Directional Boring Contractors in Kinney County, TX

Trinity Boring Solutions is a directional boring contractor serving Kinney County, Texas, installing water, sewer, gas, electric and fiber lines without an open trench in Brackettville and Spofford. From the Trinity main office in Yukon, Oklahoma it is about 566 road miles south to Brackettville, the county seat. Bores here most often pass under US 90 and US 277, the West Nueces River and Union Pacific track. Call (405) 409-7423 any time.

Free Bore Planner

Plan Your Bore in Kinney County, Texas

Type the address of your job in Kinney County. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

What Should You Know Before Boring in Kinney County?

Kinney County covers 1,361 square miles, has about 3,191 residents and sits in the TxDOT Laredo District.

County seatBrackettville
Population3,191 (2024 Census estimate), up 1.9% since 2020
Land area1,361 square miles
Largest cities and townsBrackettville (1,351) and Spofford (44)
TxDOT districtTxDOT Laredo District
811 centerTexas811 (call 811), two working days of notice
Electric utilitiesAEP Texas Central, Medina Electric Cooperative, Pedernales Electric Cooperative and Rio Grande Electric Cooperative
Interstate and US highwaysUS 90 and US 277
State Highways131
RiversWest Nueces River
Creeks and other streamsElm Creek, Pinto Creek, Sycamore Creek, Las Moras Creek, East Fork Sycamore Creek, Lindsey Creek, Mud Creek and Imperialist Creek
RailroadsUnion Pacific, about 51 main line miles
Average precipitation22.4 inches a year (1991 to 2020)
Road distance from Trinity main officeAbout 566 miles from Yukon, Oklahoma to Brackettville
Trinity insuranceGeneral liability of $1,000,000 per occurrence and $4,000,000 aggregate, plus $5,000,000 excess liability

Sources: Census Bureau (2024 population, 2025 building permits, TIGER/Line roads and water), EIA Form 861 (2025), NOAA 1991 to 2020 precipitation, federal rail network map, TxDOT districts, OpenStreetMap routing. Checked November 2026.

What Does a Bore Have to Cross in Kinney County?

A bore in Kinney County most often has to cross a highway such as US 90, US 277 or State Highway 131, a stream such as the West Nueces River, Elm Creek or Pinto Creek and Union Pacific track. State Highways 131 also run through the county. The Census map names 25 larger streams in Kinney County, led by Elm Creek, Pinto Creek, the West Nueces River, Sycamore Creek, Las Moras Creek and East Fork Sycamore Creek. The rest are Lindsey Creek, Mud Creek, Imperialist Creek, Cow Creek, Arenosa Creek, Perdido Creek, East Prong Chaparrosa Creek, Live Oak Creek, Tequesquite Creek, West Pinto Creek, Salado Creek, East Fork Elm Creek, Little Perdido Creek, Flat Rock Creek, West Fork Turkey Creek, East Pinto Creek, Stricklin Creek, Muela Creek and Maverick County Canal. The federal rail map shows about 51 miles of main line track in Kinney County, owned by Union Pacific.

Trinity Boring Solutions horizontal directional drill rig set up on an open grass field with support trucks and a vacuum excavation truck
A Trinity Boring Solutions drill rig, support trucks and vacuum excavation truck on a jobsite.

What Is the Ground Like for Directional Boring in Kinney County?

Caliche is the main thing to plan for in Kinney County: the federal soil survey maps a cemented caliche layer within five feet of the surface on about 24 percent of the county, under a surface that is most often very cobbly loam. Because caliche wears tooling fast, the bit and reamer for a bore in Kinney County are picked before the rig leaves the yard. September is the wettest month in Kinney County at 3.1 inches on average and February the driest at 0.9. Kinney County averages 22.4 inches of precipitation a year, so the ground is usually dry at bore depth.

  • Most common soils: Olmos (21%), Uvalde (20%) and Ector (10%).
  • Surface texture: most often very cobbly loam (21%) or silty clay loam (19%).
  • Bedrock within 5 feet: about 38% of the county. Most of it is hard rock. Rock outcrop is mapped on about 11%.
  • Caliche within 5 feet: about 24% of the county.
  • Clay rich layer (35% clay or more) in the top 5 feet: about 37% of the county.
  • Gravelly, cobbly or stony surface soil: about 50% of the county.

Source: USDA Natural Resources Conservation Service, Soil Survey Geographic Database, Kinney County, Texas (survey area TX271, version 23, September 10, 2026), through Web Soil Survey. Percentages are shares of mapped county area.

Who Permits a Bore in Kinney County?

The TxDOT Laredo District permits bores under state highways in Kinney County, the Kinney County Commissioners Court handles county roads, and Brackettville and Spofford each handle their own streets.

  • State highways. US 90, US 277, the other numbered state routes and the farm to market roads in Kinney County are on the state system. The utility owner files a TxDOT utility permit in RULIS.
  • Texas811 locates. Texas811 needs at least two working days of notice before digging (Texas811 FAQ; Texas Utilities Code, Section 251.151).
  • Railroads. A bore under Union Pacific track in Kinney County needs a crossing agreement from the railroad that owns it, which sets the casing, depth and flagging.
  • Water crossings. A bore under the West Nueces River or Elm Creek is checked for U.S. Army Corps of Engineers jurisdiction while the path is planned.

Statewide rules are on the Directional Boring Texas page, and Trinity supplies the bore plan and profile for the permit package.

Which Electric Utilities Serve Kinney County?

AEP Texas Central, Medina Electric Cooperative, Pedernales Electric Cooperative and Rio Grande Electric Cooperative serve Kinney County, according to 2025 filings with the U.S. Energy Information Administration. AEP Texas Central is an investor owned utility; Medina Electric Cooperative, Pedernales Electric Cooperative and Rio Grande Electric Cooperative are member owned cooperatives. Conduit bored in Kinney County is built to the standard of whichever of them owns the line. More on electric line boring for electric cooperatives.

Is Kinney County Growing?

The population of Kinney County went from 3,131 in 2020 to 3,191 in 2024, a gain of 1.9 percent. In Kinney County that means steady work on service lines, rural extensions and road crossings.

Which Cities and Towns in Kinney County Does Trinity Serve?

Trinity takes directional boring work in all 2 incorporated places in Kinney County and at sites outside city limits, and Brackettville is the largest with about 1,351 residents.

City or town2024 population
Brackettville1,351
Spofford44

Source: U.S. Census Bureau 2024 estimates, counting only the part of each city inside Kinney County.

Kinney County borders Edwards County, Maverick County, Uvalde County, Val Verde County and Zavala County; every county is on the Directional Boring in All 254 Texas Counties page. The neighboring county seats are Rocksprings (Edwards), Eagle Pass (Maverick), Uvalde (Uvalde), Del Rio (Val Verde) and Crystal City (Zavala).

Which Directional Boring Services Are Available in Kinney County?

Every Trinity service is available in Kinney County: horizontal directional drilling from 3/4 inch service lines to 48 inch casing, auger boring, hydrovac potholing, trenching and 24 hour emergency response, all listed under Underground Utility and Boring Services.

The free Bore Planner sizes a Kinney County job before you call.

Kinney County Directional Boring FAQs: What Do Customers Ask?

Does Trinity Boring Solutions work in Brackettville, Texas?

Yes. Trinity Boring Solutions takes work in Brackettville and Spofford and the rural parts of Kinney County. Trinity works in Texas with its own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted.

Who approves a bore under US 90 in Kinney County?

The TxDOT Laredo District. The utility owner files the permit in the TxDOT RULIS system. County roads go through the Kinney County Commissioners Court and city streets through the city.

Is there rock in Kinney County?

Yes, in places. The federal soil survey records bedrock within five feet of the surface on about 38 percent of Kinney County, most of it hard rock. Caliche shows up within five feet on about 24 percent. Potholing confirms it on the actual bore path.

Can a line be bored under the West Nueces River in Kinney County?

Yes. A drill is steered below the bed of the West Nueces River from a pit on each bank and the pipe is pulled back through, so the channel is not opened. Federal jurisdiction over the crossing is checked first.

Which railroads have track in Kinney County?

Union Pacific, with about 51 miles of main line track on the federal rail map. Each requires its own crossing agreement before a bore goes under the rails.

Is Trinity insured for work in Kinney County?

Yes. Trinity Boring Solutions carries general liability of $1,000,000 per occurrence and $4,000,000 aggregate, plus $5,000,000 excess liability. Ask for a certificate with the quote.

How much does directional boring cost in Kinney County?

Trinity works from a general range based on length and pipe size. Depth, the crossings and the ground set the number, and caliche is a factor on many Kinney County jobs.

How Do You Get a Bore Quote in Kinney County?

Call (405) 409-7423 any time or send the address in Kinney County, the utility, the length and what it crosses. Trinity has bored since 1965 and is family owned.