Directional Boring Contractors in Titus County, TX
Trinity Boring Solutions is a directional boring contractor serving Titus County, Texas, installing water, sewer, gas, electric and fiber lines without an open trench in Mount Pleasant, Talco, Winfield and Miller’s Cove. From the Trinity main office in Yukon, Oklahoma it is about 290 road miles southeast to Mount Pleasant, the county seat. Bores here most often pass under Interstate 30 and US 271, the Sulphur River and Union Pacific track. Call (405) 409-7423 any time.
Free Bore Planner
Plan Your Bore in Titus County, Texas
Type the address of your job in Titus County. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
What Should You Know Before Boring in Titus County?
Titus County covers 406 square miles, has about 31,547 residents and sits in the TxDOT Atlanta District.
| County seat | Mount Pleasant |
|---|---|
| Population | 31,547 (2024 Census estimate), up 1.0% since 2020 |
| Land area | 406 square miles |
| Largest cities and towns | Mount Pleasant (16,238), Talco (487), Winfield (422) and Miller's Cove (73) |
| TxDOT district | TxDOT Atlanta District |
| 811 center | Texas811 (call 811), two working days of notice |
| Electric utilities | Southwestern Electric Power, Texas-New Mexico Power, Bowie-Cass Electric Cooperative and Wood County Electric Cooperative |
| Interstate and US highways | Interstate 30, US 271 and US 67 |
| State Highways | 49 |
| Rivers | Sulphur River |
| Creeks and other streams | Whiteoak Creek, Big Cypress Creek, Swauano Creek, Hart Creek, Ripley Creek, Tankersley Creek, Horse Creek and Williamson Creek |
| Lakes | Lake Bob Sandlin, Welsh Reservoir and Tankersley Lake |
| Railroads | Union Pacific, Canadian Pacific Kansas City and short line railroads, about 28 main line miles |
| Average precipitation | 47.9 inches a year (1991 to 2020) |
| New housing units permitted | 253 in 2025 |
| Road distance from Trinity main office | About 290 miles from Yukon, Oklahoma to Mount Pleasant |
| Trinity insurance | General liability of $1,000,000 per occurrence and $4,000,000 aggregate, plus $5,000,000 excess liability |
Sources: Census Bureau (2024 population, 2025 building permits, TIGER/Line roads and water), EIA Form 861 (2025), NOAA 1991 to 2020 precipitation, federal rail network map, TxDOT districts, OpenStreetMap routing. Checked November 2026.
What Does a Bore Have to Cross in Titus County?
A bore in Titus County most often has to cross a highway such as Interstate 30, US 271 or US 67, a stream such as the Sulphur River, Whiteoak Creek or Big Cypress Creek and Union Pacific or Canadian Pacific Kansas City track. State Highways 49 also run through the county. The Census map names 25 larger streams in Titus County, led by the Sulphur River, Whiteoak Creek, Big Cypress Creek, Swauano Creek, Hart Creek and Ripley Creek. The rest are Tankersley Creek, Horse Creek, Williamson Creek, Piney Creek, Big Slough, East Piney Creek, Prairie Branch, Smackover Creek, Lacy Creek, Snake Creek, Dragoo Creek, Hayes Creek, Evans Creek, Bear Creek, McCullough Creek, Mill Creek, Little Boggy Creek, West Fork Horse Creek and Taylor Creek. Lake Bob Sandlin, Welsh Reservoir and Tankersley Lake are the main mapped lakes. The federal rail map shows about 28 miles of main line track in Titus County: Union Pacific about 16 miles, Canadian Pacific Kansas City about 4 and short line and other operators about 8.

What Is the Ground Like for Directional Boring in Titus County?
Shallow groundwater is the main thing to plan for in Titus County: the federal soil survey records a seasonal water table within five feet of the surface on about 54 percent of the county. On wet Titus County ground the entry and exit pits are kept small and the bore is sealed with drilling fluid. May is the wettest month in Titus County at 4.8 inches on average and August the driest at 2.8. Titus County averages 47.9 inches of precipitation a year, so wet weather and water in the pits are planned for.
- Most common soils: Woodtell (24%), Freestone (15%) and Estes (8%).
- Surface texture: most often fine sandy loam (41%) or loam (13%).
- Bedrock within 5 feet: about 11% of the county. Most of it is soft, weathered rock.
- Clay rich layer (35% clay or more) in the top 5 feet: about 60% of the county.
- Sandy layer (70% sand or more) in the top 5 feet: about 26% of the county.
- Seasonal water table within 5 feet: about 54% of the county.
Source: USDA Natural Resources Conservation Service, Soil Survey Geographic Database, Camp, Franklin, Morris, and Titus Counties, Texas (survey area TX603, version 23, September 8, 2026), through Web Soil Survey. Percentages are shares of mapped county area.
Who Permits a Bore in Titus County?
The TxDOT Atlanta District permits bores under state highways in Titus County, the Titus County Commissioners Court handles county roads, and Mount Pleasant, Talco and Winfield each handle their own streets.
- State highways. Interstate 30, US 271, US 67, the other numbered state routes and the farm to market roads in Titus County are on the state system. The utility owner files a TxDOT utility permit in RULIS.
- Texas811 locates. Texas811 needs at least two working days of notice before digging (Texas811 FAQ; Texas Utilities Code, Section 251.151).
- Railroads. A bore under Union Pacific, Canadian Pacific Kansas City or short line track in Titus County needs a crossing agreement from the railroad that owns it, which sets the casing, depth and flagging.
- Water crossings. A bore under the Sulphur River, Whiteoak Creek or Lake Bob Sandlin is checked for U.S. Army Corps of Engineers jurisdiction while the path is planned.
Statewide rules are on the Directional Boring Texas page, and Trinity supplies the bore plan and profile for the permit package.
Which Electric Utilities Serve Titus County?
Southwestern Electric Power, Texas-New Mexico Power, Bowie-Cass Electric Cooperative and Wood County Electric Cooperative serve Titus County, according to 2025 filings with the U.S. Energy Information Administration. Southwestern Electric Power and Texas-New Mexico Power are investor owned utilities; Bowie-Cass Electric Cooperative and Wood County Electric Cooperative are member owned cooperatives. The owner of the line sets the conduit size, depth and inspection steps, so it is confirmed before a conduit bore in Titus County is planned. More on electric line boring for electric cooperatives.
How Much New Construction Is There in Titus County?
Titus County permitted 253 new housing units in 2025, 13 of them single family homes, according to the Census Bureau Building Permits Survey. The population of Titus County went from 31,241 in 2020 to 31,547 in 2024, a gain of 1.0 percent. That pace of building in Titus County puts new water, gas, electric and fiber services under finished pavement.
Which Cities and Towns in Titus County Does Trinity Serve?
Trinity takes directional boring work in all 4 incorporated places in Titus County and at sites outside city limits, and Mount Pleasant is the largest with about 16,238 residents.
| City or town | 2024 population |
|---|---|
| Mount Pleasant | 16,238 |
| Talco | 487 |
| Winfield | 422 |
| Miller's Cove | 73 |
Source: U.S. Census Bureau 2024 estimates, counting only the part of each city inside Titus County.
Titus County borders Camp County, Franklin County, Morris County and Red River County; every county is on the Directional Boring in All 254 Texas Counties page. The neighboring county seats are Pittsburg (Camp), Mount Vernon (Franklin), Daingerfield (Morris) and Clarksville (Red River).
Which Directional Boring Services Are Available in Titus County?
Every Trinity service is available in Titus County: horizontal directional drilling from 3/4 inch service lines to 48 inch casing, auger boring, hydrovac potholing, trenching and 24 hour emergency response, all listed under Underground Utility and Boring Services.
- Road, highway, railroad, creek and river bore crossings, including Interstate 30, US 271 and the Sulphur River
- Bores under Union Pacific and Canadian Pacific Kansas City track, built to the railroad boring requirements of the owner
- Drinkable water line boring and sewer force mains in Mount Pleasant or Talco and on rural water systems
- Underground conduit in Southwestern Electric Power and Texas-New Mexico Power territory, see electric line boring
- Fiber optic boring for ISPs and broadband builders along Interstate 30
- Municipal boring services for cities such as Mount Pleasant, Talco and Winfield
The free Bore Planner sizes a Titus County job before you call.
Titus County Directional Boring FAQs: What Do Customers Ask?
Does Trinity Boring Solutions work in Mount Pleasant, Texas?
Yes. Trinity Boring Solutions takes work in Mount Pleasant, Talco, Winfield and Miller’s Cove and the rural parts of Titus County. Trinity works in Texas with its own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted.
Who approves a bore under Interstate 30 in Titus County?
The TxDOT Atlanta District. The utility owner files the permit in the TxDOT RULIS system. County roads go through the Titus County Commissioners Court and city streets through the city.
Is there rock in Titus County?
Yes, in places. The federal soil survey records bedrock within five feet of the surface on about 11 percent of Titus County, most of it soft, weathered rock. Potholing confirms it on the actual bore path.
Can a line be bored under the Sulphur River in Titus County?
Yes. A drill is steered below the bed of the Sulphur River from a pit on each bank and the pipe is pulled back through, so the channel is not opened. Federal jurisdiction over the crossing is checked first.
Which railroads have track in Titus County?
Union Pacific, Canadian Pacific Kansas City and short line operators, with about 28 miles of main line track on the federal rail map. Each requires its own crossing agreement before a bore goes under the rails.
Is Trinity insured for work in Titus County?
Yes. Trinity Boring Solutions carries general liability of $1,000,000 per occurrence and $4,000,000 aggregate, plus $5,000,000 excess liability. Ask for a certificate with the quote.
How much does directional boring cost in Titus County?
We start from a general range based on length and pipe size. Depth, the crossings and the ground set the number, and shallow groundwater is a factor on many Titus County jobs.
How Do You Get a Bore Quote in Titus County?
Call (405) 409-7423 any time or send the address in Titus County, the utility, the length and what it crosses. Trinity has bored since 1965 and is family owned.