trinityboringsolutions.com

Jefferson Texas Directional Boring: Latch Soil, US 59 And Big Cypress Creek

Quick Answer: Can you get a line under US 59, a CPKC track or Big Cypress Creek without cutting across it? Yes, Trinity Boring Solutions does directional boring, also called horizontal directional drilling (HDD), in Jefferson, Texas, for crossings like Walcott Street and its creeks. Jefferson is 336 road miles from our Yukon, Oklahoma main office, and US 59 is one local route to plan around. Latch soil is common, while sandy ground can let a bore hole cave behind the bit. We match the drilling plan to the ground and the crossing.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Jefferson bores at a glance

  • County seat of Marion County, Texas. Population 1,996 (Census Bureau 2024 estimate).
  • Road distance from our Yukon, Oklahoma main office: 336 miles, about 6.8 hours of driving.
  • Ground: Latch soil is mapped on 27 percent of the area, with sandy clay loam about 40 inches down.
  • Rock: bedrock is mapped within 60 inches on 10 percent of the area.
  • Highways inside the boundary: US 59, Texas State Highway 49, FM 134 and FM 881. State permit office: TxDOT Atlanta District.
  • Railroad track inside the boundary: CPKC (Kansas City Southern) and Union Pacific, with 24 mapped street and rail crossings.
  • Named streams inside the boundary: Big Cypress Creek and Black Cypress Bayou.
  • Public water: City of Jefferson, surface water bought from another system.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who can do directional boring under US 59 in Jefferson?

Trinity Boring Solutions takes directional boring work in Jefferson, Marion County, where the Census Bureau Vintage 2024 estimate puts the population at 1,996. Can you get water, sewer, gas, electric conduit or fiber under a street without cutting it? Yes, we can plan those lines beneath routes such as Walcott Street, with the crossing and existing utilities shaping the bore.

Our main office is in Yukon, Oklahoma, and Jefferson work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our strike record has held for over 25 years, which matters around the City of Jefferson water lines and buried electric service. We are a family business started in 1965, and directional boring has been part of our work since 1982.

Trinity Boring Solutions Vermeer D24x40 directional drill set up for a bore
Our Vermeer D24x40 directional drill set up for a bore. Photos on this page are from our jobs in Oklahoma and Texas.

What is Jefferson ground like to bore through Latch soil?

The USDA soil survey maps Latch soil across 27 percent of Jefferson, with Kullit and Bowie also common. At about 40 inches below the surface, sandy clay loam is mapped under 28 percent of the area, loamy fine sand under 27 percent, and clay under 20 percent. The survey maps sandy ground across 33 percent at that depth, with average clay content of 24 percent. These are mapped patterns, not test borings, so the actual route still needs a site specific plan.

USDA soil survey, inside the Jefferson city limitsWhat is mapped
Soil series mappedLatch 27 percent, Kullit 13 percent, Bowie 11 percent, Cuthbert 10 percent and Mooreville 7 percent
Texture at the surfaceloamy fine sand 31 percent, fine sandy loam 30 percent and very fine sandy loam 17 percent
Texture about 40 inches downsandy clay loam 28 percent, loamy fine sand 27 percent and clay 20 percent
Engineering class about 40 inches downlean clay (CL) 40 percent, silty clayey sand (SC SM) 31 percent and silt (ML) 10 percent
Average clay content about 40 inches down24 percent
Bedrock mapped within 60 inches10 percent of the area (0 percent hard rock, 10 percent weathered rock)
Seasonal water table within 60 inches75 percent of the area
Flood prone soils12 percent of the area
High corrosion risk for uncoated steel57 percent of the area

The USDA soil survey maps weathered bedrock within 60 inches across 10 percent of Jefferson; hard bedrock is not mapped at that depth. Seasonal water tables reach within 60 inches across 75 percent, and flood prone soils cover 12 percent, so pits near Big Cypress Creek may need pumping and careful placement. High steel corrosion risk is mapped across 57 percent. The Reklaw Formation, an Eocene unit of sandstone and claystone, can mean slower drilling where weathered sandstone is encountered.

How do we drill Jefferson sandy clay loam?

For Jefferson’s sandy clay loam and Latch soil, we plan the bore to keep the hole stable without forcing fluid into the ground. Walcott Street or Big Cypress Creek crossings also need a route that fits the surface and subsurface conditions.

  1. Latch soil and clay can cling to the reamer, so we use a thinner drilling fluid, work through staged reaming and prepare to pull the line promptly.
  2. Where Jefferson’s mapped loamy fine sand occurs, we build a stabilizing fluid wall and have the pipe ready before the final reaming pass.
  3. Seasonal water tables mapped within 60 inches across 75 percent of the city can fill pits, so we plan compact pits and pumping where needed.
  4. At Big Cypress Creek, we plan depth beneath the channel and track the drill head from the surface, recording depth and pitch as it advances.
Bobcat E35 mini excavator lowering a 6 inch PVC sleeve into a bore pit in sandy soil at NE 24th Street in northeast Oklahoma City
Lowering a 6 inch PVC sleeve into a bore pit in sandy soil at NE 24th Street in Oklahoma City.

Which roads, tracks or creeks does a Jefferson bore cross near Walcott Street?

Jefferson includes US 59, Texas State Highway 49, FM 134 and FM 881, so the route determines whether a bore must pass under highway pavement or stay within a street corridor. Walcott Street is the longest named street at 2.05 miles in the city, followed by Line Street at 1.36 miles and Cass Street at 1.23 miles. Polk Street adds another 1.19 miles of mapped street. A bore can leave pavement intact, with pits placed in dirt on either side of the crossing.

CrossingTypeMapped extentWho has a say
US 59US highway2.2 roadway miles insideState highway office
Texas State Highway 49State highway2.4 roadway miles insideState highway office
FM 134State highway1.3 roadway miles insideState highway office
FM 881State highway0.4 roadway miles insideState highway office
CPKC (Kansas City Southern)Railroad3.75 track miles insideThe railroad
Union PacificRailroad3.71 track miles insideThe railroad
Big Cypress CreekStream4.12 channel miles insideChecked for Corps of Engineers jurisdiction
Black Cypress BayouStream0.81 channel miles insideChecked for Corps of Engineers jurisdiction
Scotts BayouStream nearby0.9 miles outsideChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

CPKC (Kansas City Southern) has 3.75 track miles in Jefferson, and Union Pacific has 3.71; the city map shows 24 street and rail crossings. Both rail owners have track in the city, so a proposed crossing needs the agreement of the owner of that track. Big Cypress Creek runs 4.12 channel miles through Jefferson, and Black Cypress Bayou runs 0.81 miles. Eight mapped street crossings cross named streams, which may bring creek conditions into the route plan.

Who has to sign off on a Jefferson bore in Marion County?

For a Jefferson bore along US 59, Texas State Highway 49, FM 134 or FM 881, the line owner files the TxDOT utility permit through RULIS, not the drilling contractor. We give the owner a bore plan and profile, and the TxDOT Atlanta District reviews the application. Highway cover depends on the line: electric and communication crossings need 60 inches below the lowest crossed grade, water crossings need 60 inches, and pressurized sewer crossings need 60 inches. A permit can set a different depth. City streets such as Walcott Street belong to the incorporated city. A crossing of CPKC or Union Pacific track needs that railroad owner’s agreement. Big Cypress Creek crossings are checked for U.S. Army Corps of Engineers jurisdiction during planning.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

What is already in the ground near the City of Jefferson water system?

The City of Jefferson public water system uses purchased surface water and reports 1,325 service connections serving 1,883 people. That network is a key reference when planning a replacement or a new service near Line Street. Southwestern Electric Power and Upshur Rural Electric Cooperative report electric service in Marion County; we confirm the line owner for the specific location before planning an electric conduit bore, rather than assuming one provider serves every address.

Line ownerWhat it isSourceSize
City of JeffersonPublic water systemSurface water bought from another system1,325 connections, 1,883 people served
Southwestern Electric Power and Upshur Rural Electric CooperativeElectric utilities reporting service in Marion CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

The American Community Survey 2019 to 2023 estimates put Jefferson’s median housing year at 1978, with 23 percent of homes built before 1960 and 4 percent built in 2000 or later. Older service lines may be replacement work, while newer construction may call for a fresh service route. Before drilling near any marked utility, we hydrovac pothole it because paint shows position, not depth. For a route under Line Street, that means exposing marked lines along the actual bore path first.

Coiled black HDPE conduit fitted with a pulling grip staged on a lawn along a completed bore path
Coiled HDPE conduit fitted with a pulling grip, staged on a lawn along a finished bore path.

Where is Jefferson in relation to Marshall and our Yukon yard?

Jefferson is the Marion County seat in Northeast Texas, at an elevation of 221 feet and covering 4.45 square miles. Its ZIP code is 75657. Pine Harbor is 8.7 miles west, Nesbitt is 13.3 miles southwest, and Uncertain is 13.4 miles east. Marshall, the nearest larger city, is 15.5 miles south. From our Yukon, Oklahoma yard, Jefferson is 336 road miles and a 6.8 hour drive, a distance that affects crew mobilization and project planning.

Places near Jefferson

What kinds of bores come up in Jefferson near Big Cypress Creek?

  • Highway crossing: A bore beneath US 59 keeps the line below the road surface, with the utility owner’s TxDOT permit guiding the route.
  • Street replacement: A water or sewer line under Line Street can be installed without opening the pavement, after marked utilities are exposed.
  • Fiber conduit: A conduit route near Walcott Street can pass below the street while keeping the surface crossing intact.
  • Creek crossing: A line beneath Big Cypress Creek needs a planned route under the channel and a check for federal waterway jurisdiction.
  • Rail crossing: A proposed bore under CPKC (Kansas City Southern) track follows the railroad owner’s agreement for that crossing.
  • Water service: A new connection near the City of Jefferson system needs the route checked against existing lines before drilling begins.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

What should I send for a Jefferson quote near CPKC (Kansas City Southern)?

For a Jefferson quote, send the address or map pin, what will go in the ground, the pipe or conduit size and the footage; a sketch or plans help. A route under CPKC (Kansas City Southern) needs the track location identified, while a Big Cypress Creek crossing calls for details about the banks and approach. Those site details help us assess access and the bore path.

In Jefferson, the first price drivers are ground conditions and crossing complexity: Latch soil, sandy layers and seasonal water can change reaming, fluid control and pit work. The route matters too, especially under US 59, CPKC track or Big Cypress Creek, where permits or crossing conditions can add planning. Pipe size, bore length, marked utilities to expose, pavement, pit excavation, sand backfill and emergency timing also affect the scope. Mobilization is part of the job because Jefferson is 336 road miles from Yukon.

Questions people ask about boring in Jefferson

Does Trinity Boring Solutions take jobs in Jefferson and Marion County, and who staffs them?

Yes, we take directional boring jobs in Jefferson, Marion County. Our main office is in Yukon, and work is handled by our own crews or crews from satellite yards operated by partner drilling contractors we have vetted. You work with Trinity from the first call through the bore log, including for a route under US 59.

Do older Jefferson homes near Line Street need replacement bores?

They can. The American Community Survey 2019 to 2023 estimates put the median housing year at 1978, with 23 percent built before 1960. Older water or sewer services near Line Street may need replacement, but the route and existing utilities must be checked before choosing a bore path.

Can groundwater or flood prone soil affect pits near Jefferson’s Big Cypress Creek?

Yes, water can affect pit work: seasonal water tables are mapped within 60 inches across 75 percent of Jefferson, and flood prone soils cover 12 percent. Near Big Cypress Creek, we plan pit placement and pumping around site conditions and plan the bore below the channel. Creek crossings are checked for U.S. Army Corps of Engineers jurisdiction.

Does Jefferson Latch soil corrode steel, and what pipe can we use?

High steel corrosion risk is mapped across 57 percent of Jefferson, so the line owner should consider casing and tracer wire materials. The USDA soil survey maps Latch soil across 27 percent of the city. HDPE is not subject to the same soil corrosion concern, while the line owner selects any coatings for steel.

What ground might a Jefferson bore pass through in Latch soil?

The USDA soil survey maps Latch soil across 27 percent of Jefferson, with sandy clay loam mapped under 28 percent at about 40 inches deep. Loamy fine sand is mapped under 27 percent at that depth. These are mapped soil patterns, not test borings, so a route near Walcott Street still needs site specific planning.

Is rock likely on a Jefferson bore route?

Weathered bedrock is mapped within 60 inches across 10 percent of Jefferson, while hard bedrock is not mapped in that depth range. The Reklaw Formation includes sandstone and claystone, so some routes may drill more slowly if weathered sandstone appears. The map does not establish what a particular bore will encounter.

What bore sizes and lengths can Trinity handle near Jefferson’s Polk Street?

We handle lines from 3/4 inch service lines up to 48 inch casing, and bore lengths from 10 feet to 5,000 feet. For a route near Polk Street, the pipe size, footage, soil and crossings help determine the right setup. A sketch can show the route and pit locations.

How much notice does Texas811 need for a Jefferson bore near Walcott Street?

Paint near Walcott Street shows a utility’s position, not its depth. Texas law requires a locate request at least 48 hours before excavation starts, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before. If the start slips more than 14 days past the original notice, make a new request. Worn or moved marks need refreshing through Texas811 before work continues.

What affects the cost of a Jefferson directional bore under US 59?

The price depends on the job scope, not on one factor alone. Soil conditions, crossing count, pipe size and footage matter; US 59 pavement and utility exposure can add work. A creek or rail crossing, pit excavation, sand backfill and emergency timing also affect the plan. Mobilization matters because Jefferson is 336 road miles from Yukon.

Where the Jefferson facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Jefferson

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Jefferson, Texas

Type the address of your job in Jefferson. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Jefferson

All counties: Texas county list.