville and Harrison County?
Yes. We take Texas work in Scottsville and Harrison County, with crews of our own and partner drilling contractors we have vetted working from satellite yards. You work with Trinity from the first call through the bore log, whether the route is near FM 2199 or elsewhere in the county.
What ground should I expect for a Scottsville bore through Kirvin soil?
Kirvin soil is the most common mapped series in Scottsville at 27 percent. The USDA soil survey maps clay across 50 percent of the area at about 40 inches below the surface. That clay can make cuttings sticky and grip pipe, so the bore plan should account for staged reaming and a timely pullback.
Is there rock in Scottsville, and how shallow is the mapped bedrock?
Weathered bedrock is mapped within 60 inches across 27 percent of Scottsville, while hard bedrock is not mapped within that depth. A bore may still encounter slower weathered material, including ground associated with the Eocene Reklaw Formation. Mapping describes expected patterns, not the exact conditions at a Harkins Lane address.
Who approves a bore beneath FM 2199 in Scottsville?
For work in the FM 2199 right of way, TxDOT reviews the utility permit through its Atlanta District. The utility owner submits the application in RULIS, using the bore plan and profile we prepare. The permit can set project specific conditions for the crossing and required cover.
What does a bore under Union Pacific in Scottsville require?
A crossing of the Union Pacific track in Scottsville needs an agreement from the railroad that owns it. The railroad sets crossing conditions such as casing, depth, and flagging. There are 2.54 track miles inside the city, so the proposed route and its relationship to the tracks need to be identified early.
Can a utility be bored beneath Eightmile Creek near Scottsville?
A bore can be planned beneath Eightmile Creek, which is 0.4 miles outside Scottsville’s limits. At a Scottsville crossing, we check during planning whether the US Army Corps of Engineers has jurisdiction. The channel route and nearby drainage conditions shape the bore profile, and the plan should avoid disturbing the creek banks.
Does Trinity serve rural sites near Scottsville, Marshall, and Waskom?
Yes. We take work around Scottsville, including rural routes outside the city limits, as well as nearby places such as Marshall and Waskom. Marshall is 6.6 miles west of Scottsville and Waskom is 11.1 miles southeast, so send the route location when asking about access and mobilization.
How early should I call Texas811 for a Scottsville bore on Harkins Lane?
For a Harkins Lane excavation, make the Texas811 request at least 48 hours ahead, excluding Saturdays, Sundays, and legal holidays, and no earlier than 14 days before work. For a Scottsville start, we make a new request if work moves more than 14 days past the original notice. Before work continues in Scottsville, we have worn or moved marks refreshed through Texas811.
What affects the cost of a directional bore in Scottsville near FM 2199?
The job scope drives the price, not a single footage measure. For a Scottsville route, clay at depth, pavement near FM 2199, utilities to expose, and any creek or drainage crossing can add work. Pipe size, pits, excavator time, backfill, and mobilization from Yukon also affect the estimate.
Where the Scottsville facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Scottsville
- U.S. Census Bureau, TIGER/Line 2024: Scottsville boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Scottsville
- U.S. Census Bureau, American Community Survey 2019 to 2023: Scottsville housing units and year built
- Macrostrat geologic map compilation: map units under Scottsville
- U.S. Department of Transportation, North American Rail Network: track owners in Harrison County
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Harrison County
- U.S. Geological Survey, Elevation Point Query Service: Scottsville elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Scottsville
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Scottsville
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Scottsville, Texas
Type the address of your job in Scottsville. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Scottsville
Same county: Hallsville · Longview. All counties: Texas county list.
