Mexia Texas Directional Boring: Normangee Clay, US 84 and Salt Creek
Quick Answer: Trinity Boring Solutions handles directional boring, also called horizontal directional drilling (HDD), for crossings beneath US 84 and Mexia streets. Milam Street and Main Street are among Mexia’s longest routes, and our Yukon office is 304 road miles away. Normangee soil and clay dominate the mapped ground near 40 inches, so sticky cuttings and swelling clay call for staged reaming and controlled fluid. Salt Creek and Union Pacific tracks add crossing constraints, while boring keeps the surface intact.
Mexia bores at a glance
- Incorporated city in Limestone County, Texas. Population 6,916 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 304 miles, about 6 hours of driving.
- Ground: Normangee soil is mapped on 26 percent of the area, with clay about 40 inches down.
- Rock: bedrock is mapped within 60 inches on 54 percent of the area.
- Highways inside the boundary: US 84, Texas State Highway 14, FM 39, Texas State Highway 171 and FM 1365. State permit office: TxDOT Waco District.
- Railroad track inside the boundary: Union Pacific, with 8 mapped street and rail crossings.
- Named streams inside the boundary: Salt Creek, Elm Creek and Plummers Creek.
- Public water: City of Mexia, groundwater bought from another system.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Which contractor handles directional boring on Milam Street in Mexia?
We take directional boring work in Mexia, Limestone County, including water, sewer, gas, electric conduit and fiber routes beneath local streets such as Milam Street. Main Street, Milam Street and Palestine Street are among the city’s 144 named streets across 89.22 public road miles, with Union Pacific track and Salt Creek also running through Mexia. The Census Bureau Vintage 2024 estimate is 6,916 residents, and each Milam Street route still needs its marked crossings exposed.
Our main office is in Yukon, Oklahoma, and Mexia work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. A 3/4 inch service at McKinney Street and 48 inch casing beneath US 84 show the range of work we handle, with bore lengths from 10 feet to 5,000 feet. Our family business dates to 1965, and we have done directional boring since 1982, experience we bring to routes along Palestine Street.

What is Mexia ground like to bore in near Normangee soil?
Normangee soil is the leading mapped series in Mexia, covering 26 percent of the city; Crockett soil accounts for another 22 percent. The USDA soil survey maps surface texture as clay loam across 38 percent and clay across 26 percent, while at about 40 inches it maps clay in 89 percent of the area. Average clay content at that depth is 46 percent, and 92 percent is mapped as heavy clay. These are survey patterns, not test borings, but they point to sticky cuttings that can swell and grip a pipe.
| USDA soil survey, inside the Mexia city limits | What is mapped |
|---|---|
| Soil series mapped | Normangee 26 percent, Crockett 22 percent, Wilson 12 percent, Ellis 11 percent and Leson 7 percent |
| Texture at the surface | clay loam 38 percent, clay 26 percent and loam 25 percent |
| Texture about 40 inches down | clay 89 percent, clay loam 4 percent and bedrock 3 percent |
| Engineering class about 40 inches down | fat clay (CH) 91 percent and lean clay (CL) 5 percent |
| Average clay content about 40 inches down | 46 percent |
| Bedrock mapped within 60 inches | 54 percent of the area (3 percent hard rock, 51 percent weathered rock) |
| Seasonal water table within 60 inches | 5 percent of the area |
| Flood prone soils | 3 percent of the area |
| High corrosion risk for uncoated steel | 92 percent of the area |
The USDA soil survey maps bedrock within 60 inches across 54 percent of Mexia, with weathered bedrock accounting for 51 percent and hard bedrock for 3 percent. A seasonal water table is mapped within 60 inches in 5 percent of the area, and flood prone soils in 3 percent. High steel corrosion risk covers 92 percent, so the line owner should consider casing and tracer wire materials. The Cenozoic Smectitic Clay Decomposition Residuum includes clay and sand that expand when wet and shrink when dry; controlled fluid and staged reaming suit that changing ground.
What does boring Mexia clay call for?
For Mexia clay, we manage the hole with staged reaming and fluid suited to the sticky ground mapped near 40 inches. Along Milam Street, keeping returns controlled also helps protect pavement.
- Normangee clay can cling to the reamer and swell around pipe, so we use thinner fluid with polymer and open the hole in stages.
- Because heavy clay is mapped around Mexia, we watch Salt Creek route returns closely and keep fluid pressure controlled near streets and pavement.
- We track the drill head with a walkover locator and log depth and pitch; every marked line on a Milam Street path is exposed first.
- With Mexia clay able to shrink and crack as it dries, we have the pipe ready and pull it through the same day the hole is opened.

Where does a line have to go under US 84 in Mexia?
A Mexia bore may pass beneath US 84, Texas State Highway 14, FM 39 or another state route, so the road surface and the right of way shape the plan. Milam Street extends 2.67 miles inside the city, Main Street 2.46 miles and Palestine Street 2.33 miles. McKinney Street adds another 1.89 miles of potential route. Boring beneath these streets lets the line pass under pavement and driveways without cutting across the surface; exact crossings depend on the route and marked utilities.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| US 84 | US highway | 3 roadway miles inside | State highway office |
| Texas State Highway 14 | State highway | 9.3 roadway miles inside | State highway office |
| FM 39 | State highway | 3.2 roadway miles inside | State highway office |
| Texas State Highway 171 | State highway | 0.9 roadway miles inside | State highway office |
| FM 1365 | State highway | 1.3 roadway miles inside | State highway office |
| FM 3119 | State highway | 0.4 roadway miles inside | State highway office |
| Texas State Highway 39 | State highway | 0.4 roadway miles inside | State highway office |
| FM 1633 | State highway | 0.3 roadway miles inside | State highway office |
| Union Pacific | Railroad | 3.7 track miles inside | The railroad |
| Salt Creek | Stream | 1.29 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Elm Creek | Stream | 0.44 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Plummers Creek | Stream | 0.42 channel miles inside | Checked for Corps of Engineers jurisdiction |
Union Pacific track runs 3.7 miles through Mexia on the Ennis Subdivision, and public mapping shows 8 street and rail crossings in the city. A route under that track needs railroad coordination before the crossing plan is set. Salt Creek runs 1.29 channel miles in Mexia; Elm Creek and Plummers Creek are mapped there too. Five street crossings of named streams are mapped, so a creek route needs channel depth planning and a check for Corps jurisdiction. No lakes or ponds are mapped within one mile, which we consider when planning a Mexia bore route.
Whose permission does a Mexia bore near Union Pacific need?
For a bore along US 84 or Texas State Highway 14, the utility that owns the line files the TxDOT utility permit in RULIS, with the TxDOT Waco District reviewing it; we prepare the bore plan and profile for that filing. Cover depends on the line: electric and communication crossings need 60 inches below the lowest crossed grade, while water crossings need 60 inches and pressurized sewer crossings need 60 inches. The permit may set another depth. A crossing of Union Pacific track needs an agreement with the railroad, and Salt Creek is checked for Corps jurisdiction during planning. Mexia city streets belong to the city.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Who owns the lines in Limestone County near Mexia?
The City of Mexia public water system serves 7,459 people through 4,064 service connections and uses purchased groundwater. That can put water lines alongside routes on Milam Street or McKinney Street, but the service connection at a specific address still needs locating. Utilities reporting electric service in Limestone County include Entergy Texas, Oncor Electric Delivery Company, Navarro County Electric Cooperative and Navasota Valley Electric Cooperative. We confirm the line owner for an electric conduit route before planning the bore.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| City of Mexia | Public water system | Groundwater bought from another system | 4,064 connections, 7,459 people served |
| Entergy Texas, Oncor Electric Delivery Company, Navarro County Electric Cooperative and Navasota Valley Electric Cooperative | Electric utilities reporting service in Limestone County | EIA Form 861 | Confirm the line owner by address |
The American Community Survey 2019 to 2023 five year estimates put Mexia’s median housing year at 1978; 25 percent of units were built before 1960, 60 percent from 1960 to 1999 and 15 percent in 2000 or later. Along older Palestine Street blocks, a replacement route may meet existing services, while newer McKinney Street connections may call for a service bore. We hydrovac expose marked utilities on the bore path before drilling near them, since paint shows position but not depth.

What is near Mexia, including Tehuacana?
Mexia is in Limestone County at 530 feet elevation and covers 7.2 square miles, with ZIP code 76667. Tehuacana is 5.5 miles northwest; Wortham is 7.7 miles north, Kirvin is 10.8 miles northeast, and Groesbeck is 11.0 miles south. Groesbeck is the county seat, while Corsicana is the nearest larger city, 27.8 miles north. The Yukon yard is 304 road miles from Mexia, a 6.0 hour drive, so distance is part of planning a route near US 84 or Salt Creek.
Places near Mexia
- Directional boring in Tehuacana: 5.5 miles northwest
- Directional boring in Wortham: 7.7 miles north
- Directional boring in Kirvin: 10.8 miles northeast
- Directional boring in Groesbeck: 11 miles south
- Directional boring in Coolidge: 11.1 miles northwest
- Directional boring in Corsicana: 27.8 miles north
What kinds of bores come up in Mexia near Salt Creek?
- Highway crossing: A bore beneath US 84 keeps the line below pavement, with TxDOT review shaping the route and cover plan.
- Water service: A connection near Milam Street can tie into the City of Mexia system, whose source is purchased groundwater.
- Fiber drop: A route along Main Street can carry fiber beneath driveways without cutting the paved surface.
- Creek crossing: A Salt Creek bore needs a planned path below the channel and a check for Corps jurisdiction.
- Rail crossing: A route beneath the 3.7 miles of Union Pacific track in Mexia needs railroad agreement before construction.
- Electric conduit: A conduit route near McKinney Street starts with confirming the line owner among providers reporting service in Limestone County.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What should I send for a Mexia bore near McKinney Street?
For a quote near McKinney Street, start with the address or map pin so we can locate the route. Tell us what goes underground, such as water or fiber, then give the pipe or conduit size and the footage. A sketch or plans showing a crossing of US 84 or Salt Creek helps us understand the route before we scope the work.
The drive from Yukon is 304 road miles, so mobilization is one part of pricing a Mexia job. Normangee clay can affect drilling time and fluid needs; a crossing of US 84 or Union Pacific track adds planning and exposure work. We also account for length, pipe or conduit size, marked utilities, pavement or concrete, creek and drainage crossings, pits, excavator time and sand backfill. High profile or emergency work in Mexia can also change the scope of our boring plan.
Questions people ask about boring in Mexia
Does Trinity take boring work in Limestone County near Mexia, and who staffs it?
Yes, we take directional boring work in Mexia, and the project is managed by Trinity from the first call through the bore log. Our own crews and vetted partner contractor yards can support the work, depending on the job. A route near Milam Street is planned for its specific ground and crossings, not assigned to a local office.
What does a Mexia bore under Union Pacific track require?
A bore beneath Union Pacific track in Mexia needs an agreement with the railroad that owns it. For a Mexia crossing, the agreement sets casing, depth and flagging conditions that guide our bore plan. The 3.7 miles of track in the city make the proposed route important to identify before the bore plan is finalized.
Can a line be bored under Salt Creek in Mexia?
A line can be planned beneath Salt Creek, with its route and depth set to pass under the channel. The creek runs 1.29 channel miles inside Mexia, and planning checks whether the crossing falls under U.S. Army Corps of Engineers jurisdiction. A site plan helps locate the banks and nearby marked utilities.
Who runs the Mexia public water system, and what is its water source?
The City of Mexia owns and runs the public water system, which uses purchased groundwater. The Mexia system’s 7,459 people and 4,064 service connections give us scale to consider for underground work. For a bore near McKinney Street, the actual water line location still needs to be established before drilling.
Which electric provider serves a Mexia address in Limestone County, and who confirms conduit specs?
Entergy Texas, Oncor Electric Delivery Company, Navarro County Electric Cooperative and Navasota Valley Electric Cooperative report service in Limestone County. Those records do not identify the provider at every Mexia address, so the line owner must be confirmed before planning an electric conduit bore near US 84.
Can a Mexia contractor bore under Palestine Street instead of cutting it?
Mexia’s city streets belong to the city, and directional boring can pass beneath Palestine Street without opening a trench through the pavement. The route still needs marked utilities exposed before drilling close to them. Palestine Street is 2.33 miles long within city limits, so the exact crossing point matters.
How far is Mexia from Yukon, and does Corsicana change the job plan?
At 304 road miles and a 6.0 hour drive from our Yukon, Oklahoma main office, Mexia travel shapes our scheduling. Corsicana, the nearest larger city, is 27.8 miles north of Mexia, but it does not change the route requirements at a site on US 84. The Yukon distance is considered when planning mobilization.
How much notice does a Mexia bore near Milam Street need, and what if marks move?
For a bore near Milam Street, Texas811 needs the locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before work. If the start slips more than 14 days beyond the original notice, submit a new request. Have worn or moved marks refreshed through Texas811 before continuing.
What affects the cost of a directional bore in Mexia under US 84?
A Mexia bore under US 84 is priced by its scope, not by one factor alone. Length, pipe or conduit size, Normangee clay, utility crossings, pavement, pits and equipment time all affect the work. Salt Creek drainage crossings and the 304 road miles from Yukon can also change the plan and mobilization.
Where the Mexia facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Mexia
- U.S. Census Bureau, TIGER/Line 2024: Mexia boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Mexia
- U.S. Census Bureau, American Community Survey 2019 to 2023: Mexia housing units and year built
- Macrostrat geologic map compilation: map units under Mexia
- U.S. EPA Safe Drinking Water Information System: public water systems serving Mexia
- U.S. Department of Transportation, North American Rail Network: track owners in Limestone County
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Limestone County
- U.S. Geological Survey, Elevation Point Query Service: Mexia elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Mexia
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Mexia
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Mexia, Texas
Type the address of your job in Mexia. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.