Buchanan Dam Texas Directional Boring: Keese Soil, FM 261 And Long Branch

Quick Answer: Keese soil and FM 261 crossings shape how Trinity Boring Solutions does directional boring, also called horizontal directional drilling (HDD), in Buchanan Dam, Texas. The Yukon, Oklahoma main office is 402 road miles away, which affects mobilization for work along Lakeshore Drive. Keese soil is mapped across 11 percent of the area, while coarse sandy loam and gravelly ground can cave behind a drill. We plan for the ground and the marked utilities along each route.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Buchanan Dam bores at a glance

  • Unincorporated community in Llano County, Texas. Population 1,508 (2020 Census count).
  • Road distance from our Yukon, Oklahoma main office: 402 miles, about 8.4 hours of driving.
  • Ground: Keese soil is mapped on 11 percent of the area, with bedrock about 40 inches down.
  • Rock: bedrock is mapped within 60 inches on 34 percent of the area.
  • Highways inside the boundary: FM 261, Texas State Highway 29, Texas State Highway 261 and RM 1431. State permit office: TxDOT Austin District.
  • Railroad track inside the boundary: none mapped.
  • Named streams inside the boundary: Long Branch, Campground Creek, French John Creek and Redrock Creek.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who does directional boring along Lakeshore Drive in Buchanan Dam?

Keese soil is one ground condition Trinity Boring Solutions plans for on Buchanan Dam projects in Llano County. The Census Bureau counted 1,508 people here in the 2020 Census. We install water, sewer, gas, electric conduit and fiber along routes such as Lakeshore Drive, where the bore path and line type guide the plan.

Our main office is in Yukon, Oklahoma, and Buchanan Dam work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Since 1982, decades of directional boring have taught us to plan for changing ground, including the mapped Keese soil and bedrock around Buchanan Dam. Our family business began in 1965, and we stay involved from the first call through the bore log.

Horizontal directional drill rig set up on an open grass field with support trucks and a vacuum excavation truck
Our horizontal directional drill set up in an open field with the support trucks and the vacuum excavation truck. Photos on this page are from our jobs in Oklahoma and Texas.

How does Keese soil affect a drill in Buchanan Dam?

Keese soil is mapped across 11 percent of Buchanan Dam, and the USDA soil survey also identifies Keese Rock outcrop complex on 5 percent of the area. Coarse sandy loam is the most common listed surface texture, at 21 percent. At about 40 inches below the surface, bedrock is mapped across 24 percent, while very gravelly sandy clay loam is mapped on 7 percent. Sandy ground is mapped across 11 percent at that depth, and gravelly ground across 14 percent. We use the mapped Keese, Lou, Click and Voca soil patterns as planning context, not as test borings. Sandy and gravelly material can cut easily but cave behind the bit, so staged reaming and drilling fluid help hold the bore open.

USDA soil survey, inside the Buchanan Dam mapped community boundaryWhat is mapped
Soil series mappedKeese 11 percent, Lou 10 percent, Click 7 percent, Voca 4 percent and Bauman 3 percent
Texture at the surfacecoarse sandy loam 21 percent, very gravelly coarse sandy loam 7 percent and gravelly sandy loam 4 percent
Texture about 40 inches downbedrock 24 percent, very gravelly sandy clay loam 7 percent and extremely gravelly coarse sandy loam 4 percent
Engineering class about 40 inches downSP SC 10 percent and clean gravel (GP) 4 percent
Average clay content about 40 inches down21 percent
Bedrock mapped within 60 inches34 percent of the area (9 percent hard rock, 24 percent weathered rock)
Seasonal water table within 60 inches0 percent of the area
Flood prone soils0 percent of the area
High corrosion risk for uncoated steel4 percent of the area

The USDA soil survey maps bedrock within 60 inches across 34 percent of Buchanan Dam, including hard bedrock on 9 percent and weathered bedrock on 24 percent; typical depth is 31 inches. The map includes Town Mountain Granite, a Tonian unit, so a route may meet hard rock and need slower drilling with rock tooling. We treat seasonal water table and flood prone soils as unmapped when planning crossings at Long Branch. High steel corrosion risk covers 4 percent, so the line owner should consider casing and tracer wire materials; HDPE is unaffected by that soil concern.

What does it take to bore through Buchanan Dam bedrock?

In Buchanan Dam, the USDA soil survey maps bedrock within 60 inches across 34 percent of the area, so we plan for both soil and rock conditions. A route near Keese Rock outcrop complex may need a different drilling pace and tooling than sandy ground.

  1. We review the route against Buchanan Dam’s mapped bedrock and Keese Rock outcrop complex, then select tooling and a bore profile suited to the expected ground.
  2. Where sandy or gravelly material appears near Lakeshore Drive, we use drilling fluid and staged reaming to limit the chance that the hole caves behind the bit.
  3. Before drilling near marked utilities along FM 261, we hydrovac pothole each line on the bore path; surface marks show location, not depth.
  4. We track the drill head from the surface as it advances near Long Branch, checking depth and pitch and logging the bore path. A creek route also gets jurisdiction review.
Drilling fluid returns at the entry as the Vermeer D24x40 S3 drills a 385 foot sandstone rock bore in Guthrie, Oklahoma
Drilling fluid coming back to the entry pit as our Vermeer D24x40 drills a 385 foot bore in Guthrie, Oklahoma.

Which roads, tracks or creeks can a Buchanan Dam bore cross near FM 261?

A bore near FM 261 in Buchanan Dam may cross a state road or run beneath a busy local route, so the alignment matters. FM 261 and Texas State Highway 29 each have 8.5 mapped roadway miles inside the community; Texas State Highway 261 has 8.0, and RM 1431 has 6.5. Lakeshore Drive is the longest named street at 8.05 miles, followed by Long Mountain at 2.49 miles and Rolling Waters Lane at 2.09 miles. Boring can keep pavement and driveways uncut, with entry and exit pits placed off the paved route where feasible.

CrossingTypeMapped extentWho has a say
FM 261State highway8.5 roadway miles insideState highway office
Texas State Highway 29State highway8.5 roadway miles insideState highway office
Texas State Highway 261State highway8 roadway miles insideState highway office
RM 1431State highway6.5 roadway miles insideState highway office
Long BranchStream0.64 channel miles insideChecked for Corps of Engineers jurisdiction
Campground CreekStream0.52 channel miles insideChecked for Corps of Engineers jurisdiction
French John CreekStream0.48 channel miles insideChecked for Corps of Engineers jurisdiction
Redrock CreekStream0.35 channel miles insideChecked for Corps of Engineers jurisdiction
Colorado RiverStream0.02 channel miles insideChecked for Corps of Engineers jurisdiction
Spring CreekStream nearbyAlong the boundaryChecked for Corps of Engineers jurisdiction
South Coggins CreekStream nearbyAlong the boundaryChecked for Corps of Engineers jurisdiction
Tan Trough CreekStream nearby0.1 miles outsideChecked for Corps of Engineers jurisdiction
North Coggins CreekStream nearby0.1 miles outsideChecked for Corps of Engineers jurisdiction
Lake BuchananLake or pond8,029 acres, insideChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

No railroad is mapped inside Buchanan Dam or within one mile outside the mapped community boundary, and no street and rail crossings are mapped. Named streams do cross the area: Long Branch runs 0.64 channel miles, Campground Creek 0.52, French John Creek 0.48 and Redrock Creek 0.35. Public records map six street crossings of named streams. Lake Buchanan and Inks Lake are also inside the community, so a water crossing needs early route review.

Whose permission does a Buchanan Dam bore need in Llano County?

Buchanan Dam has no city government, so approvals depend on whether a route uses a county street, a state highway right of way or a water crossing. For FM 261 and the other state roads, the utility owner applies through TxDOT’s online RULIS system, and the TxDOT Austin District reviews it; we prepare the bore plan and profile for that filing. At state highway crossings, required cover depends on the line: electric and communication lines need 60 inches below the lowest point of the crossed grade, water lines 60 inches, and pressurized sewer lines 60 inches. The permit may set a different depth. Long Branch or a Lake Buchanan crossing is checked for U.S. Army Corps of Engineers jurisdiction during planning.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

What is already in the ground in Buchanan Dam, Llano County?

Because Buchanan Dam has no city government, confirm the water provider for each address with Llano County or the local water district before planning a bore. EPA drinking water records do not identify which system serves a specific address here. Central Texas Electric Cooperative, Hamilton County Electric Cooperative Association and Pedernales Electric Cooperative report service in Llano County; the line owner for a Buchanan Dam conduit route must be confirmed before its specifications are set.

Line ownerWhat it isSourceSize
Central Texas Electric Cooperative, Hamilton County Electric Cooperative Association and Pedernales Electric CooperativeElectric utilities reporting service in Llano CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

We use the American Community Survey 2019 to 2023 five year estimates, which place the median housing year at 1986, as context for bore planning in Buchanan Dam. We factor the survey’s Buchanan Dam housing estimates into route planning: 6 percent built before 1960, 67 percent from 1960 to 1999, and 27 percent in 2000 or later. A Lakeshore Drive project may involve replacing older lines or connecting newer construction. Before drilling near a marked water or electric line, we hydrovac pothole to expose it; paint shows position, not depth.

Exposed underground utility line in a hand dug potholing pit before a directional bore in Oklahoma
An existing utility line exposed in a pothole before a directional bore in Oklahoma.

What is near Buchanan Dam and Kingsland?

Buchanan Dam is an unincorporated census designated place in Llano County, covering 7.75 square miles at an elevation of 1,061 feet. We use ZIP codes 78609, 78607 and 78611 to confirm service details for Buchanan Dam projects in Llano County. Buchanan Lake Village is 3.3 miles north, Tow is 5.0 miles north, and Kingsland is 10.3 miles south. Burnet is 13.5 miles east, while Llano, the county seat, is 14.0 miles west. Kingsland is the nearest larger city. The Yukon yard is 402 road miles away, an 8.4 hour drive, which affects crew mobilization for a Buchanan Dam job.

Places near Buchanan Dam

What boring work comes up near Long Branch in Buchanan Dam?

  • Highway crossing: A bore beneath FM 261 follows a planned profile that accounts for the road right of way, required cover and TxDOT review.
  • Water service: A new service near Lakeshore Drive needs the address specific water provider confirmed before the line route and connection are planned.
  • Fiber conduit: A route along Roselea Drive can avoid open cuts, with marked utilities exposed before the drill approaches them.
  • Creek crossing: A Long Branch bore needs a route beneath the channel and a check for U.S. Army Corps of Engineers jurisdiction.
  • Lake crossing: Work near Lake Buchanan or Inks Lake needs crossing review before the bore route and access pits are set.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

What drives the price of boring near Roselea Drive in Buchanan Dam?

For a quote near Roselea Drive, start with where the bore begins and ends, such as a map pin along the street. Tell us what goes underground, such as a water line or fiber conduit, then its size and the footage. A sketch or plans help us see nearby roads, utilities and any creek crossing before we build the bore plan.

The drive from Yukon is 402 road miles, so mobilization is part of planning for Buchanan Dam work. Keese soil, gravelly ground and mapped Town Mountain Granite can change drilling time and tooling. A crossing under FM 261 brings TxDOT permit and cover requirements into the plan; a Long Branch or lake route needs water crossing review. The number of marked utilities, pavement, pits, excavator time, backfill, emergency timing and access also affect the job scope.

Questions people ask about boring in Buchanan Dam

Does Trinity take directional boring jobs in Llano County near Buchanan Dam, and who staffs them?

Yes. Trinity Boring Solutions takes Buchanan Dam work, with our own crews and vetted partner drilling contractors staffing projects from satellite yards. We handle each Buchanan Dam project with you from the first call through the bore log, whether the route follows FM 261 or Texas State Highway 29. That model supports routes along local roads such as Lakeshore Drive without implying a local office.

How much rock is mapped within five feet of the surface in Buchanan Dam?

The USDA soil survey maps bedrock within 60 inches across 34 percent of Buchanan Dam. It maps hard bedrock on 9 percent and weathered bedrock on 24 percent, with typical depth at 31 inches. Town Mountain Granite is mapped locally, so a bore may need rock tooling and extra time where the route meets hard rock.

Who approves a bore under FM 261 in Buchanan Dam?

The utility owner applies for a permit through TxDOT’s online RULIS system, and the TxDOT Austin District reviews work on FM 261. We prepare the bore plan and profile for the owner’s application, with the TxDOT Austin District as the state permit office. For an electric or communication line crossing, the stated cover is 60 inches below the lowest point of the crossed grade, unless the permit sets a different depth.

Can a line be bored under Long Branch in Buchanan Dam?

A bore can be planned beneath Long Branch, which runs 0.64 channel miles inside Buchanan Dam. The route needs to stay beneath the channel, and planning checks whether the crossing falls under U.S. Army Corps of Engineers jurisdiction. We also review access for the entry and exit pits so the creek bank and surface route can remain uncut.

Which electric company should I ask about conduit specs in Buchanan Dam, Llano County?

Central Texas Electric Cooperative, Hamilton County Electric Cooperative Association and Pedernales Electric Cooperative report electric service in Llano County, but that does not identify the line owner at every Buchanan Dam address. Confirm the owner for the specific route before setting conduit specifications. We expose marked lines before drilling near them, including along roads such as FM 261.

Does Buchanan Dam or Llano County control Rolling Waters Lane, and does it need to be cut?

Buchanan Dam has no city government, so county or state authorities handle streets and permits according to the road. A bore along Rolling Waters Lane can pass beneath the surface without an open cut through the street. The mapped community boundary is not a city limit, so the road’s authority should be confirmed for the specific route.

How early should I call Texas811 for a Buchanan Dam bore along Lakeshore Drive?

Request a Texas811 locate at least 48 hours before excavation begins, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before the start. If work along Lakeshore Drive slips more than 14 days past the original notice, make a new request. We have worn or moved marks refreshed through Texas811 before work continues along Lakeshore Drive.

Does the distance from Kingsland change a Buchanan Dam boring job from Yukon?

The Yukon, Oklahoma main office is 402 road miles from Buchanan Dam, an 8.4 hour drive. Kingsland is 10.3 miles south and is the nearest larger city, but it does not change the stated distance from Yukon. The long mobilization can affect job planning alongside ground, access and crossings such as FM 261.

What affects the cost of a directional bore near FM 261 in Buchanan Dam?

The price depends on the job scope, not one factor alone. The 402 road miles from Yukon affect mobilization; Keese soil, gravelly ground and mapped granite affect drilling. A route under FM 261 adds highway permit and cover planning. Line size and length, marked utilities, pavement, creek crossings, pits, excavator time, backfill and emergency timing also matter.

Where the Buchanan Dam facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Buchanan Dam

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Buchanan Dam, Texas

Type the address of your job in Buchanan Dam. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Buchanan Dam

Same county: Horseshoe Bay · Sunrise Beach Village. All counties: Texas county list.