Reference Table

Texas Underground Utility Depth Chart: Minimum Cover by Utility and Authority

Minimum burial depth for gas, liquid pipelines, water, sewer, electric and communication lines in Texas, with the rule that sets each number and a link to read it. For engineers, utility coordinators, contractors and homeowners planning a dig or a bore.

Last verified: November 23, 2026  |  Sources: PHMSA, Railroad Commission of Texas, TCEQ, TDLR, TxDOT, Union Pacific, BNSF, Texas Legislature and 10 Texas cities  |  Compiled by: Trinity Boring Solutions, Yukon, Oklahoma

Key findings

Texas law defines excavation as using explosives or powered or mechanized equipment to disturb soil to a depth of 16 inches or more (Tex. Util. Code 251.002(5)). That is a legal definition, not a safe digging depth. Cover rules vary: federal rules generally specify 12 inches for a gas service line on private property, while Union Pacific specifies at least 15 feet for directional drilling under its checklist for wireline crossings carrying 750 volts or less.

  • Measured to the top: Cover is measured down to the top of the pipe, conduit, cable or casing from the reference the rule names. The tables also identify separate clearance, added depth and notice requirements.
  • Minimums are not locations: As built depths vary and grade changes after installation, so marked lines that a bore will cross get potholed to see their real depth.
  • Highway crossings: TxDOT sets 60 inches for water, electric, communication and pressurized sewer crossings, and requires 12 additional inches within 50 feet of waterways, ditches, channels, creeks or culverts.
  • Water lines: TCEQ requires at least 24 inches over public water lines and placement below the frost line. Houston’s 2026 manual specifies 96 inches for a 20 inch line in an open ditch section. Austin specifies 114 inches at a valve on a 48 inch main.
  • Sewer cover depends on the design: TCEQ’s 30 TAC 217.53 treats cover as a design input without giving a single minimum. City and right of way standards can add numeric requirements.

This chart covers Texas only. Confirm the applicable rule and any stricter requirements with the utility and right of way owner.

State and federal minimum cover by utility

Minimum cover set by federal pipeline rules adopted in Texas, TCEQ and the state electrical code. Unit: inches of cover, with feet shown. Source: eCFR 49 CFR Parts 192 and 195, Railroad Commission of Texas 16 TAC 8.1, TCEQ 30 TAC 290.44 and 217.53, TDLR 16 TAC 73.100 and the 2026 NEC. Read November 23, 2026; see edition dates in the rules, source list or notes.
UtilityWhereAuthorityCover (in)Cover (ft)RuleNotes
Gas transmission lineClass 1 location, normal soilPHMSA (adopted by Texas RRC)302.549 CFR 192.327(a)18 in where consolidated rock. Texas adopts Part 192 in 16 TAC 8.1(b).
Gas transmission lineClass 1 location, consolidated rockPHMSA (adopted by Texas RRC)181.549 CFR 192.327(a)Texas adopts Part 192 in 16 TAC 8.1(b).
Gas transmission lineClass 2, 3 and 4 locations, normal soilPHMSA (adopted by Texas RRC)36349 CFR 192.327(a)24 in where consolidated rock.
Gas transmission lineClass 2, 3 and 4 locations, consolidated rockPHMSA (adopted by Texas RRC)24249 CFR 192.327(a)
Gas transmission lineDrainage ditches of public roads and railroad crossings, normal soilPHMSA (adopted by Texas RRC)36349 CFR 192.327(a)24 in where consolidated rock.
Gas main (distribution)General minimumPHMSA (adopted by Texas RRC)24249 CFR 192.327(b)Exceptions for underground obstructions with added protection under (c), or qualifying state or municipal common trench laws under (d).
Gas pipe in a navigable river, stream or harborSoilPHMSA (adopted by Texas RRC)48449 CFR 192.327(e)24 in in consolidated rock.
Gas service linePrivate propertyPHMSA (adopted by Texas RRC)12149 CFR 192.361(a)If an underground structure prevents this depth, the service line must withstand anticipated external loads.
Gas service lineStreets and roadsPHMSA (adopted by Texas RRC)181.549 CFR 192.361(a)If an underground structure prevents this depth, the service line must withstand anticipated external loads.
Hazardous liquid or CO2 pipelineIndustrial, commercial and residential areas, normal excavationPHMSA (adopted by Texas RRC)36349 CFR 195.248(a)30 in in rock excavation. Texas adopts Part 195 in 16 TAC 8.1(b).
Hazardous liquid or CO2 pipelineIndustrial, commercial and residential areas, rock excavationPHMSA (adopted by Texas RRC)302.549 CFR 195.248(a)Rock excavation means blasting or equivalent.
Hazardous liquid or CO2 pipelineCrossing inland bodies of water at least 100 ft wide between high water marks, normal excavationPHMSA (adopted by Texas RRC)48449 CFR 195.248(a)18 in in rock excavation.
Hazardous liquid or CO2 pipelineDrainage ditches at public roads and railroadsPHMSA (adopted by Texas RRC)36349 CFR 195.248(a)36 in in rock excavation too.
Hazardous liquid or CO2 pipelineAny other area, normal excavationPHMSA (adopted by Texas RRC)302.549 CFR 195.248(a)18 in in rock excavation. Pipe must also be below the level of cultivation.
Public water lineAny locationTCEQ24230 TAC 290.44(a)(4)Top of the waterline must also be below the frost line.
Electrical, direct burial cableExample wiring configuration; location exceptions not shownTDLR (state electrical code)242NEC 300.7 (2026), adopted by 16 TAC 73.100Minnesota DLI checklist summary of the national code, not the full NEC table.
Electrical, rigid or intermediate metal conduitExample wiring configuration; location exceptions not shownTDLR (state electrical code)60.5NEC 300.7 (2026), adopted by 16 TAC 73.100Minnesota DLI checklist summary of the national code, not the full NEC table.
Electrical, nonmetallic raceway (PVC)Listed for direct burial without concrete encasement; location exceptions not shownTDLR (state electrical code)181.5NEC 300.7 (2026), adopted by 16 TAC 73.100Minnesota DLI checklist summary of the national code, not the full NEC table.
Electrical, residential branch circuit120 volt, maximum 20 amp overcurrent protection, GFCI protected at the source; location exceptions not shownTDLR (state electrical code)121NEC 300.7 (2026), adopted by 16 TAC 73.100Minnesota DLI checklist summary of the national code, not the full NEC table.
Sanitary sewer collection lineCollection system designTCEQNone set30 TAC 217.53(k)(2)(N)No fixed cover in this section. Depth of cover is an engineering report input for flexible pipe; city or right of way criteria may also apply.

The Railroad Commission adopts federal Parts 191, 192, 193 and 195 by reference in 16 TAC 8.1(b), as modified in Chapter 8, effective December 9, 2024. No separate Texas cover depth was found in Chapter 8 as in effect February 25, 2026. TDLR adopted the 2026 National Electrical Code as the state electrical code effective September 1, 2026; in that edition underground installations moved to section 300.7. The Texas State Board of Plumbing Examiners adopted the 2021 Uniform Plumbing Code and 2021 International Plumbing Code effective November 19, 2026, and cities may adopt them with amendments; private water and sewer service depths come from the code your city enforces and are not listed here. The National Electrical Safety Code is not freely readable and is left out.

TxDOT highway right of way depths

Cover, added depth and clearance in TxDOT right of way. Unit: inches, with feet shown. Source: Texas Administrative Code, 43 TAC 21.40 (TxDOT Utility Accommodation Rules), last amended effective October 12, 2022. Read November 23, 2026; see edition dates in the rules, source list or notes.
UtilityPlacementValue (in)Value (ft)RuleNotes
Low pressure gas pipelineCrossing, encased, below lowest point of crossed grade60543 TAC 21.40(b)(1)(A)(i)(I)Or half the pipe diameter, whichever is greater.
Low pressure gas pipelineCrossing, encased, outside the pavement structure48443 TAC 21.40(b)(1)(A)(i)(II)
Low pressure gas pipelineCrossing, encased, under ditches (original unsilted flowline)60543 TAC 21.40(b)(1)(A)(i)(II)
Low pressure gas pipelineCrossing, unencased, under lowest point of crossed grade60543 TAC 21.40(b)(1)(A)(ii)(I)Lesser depth only with a district approved reinforced concrete slab.
Low pressure gas pipelineCrossing, unencased, outside paved areas48443 TAC 21.40(b)(1)(A)(ii)(II)
Low pressure gas pipelineLongitudinal48443 TAC 21.40(b)(1)(B)
High pressure gas, petroleum or saltwater pipelineCrossing, encased, below lowest point of crossed grade60543 TAC 21.40(b)(2)(A)(i)(I)Or half the pipe diameter, whichever is greater. Encasement must be vented steel pipe.
High pressure gas, petroleum or saltwater pipelineCrossing, encased, outside the pavement structure48443 TAC 21.40(b)(2)(A)(i)(II)
High pressure gas, petroleum or saltwater pipelineCrossing, encased, under a ditch60543 TAC 21.40(b)(2)(A)(i)(II)
High pressure gas, petroleum or saltwater pipelineCrossing, unencased60543 TAC 21.40(b)(2)(A)(iii)Below the applicable lowest grade. Under the crossed grade, see the additional requirements in (b)(2)(D).
High pressure gas, petroleum or saltwater pipelineLongitudinal48443 TAC 21.40(b)(2)(B)
Water lineLongitudinal, from lowest point of grade36343 TAC 21.40(c)Crossings under paved highways must be encased.
Water lineCrossing, from lowest point of grade60543 TAC 21.40(c)
Nonpotable water control lineLongitudinal36343 TAC 21.40(d)Any pipe type.
Nonpotable water control lineCrossing, from lowest point of grade60543 TAC 21.40(d)Encased under paved highways.
Sanitary sewer, gravityAny placement302.543 TAC 21.40(e)Also not less than 18 in below any pavement structure. Paved crossings encased.
Sanitary sewer, pressurizedCrossing60543 TAC 21.40(e)
Sanitary sewer, pressurizedLongitudinal36343 TAC 21.40(e)
Electric lineLongitudinal, direct bury48443 TAC 21.40(f)Equal to or greater than 48 in.
Electric lineCrossing, below lowest point of crossed grade60543 TAC 21.40(f)Encased in HDPE or comparable material.
Communication lineCrossing, below lowest point of crossed grade60543 TAC 21.40(g)Encased for all crossings.
Communication lineLongitudinal48443 TAC 21.40(g)District may allow 42 in if site conditions warrant.
Any underground utilityAdded depth within 50 ft of waterways, ditches, channels, creeks or culverts12143 TAC 21.40(a)(4)(L)Added to the minimum for that utility.
Any new underground utilityClearance from an existing utility, vertical and horizontal12143 TAC 21.40(a)(7)District may require 24 in if the work would disturb the existing line.

For crossings that require encasement, 43 TAC 21.40(a)(1)(C) specifies the applicable extent and calls for the greatest applicable length. Figure 21.40(a)(2)(A) is not reproduced. TxDOT may approve lesser depth with other protection, such as encasement or a reinforced concrete slab, under (a)(2)(D). If used, a slab must be at least 6 inches thick, at least 5 feet wide or three times the pipe diameter wide, whichever is greater, and have at least 6 inches of cushion over the pipe.

0122436486072Electric4860Communication4860Low pressure gas4860High pressure gas4860Water3660Pressurized sewer3660Gravity sewer3030Longitudinal (in)Crossing (in)Minimum cover, inches

Chart: baseline TxDOT longitudinal and crossing values. Gas crossing bars show the encased baseline under the crossed grade; half the diameter can require more. Gravity sewer also needs at least 18 inches below any pavement structure. The bars do not include additional depth or district adjustments.

Railroad crossing and parallel depths

Minimum cover required by Union Pacific and BNSF for utilities on railroad right of way. Unit: inches of cover, with feet shown. Source: Union Pacific pipeline and wireline engineering specifications web pages; BNSF Utility Accommodation Policy, January 2026, and BNSF pipeline application form, Rev. 10/20/2025. Read November 23, 2026; see edition dates in the rules, source list or notes.
RailroadFacility or methodMeasuredCover (in)Cover (ft)RuleNotes
Union PacificFlammable pipeline casing, under trackBase of rail to top of casing544.5UP Pipeline Engineering Specs4.5 ft. Casing 45 ft or 2D + 20 ft each side of outside track centerline, whichever is greater.
Union PacificFlammable pipeline casing, rest of right of way and ditchesGround or ditch bottom to top of casing363UP Pipeline Engineering Specs3 ft.
Union PacificNonflammable pipeline casing, under trackBase of rail to top of casing544.5UP Pipeline Engineering Specs4.5 ft and below the frost line. Casing 30 ft or 2D + 20 ft each side of outside track centerline, whichever is greater.
Union PacificNonflammable pipeline casing, rest of right of way and ditchesGround or ditch bottom to top of casing363UP Pipeline Engineering Specs3 ft.
Union PacificWireline 750 volts or lessBelow base of rail544.5UP Wireline Engineering Specs4.5 ft. Steel or rigid metal casing 30 ft from nearest track centerline.
Union PacificFiber optic wirelineBelow base of rail605UP Wireline Engineering Specs5 ft.
Union PacificWireline 750 volts or lessBelow natural grade363UP Wireline Engineering Specs3.0 ft.
Union PacificFiber optic wirelineBelow natural grade605UP Wireline Engineering Specs5 ft.
Union PacificWireline over 750 voltsBelow base of rail to top of facility544.5UP Wireline Engineering Specs4.5 ft. Encased across the right of way.
Union PacificWireline over 750 voltsBelow natural grade to top of facility484UP Wireline Engineering Specs4.0 ft.
Union PacificHorizontal directional drilling, wireline crossings 750 volts or lessBurial depth18015UP Wireline Engineering Specs15 ft, conduit or casing 6 in or less, and UP interim HDD guidelines (May 27, 2005).
BNSFCrossing by jacking and dry boringBelow ditch flowline or ground726BNSF Utility Accommodation Policy, Part 3 C(f)6 ft.
BNSFCrossing by jacking and dry boringBelow base of rail998.25BNSF Utility Accommodation Policy, Part 3 C(f)8 ft 3 in.
BNSFCrossing by horizontal directional drillingBelow base of rail14412BNSF Utility Accommodation Policy, Part 3 C(g)12 ft, plus 6 ft below ditch flowline or ground.
BNSFAny crossing or parallel line, any methodBelow natural ground or ditches726BNSF Utility Accommodation Policy, Part 3 C(i)6 ft.
BNSFUncased gaseous pipeline, jack and boreBase of rail to top of pipe12010BNSF pipeline application form, Rev. 10/20/202510 ft.
BNSFParallel underground wirelineBelow natural grade726BNSF Utility Accommodation Policy, Part 2 C6 ft, in a single conduit.
BNSFParallel pipelineMinimum cover726BNSF Utility Accommodation Policy, Part 2 C6 ft. No closer than 25 ft to track centerline; steel encasement at 40 ft or less is subject to BNSF approval.

Each railroad sets and administers its own crossing requirements. Use the ground, ditch flowline or base of rail datum named in the applicable specification. BNSF calls for a minimum of 30 feet from track centerline for boring pits and placement outside railroad property where possible. Its crossing policy separately addresses bridges, switches and culverts. Short line railroads were not checked.

Water and sewer separation distances

Minimum separation between public water lines and wastewater facilities in Texas. Unit: inches of separation, with feet shown. Source: TCEQ, 30 TAC 290.44(e) and 30 TAC 217.53(d). Read November 23, 2026; see edition dates in the rules, source list or notes.
SituationDirectionDistance (in)Distance (ft)RuleNotes
New potable water distribution line from wastewater facilitiesAll directions, outside surface to outside surface108930 TAC 290.44(e)(1)Parallel mains or laterals use separate trenches under (e)(2). See (e)(4) when 9 ft cannot be achieved.
New potable water line parallel to existing wastewater main or lateral, where 9 ft cannot be achievedVertical, water line above24230 TAC 290.44(e)(4)(A)(i)Also 4 ft horizontally. A Texas PE must determine the existing line is not leaking for this clause.
New potable water line parallel to existing wastewater main or lateral, where 9 ft cannot be achievedHorizontal48430 TAC 290.44(e)(4)(A)(i)Also 2 ft vertically. A Texas PE must determine the existing line is not leaking for this clause.
New water line crossing above existing nonpressure rated wastewater lineVertical24230 TAC 290.44(e)(4)(B)(i)Water line joints at least 9 ft from the crossing centerline. See replacement requirements if the wastewater line is disturbed or shows leakage.
New water line crossing above existing pressure rated wastewater lineVertical60.530 TAC 290.44(e)(4)(B)(i)Water line joints at least 9 ft from the crossing centerline. See replacement requirements if the wastewater line is disturbed or shows leakage.
New water line crossing under a wastewater main or lateralVertical12130 TAC 290.44(e)(4)(B)(iii)Encased or ductile iron or steel with specified joints. For crossing under a main, also follow 30 TAC 217.53(d).
Potable water line from wastewater manhole or cleanoutSeparation108930 TAC 290.44(e)(5)If 9 ft cannot be achieved, see the specified encasement, including at least 18 ft of 150 psi pressure class pipe.
Fire hydrant from wastewater main, lateral or service lineVertical or horizontal108930 TAC 290.44(e)(6)Applies regardless of construction.
Water line from septic drainfieldSeparation1201030 TAC 290.44(e)(8)10 ft.
Wastewater collection pipe or manhole from water supply pipeAny direction, wherever possible108930 TAC 217.53(d)(3)9 ft. If not possible, the engineering report must justify it. Collection pipes go in separate trenches and below water pipes where possible.
Wastewater collection pipe running parallel to and below a water supply pipe within 9 ftVertical, wastewater below24230 TAC 217.53(d)(6)(A)This option requires qualifying 150 psi pipe, joints that seal at atmospheric pressure and 4 ft horizontal separation. Subparagraph (B) is a casing alternative.
Wastewater collection pipe running parallel to and below a water supply pipe within 9 ftHorizontal48430 TAC 217.53(d)(6)(A)This option requires qualifying 150 psi pipe, joints that seal at atmospheric pressure and 2 ft vertical separation. Subparagraph (B) is a casing alternative.
Wastewater pipe crossing below a water pipe, qualifying 150 psi pressure class pipeBetween outsides of pipes60.530 TAC 217.53(d)(7)(A)Corrosion resistant, nonbrittle pipe, centered on the crossing, at least 18 ft long and terminating at joints designed to seal at atmospheric pressure.
Wastewater pipe crossing below a water pipe, sand encasement option for other pipe materialBetween outsides of pipes24230 TAC 217.53(d)(7)(B)Cement stabilized sand backfill required. Subparagraph (C) gives a separate casing option.

Distances in this table are separation, not cover. Where reduced separation is allowed, the rules add pipe pressure class, joint spacing, encasement or cement stabilized sand requirements; read the cited paragraph before using a reduced distance.

City water and sewer cover standards

Cover for public mains and select sewer laterals in the cited local manuals. Unit: inches of cover, with feet shown. Source: design manuals of Dallas, Fort Worth, Houston, Austin, San Antonio Water System, Plano, Frisco, Denton, Arlington and El Paso Water. Read November 23, 2026; see edition dates in the rules, source list or notes.
CityUtilitySize or conditionCover (in)Cover (ft)MeasuredSectionEdition
DallasWater main12 in and smaller, unimproved area726Top of pipe to natural or finished groundTable 2.5.2October 2015
DallasWater main12 in and smaller, improved area484Top of pipe to natural or finished groundTable 2.5.2October 2015
DallasWater main16 in, unimproved area726Top of pipe to natural or finished groundTable 2.5.2October 2015
DallasWater main16 in, improved area605Top of pipe to natural or finished groundTable 2.5.2October 2015
DallasWater main20 in and larger, unimproved area847Top of pipe to natural or finished groundTable 2.5.2October 2015
DallasWater main20 in and larger, improved area726Top of pipe to natural or finished groundTable 2.5.2October 2015
DallasWater mainAll sizes, highway or railroad crossing726Top of pipe to natural or finished groundTable 2.5.2October 2015
DallasWastewater main12 in and smaller, unimproved area726Top of pipe to natural or finished groundTable 4.5.2October 2015
DallasWastewater main12 in and smaller, improved area484Top of pipe to natural or finished groundTable 4.5.2October 2015
DallasWastewater main16 in, unimproved area726Top of pipe to natural or finished groundTable 4.5.2October 2015
DallasWastewater main16 in, improved area605Top of pipe to natural or finished groundTable 4.5.2October 2015
DallasWastewater main20 in and larger, unimproved area847Top of pipe to natural or finished groundTable 4.5.2October 2015
DallasWastewater main20 in and larger, improved area726Top of pipe to natural or finished groundTable 4.5.2October 2015
DallasWastewater mainAll sizes, highway or railroad crossing726Top of pipe to natural or finished groundTable 4.5.2October 2015
Fort WorthWater main12 in and smaller484Top of surface, existing and future, to top of pipe5.6.4.1May 2019, effective June 1, 2019; current applicability not confirmed
Fort WorthWater main16 in and larger605Top of surface, existing and future, to top of pipe5.6.4.2May 2019, effective June 1, 2019; current applicability not confirmed
Fort WorthWastewater mainMinimum; shallower requires Water Department Director approval423.5Top of pipe to ground or future ground, whichever is greater6.5.2.1May 2019, effective June 1, 2019; current applicability not confirmed
Fort WorthWastewater mainStandard depth of cover, not minimum726Top of pipe to ground6.5.2.1May 2019, effective June 1, 2019; current applicability not confirmed
HoustonWater line16 in and smaller, curb and gutter street605Top of curbTable 7.2 (7.2.01.C.6)2026 IDM, effective March 2, 2026
HoustonWater line16 in and smaller, open ditch section726Mean of nearby ditch bottom and nearby right of way elevationsTable 7.2 (7.2.01.C.6)2026 IDM, effective March 2, 2026
HoustonWater line16 in and smaller, absolute minimum subject to soil and railway notes363Per Table 7.2Table 7.2 (7.2.01.C.6)2026 IDM, effective March 2, 2026
HoustonWater line20 in, curb and gutter street726Top of curbTable 7.2 (7.2.01.C.6)2026 IDM, effective March 2, 2026
HoustonWater line20 in, open ditch section968Mean of nearby ditch bottom and nearby right of way elevationsTable 7.2 (7.2.01.C.6)2026 IDM, effective March 2, 2026
HoustonWater line20 in, absolute minimum with cement stabilized embedment; soil and railway notes apply484Per Table 7.2Table 7.2 (7.2.01.C.6)2026 IDM, effective March 2, 2026
HoustonWater lineTable 7.2 railway crossing footnote726Per Table 7.2 note 2Table 7.2 note 22026 IDM, effective March 2, 2026
HoustonSanitary sewerNatural ground without side ditches363Surface of natural ground to top of pipe8.2.01.G.12026 IDM, effective March 2, 2026
HoustonSanitary sewerStreet right of way with curb and gutter pavement484Top of pipe to top of curb8.2.01.G.22026 IDM, effective March 2, 2026
HoustonSanitary sewerStreet right of way with crowned road and side ditches726Average ground line at the adjacent street right of way to top of pipe8.2.01.G.32026 IDM, effective March 2, 2026
AustinWater mainAll sizes484Uppermost projection of pipe to proposed groundUCM 2.9.2.B.4Municode, latest rule 9/15/2025
AustinWater main24 in, at a valve786.5Top of main to proposed finished gradeUCM 2.9.2.C.12Municode, latest rule 9/15/2025
AustinWater main36 in, at a valve968Top of main to proposed finished gradeUCM 2.9.2.C.12Municode, latest rule 9/15/2025
AustinWater main48 in, at a valve1149.5Top of main to proposed finished gradeUCM 2.9.2.C.12Municode, latest rule 9/15/2025
AustinWastewater mainNatural ground in easements or undeveloped areas423.5Uppermost projection of main to groundUCM 2.9.4.C.5.aMunicode, latest rule 9/15/2025
AustinWastewater mainExisting or proposed streets, roads or traffic areas665.5Uppermost projection of main to proposed groundUCM 2.9.4.C.5.bMunicode, latest rule 9/15/2025
San Antonio (SAWS)Wastewater mainGeneral; see concrete encasement rule for less cover or applicable floodplain placement363Top of pipe to ground surfaceUSR 13.3, item 4May 23, 2024
San Antonio (SAWS)Wastewater mainStreet right of way with curb and gutter484Top of pipe to top of curbUSR 13.3, item 5May 23, 2024
San Antonio (SAWS)Wastewater mainStreet right of way with crowned road and side ditches605Average ground line of the right of way to top of pipeUSR 13.3, item 6May 23, 2024
San Antonio (SAWS)Wastewater lateralAt the property line; exceptions subject to SAWS Director approval605Below finished gradeUSR 13.1, item 5May 23, 2024
PlanoWastewater mainAll sizes484Ground, or bottom of pavement section under pavement3.3.B.4June 2021
FriscoWater main4 in to 12 in484Not stated in the section5.01.2.BOctober 2025
FriscoWater main14 in to 18 in605Not stated in the section5.01.2.COctober 2025
FriscoWater mainLarger than 20 in726Not stated in the section5.01.2.DOctober 2025
FriscoWastewater mainAll sizes484Not stated in the section5.02.2.COctober 2025
DentonWater main12 in and smaller, unpaved area605Surface to top of pipe6.2.3, minimum cover tableEffective March 1, 2026
DentonWater main12 in and smaller, under proposed or existing pavement423.5Surface to top of pipe6.2.3, minimum cover tableEffective March 1, 2026
DentonWater main16 in, under proposed or existing pavement605Surface to top of pipe6.2.3, minimum cover tableEffective March 1, 2026
DentonWater main16 in and larger, unpaved area726Surface to top of pipe6.2.3, minimum cover tableEffective March 1, 2026
DentonWater main20 in and larger, under proposed or existing pavement726Surface to top of pipe6.2.3, minimum cover tableEffective March 1, 2026
DentonSewer mainMinimum423.5Not stated in the section6.3.4Effective March 1, 2026
DentonSewer lateralShallowest point242Not stated in the section6.3.4Effective March 1, 2026
ArlingtonWater mainAll sizes423.5Top of pipe to existing ground or proposed finished grade, whichever is lower3.1.3.B.1Design Criteria Manual dated April 1, 2020
ArlingtonSanitary sewer mainAll sizes423.5Top of pipe to existing ground or proposed finished grade, whichever is lower3.2.3.B.2Design Criteria Manual dated April 1, 2020
El PasoWater main6 in and 8 in, standard installation, street, drainage or relocation projects484Top of pipe to finished grade12.6, standard cover tableSecond Edition, March 1, 2016
El PasoWater main12 in and larger, standard installation, street, drainage or relocation projects605Top of pipe to finished grade12.6, standard cover tableSecond Edition, March 1, 2016
El PasoWater main6 in and 8 in, new subdivisions or nonpaved areas726Top of pipe to proposed finished grade12.6, standard cover tableSecond Edition, March 1, 2016
El PasoWater main12 in and larger, new subdivisions or nonpaved areas847Top of pipe to proposed finished grade12.6, standard cover tableSecond Edition, March 1, 2016
El PasoWastewater mainGeneral726Top of pipe to finished grade15.3.5Second Edition, March 1, 2016

The rows describe the cited edition; confirm which edition governs your project. Dallas calls for special engineering evaluation and controls for cover under 3 feet; its highway and railroad crossings must also meet all additional requirements. Houston adds 2 feet over the Table 7.2 absolute minimum in predominantly high plasticity clay. Houston sanitary sewer cover exceptions require Class 150 pressure pipe and cement stabilized sand backfill. Frisco’s text does not give a value for exactly 20 inches. Fort Worth values are from the city’s May 2019 edition; current applicability could not be confirmed.

Texas811 rules and the 16 inch question

Texas Utilities Code Chapter 251 defines excavate as using explosives or a motor, engine, hydraulic or pneumatically powered tool, or other mechanized equipment of any kind “to remove or otherwise disturb soil to a depth of 16 or more inches.” Chapter 251’s notice duty has exceptions, including those in Sections 251.155 and 251.156; Saturday notice has separate timing under 251.151(b) and 251.157(a). The Railroad Commission’s separate pipeline damage rule exempts movement of earth 16 inches deep or less and expressly addresses tillage exceeding 16 inches. Texas811 recommends contacting it at least two working days before digging and says to call even for hand digging.

Texas811 notice, ticket and tolerance numbers. Unit as shown in each row. Source: Texas Utilities Code Chapter 251 and Railroad Commission of Texas 16 TAC Chapter 18. Read November 23, 2026.
ItemRuleValueUnitCite
Depth that makes digging an excavation under the statute16 or more inches with mechanized equipment or explosives16inTex. Util. Code 251.002(5)
Earliest notice before digging14th day before excavation begins14daysTex. Util. Code 251.151(a)
Latest notice before digging48th hour before excavation begins, not counting Saturdays, Sundays and legal holidays48hoursTex. Util. Code 251.151(a)
Operator marking deadline, ordinary noticeClass A operator if marking is necessary; after notice, excluding Saturdays, Sundays and legal holidays48hoursTex. Util. Code 251.157(a)(1)
Routine railroad maintenance notice exceptionWithin 15 ft of either side of track midline, ground not disturbed deeper than this18inTex. Util. Code 251.156(a)(3)
Routine county road maintenance notice exceptionCounty employee on county road right of way, depth not more than24inTex. Util. Code 251.156(a)(7)
Pipeline damage rules do not applyMovement of earth not deeper than16in16 TAC 18.1(d)(2)
Life of a line locate ticketWorking days; a longer term requires a written agreement signed and dated by the excavator and operator under 18.3(f)14days16 TAC 18.1(g) and (h)
Pipeline tolerance zoneHalf the nominal pipe diameter plus at least this much each side of the outside edge18in16 TAC 18.2(21)

Inside a pipeline tolerance zone, 16 TAC 18.10 requires reasonable care and lists methods to consider, including hand digging when practical, soft digging, vacuum excavation and pneumatic hand tools. Hand digging and noninvasive methods are not required for pavement removal. The notification center must advise callers that water, slurry and sewage facilities in the area may not receive notice (Tex. Util. Code 251.153(a)). Check those lines directly with their owner when needed.

Download the data. Free to use with a link back to this page. Every row in every table above, with its rule cite and source link.

Download CSV

Method and sources

Each number is tied to a rule, manual or railroad specification checked on November 23, 2026. The four electrical examples use the Minnesota Department of Labor and Industry’s inspection checklist as a public summary of the national 2026 NEC; they do not reproduce the full adopted table. The NFPA code cycle record corroborates the table layout and general values, but is not the final code text. Inches and feet are shown for distances; notice periods use their own units. The chart does not give a statewide frost depth.

Limits: these are minimums for new work and do not tell you where an existing line is. Utilities may be shallower after grading or deeper than the minimum. Local amendments, permits and owner standards can require more. Always confirm with the owner of the right of way and the line.

  1. eCFR. 49 CFR 192.327, Cover. https://www.ecfr.gov/current/title-49/subtitle-B/chapter-I/subchapter-D/part-192/subpart-G/section-192.327
  2. eCFR. 49 CFR 192.361, Service lines: Installation. https://www.ecfr.gov/current/title-49/subtitle-B/chapter-I/subchapter-D/part-192/subpart-H/section-192.361
  3. eCFR. 49 CFR 195.248, Cover over buried pipeline. https://www.ecfr.gov/current/title-49/subtitle-B/chapter-I/subchapter-D/part-195/subpart-D/section-195.248
  4. Railroad Commission of Texas. 16 TAC Chapter 8, rule text effective February 25, 2026. https://www.rrc.texas.gov/media/farb0a34/chapter-8-all-rule-text-and-figures-effective-feb25-2026.pdf
  5. TCEQ. 30 TAC 290.44, Water Distribution (Legal Information Institute). https://www.law.cornell.edu/regulations/texas/30-Tex-Admin-Code-SS-290-44
  6. TCEQ. 30 TAC 217.53, Pipe Design (Legal Information Institute). https://www.law.cornell.edu/regulations/texas/30-Tex-Admin-Code-SS-217-53
  7. TDLR. Commission adopts rules, 2026 National Electrical Code, effective September 1, 2026. https://www.tdlr.texas.gov/news/rulemaking/2026/09/01/commission-adopts-rules-12/
  8. Minnesota Department of Labor and Industry. 2026 NEC electrical inspection checklist. https://dli.mn.gov/sites/default/files/pdf/eli_inspection_checklist-2026NEC.pdf
  9. NFPA. 2026 NEC code cycle record, CMP 3 public comment responses; corroboration only, not adopted text. https://docinfofiles.nfpa.org/files/AboutTheCodes/70/70_A2025_NEC_P03_SD_PCResponses.pdf
  10. Texas Register, November 13, 2026, adopted rules, Texas State Board of Plumbing Examiners, 22 TAC 367.2. https://www.sos.texas.gov/texreg/archive/November132026/Adopted%20Rules/22.EXAMINING%20BOARDS.html
  11. TxDOT. 43 TAC 21.40, Underground Utilities (Legal Information Institute). https://www.law.cornell.edu/regulations/texas/43-Tex-Admin-Code-SS-21-40
  12. Union Pacific. Pipeline Engineering Specs. https://www.up.com/real_estate/utilities/pipeline/pipespecs/
  13. Union Pacific. Wireline Installation Engineering Specifications. https://www.up.com/real_estate/utilities/wireline/wirespecs/
  14. BNSF. Utility Accommodation Policy, January 2026. https://www.bnsf.com/bnsf-resources/pdf/about-bnsf/utility.pdf
  15. BNSF. Pipeline application form, Rev. 10/20/2025. https://www.bnsf.com/bnsf-resources/pdf/about-bnsf/pipeline.pdf
  16. Texas Legislature. Utilities Code Chapter 251. https://statutes.capitol.texas.gov/Docs/UT/htm/UT.251.htm
  17. Railroad Commission of Texas. 16 TAC 18.1, 18.2, 18.3 and 18.10 (Legal Information Institute). https://www.law.cornell.edu/regulations/texas/16-Tex-Admin-Code-SS-18-1, https://www.law.cornell.edu/regulations/texas/16-Tex-Admin-Code-SS-18-2, https://www.law.cornell.edu/regulations/texas/16-Tex-Admin-Code-SS-18-3, https://www.law.cornell.edu/regulations/texas/16-Tex-Admin-Code-SS-18-10
  18. Railroad Commission of Texas. Chapter 18 rule compilation as in effect February 12, 2018, with rule history notes. https://www.rrc.texas.gov/media/ap2ck4pb/chapter18-all-effective-feb12-2018.pdf
  19. Texas811. Excavator Guide. https://texas811.org/pdf/Texas811-Excavator-Guide-2023.pdf
  20. Texas811. Frequently Asked Questions. https://texas811.org/faq/
  21. Dallas Water Utilities. Water and Wastewater Procedures and Design Manual, October 2015. https://dallascityhall.com/departments/waterutilities/DCH%20Documents/pdf/Water_and_Wastewater_Procedures_and_Design_Manual_October_2015.pdf
  22. City of Fort Worth. Installation Policy and Design Criteria for Water, Wastewater and Reclaimed Water, May 2019 edition; current applicability not confirmed. https://www.fortworthtexas.gov/files/assets/public/v/2/government/documents/fw-water-installation-policy-design-criteria.pdf
  23. City of Houston. Infrastructure Design Manual, 2026 edition, effective March 2, 2026. https://www.houstonpermittingcenter.org/media/6371/download?inline. See the city’s effective date and design transition notice.
  24. City of Austin. Utilities Criteria Manual, Section 2.9 (Municode). https://library.municode.com/tx/austin/codes/utilities_criteria_manual?nodeId=S2WAREWAWACR_2.9.0DEREWAREWAWASY_2.9.2WASY
  25. San Antonio Water System. Utility Service Regulations, May 23, 2024. https://apps.saws.org/business_center/Developer/utilityserviceregs/docs/2024%20SAWS%20Utility%20Service%20Regulations.pdf
  26. City of Plano. Water and Wastewater Design Manual, June 2021. https://content.civicplus.com/api/assets/tx-plano/ef8c4c5f-0ad1-4b9a-ae70-3e3583a47e93?cache
  27. City of Frisco. Engineering Design Standards, October 2025. https://www.friscotexas.gov/DocumentCenter/View/39413/2025-Design-Standards-ONLY
  28. City of Denton. Design Criteria Manual, effective March 1, 2026. https://www.cityofdenton.com/DocumentCenter/View/8462/City-of-Denton-Design-Criteria-Manual
  29. City of Arlington. Design Criteria Manual. https://www.arlingtontx.gov/files/assets/city/v/2/public-works/documents/design-criteria-manual/arlington-design-criteria-manual.pdf
  30. El Paso Water. Design Standards Manual, Second Edition, March 1, 2016. https://www.epwater.org/ep-water/uploads/design_standards_manual.pdf

Cite this page

Free to quote or republish any table with credit and a link.

Trinity Boring Solutions. "Texas Underground Utility Depth Chart: Minimum Cover by Utility and Authority." Updated November 23, 2026. https://trinityboringsolutions.com/texas-underground-utility-depth-chart/

Questions this data answers

How deep can I dig before calling 811 in Texas?

Chapter 251 defines excavation as using explosives or powered or mechanized equipment to disturb soil to a depth of 16 inches or more. Its notice duty has exceptions. The Railroad Commission's separate pipeline damage rule exempts movement of earth 16 inches deep or less. Neither threshold tells you where a line is. Texas811 recommends calling before digging regardless of depth.

How deep are sewer lines buried in Texas?

TCEQ's collection system rule treats cover as a design input and does not specify a single minimum. The applicable city or right of way rules can add numeric requirements. Examples here include 36 inches for Houston public sewers in natural ground without side ditches and 84 inches for Dallas mains 20 inches and larger in unimproved areas. TxDOT sets 30 inches for gravity sewers with an additional pavement condition, and 60 inches for pressurized sewer crossings.

How deep are residential water lines buried in Texas?

TCEQ requires the top of a public water line to be below the frost line and at least 24 inches below ground surface. Local main standards often require more: Arlington specifies 42 inches under its cited manual, and Houston specifies 96 inches for a 20 inch main in an open ditch section. Private service lines on the customer side of the meter are not charted; check the locally enforced plumbing code.

How deep are gas lines buried in Texas?

The federal baseline is 12 inches for gas service lines on private property, 18 inches in streets and roads, and 24 inches for buried gas mains, with specified exceptions. Transmission lines in normal soil generally need 30 to 36 inches depending on class location. TxDOT crossing depths depend on pressure, location and encasement, and can exceed 60 inches.

Where is cover measured from?

Cover is the depth from the ground surface, or the reference the rule names, down to the top of the pipe, conduit, cable or casing. It is not measured to the bottom or the centerline. Some rules use top of curb, base of rail or the lowest point of the crossed grade instead of the ground at the line.

Can I trust the minimum depth to find a buried line?

No. These are design minimums for new work. As built depths vary, grade gets cut or filled after installation, and Texas811 notes that erosion and root growth can change the depth or location of buried lines. Every marked line that a bore or trench will cross should be exposed by hand or vacuum excavation to see its real depth.

Related: directional boring in Texas, directional boring standards and regulations, hydrovac daylighting, directional boring terms glossary and the data library.

Planning a bore in Texas?

The customer or general contractor obtains the permits and handles traffic control. Trinity Boring Solutions handles the 811 ticket, hydrovac potholing, the bore and pit restoration.

Trinity Boring Solutions, 9102 Northwest Expy, Yukon, OK 73099, (405) 409-7423

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 4,100 feet in a single shot, with longer runs bored in sections, 3/4 inch service line through 48 inch pipe, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.