Washburn Texas Directional Boring: Pullman Silty Clay Loam, US 287, BNSF Railway
Quick Answer: Can we get a line under US 287 in Washburn without cutting it? Yes, we use directional boring, also called horizontal directional drilling (HDD), for that crossing. Our Yukon, Oklahoma main office is 244 road miles away, and Bravo Road access helps define a route. USDA maps Pullman soil across 92 percent of the community, with clay loam about 40 inches down. That sticky ground calls for staged reaming and a ready pipe pull on US 287.
Washburn bores at a glance
- Unincorporated community in Armstrong County, Texas. Population 116 (2020 Census count).
- Road distance from our Yukon, Oklahoma main office: 244 miles, about 4.6 hours of driving.
- Ground: Pullman soil is mapped on 92 percent of the area, with clay loam about 40 inches down.
- Rock: no bedrock is mapped in the top 60 inches.
- Highways inside the boundary: US 287 and FM 2250. State permit office: TxDOT Amarillo District.
- Railroad track inside the boundary: none mapped.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Who does directional boring in Washburn near US 287?
Can we get a line under US 287 without cutting the road? We take directional boring work in Washburn, an unincorporated community in Armstrong County. The Census Bureau counted 116 residents in 2020. We install water, sewer, gas, electric conduit and fiber, with routes planned along places such as Bravo Road or toward a US 287 crossing.
Our main office is in Yukon, Oklahoma, and Washburn work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. For a job near US 287, our range runs from a 3/4 inch service line to a 48 inch casing. We are a family business started in 1965, with directional boring work dating to 1982.

How does Pullman soil affect drilling in Washburn?
The USDA soil survey maps Pullman soil across 92 percent of Washburn and Lofton across 5 percent. Pullman silty clay loam covers 74 percent of the mapped area on 0 to 1 percent slopes, plus 18 percent on 1 to 3 percent slopes. About 40 inches below the surface, clay loam is mapped across 92 percent and clay across 8 percent. The average clay content at that depth is 40 percent. This is a heavy, sticky profile, not a sandy one, so reaming and fluid management matter.
| USDA soil survey, inside the Washburn mapped community boundary | What is mapped |
|---|---|
| Soil series mapped | Pullman 92 percent and Lofton 5 percent |
| Texture at the surface | silty clay loam 92 percent, clay loam 5 percent and clay 3 percent |
| Texture about 40 inches down | clay loam 92 percent and clay 8 percent |
| Engineering class about 40 inches down | lean clay (CL) 92 percent and fat clay (CH) 8 percent |
| Average clay content about 40 inches down | 40 percent |
| Bedrock mapped within 60 inches | None mapped |
| Seasonal water table within 60 inches | 8 percent of the area |
| Flood prone soils | 0 percent of the area |
| High corrosion risk for uncoated steel | 100 percent of the area |
Bedrock is not mapped in the top five feet of Washburn, though the geologic map shows Eolian Sheet Sand of Cenozoic age and Paleocene Cenozoic sedimentary rocks. The soil survey maps a seasonal water table within 40 inches in 8 percent of the area, so some pits may need pumping. Flood prone soils are not mapped. High steel corrosion risk covers the mapped area, so the line owner should address casing and tracer wire materials; HDPE avoids that steel corrosion concern.
How do crews handle Washburn’s clay loam?
Pullman silty clay loam is the main mapped soil in Washburn. We plan the bore to control sticky cuttings and pipe drag, while keeping fluid pressure in check near pavement on US 287.
- Pullman soil is mapped across most of Washburn, so we use thinner drilling fluid and staged reaming to manage sticky cuttings and reduce pipe drag.
- Because clay makes up the mapped ground at about 40 inches, we watch returns and pressure near US 287 pavement to limit the chance of lifting it.
- Washburn’s mapped seasonal water table reaches within 40 inches in some areas, so we keep pits small and pump them if water collects.
- Before a bore near Looney Street, we pothole each marked utility; a walkover locator follows the drill head while depth and pitch are logged.

What does a bore have to cross in Washburn near BNSF Railway?
US 287 runs through Washburn for 2.1 mapped roadway miles, and FM 2250 adds 1.1 miles. A bore in either road right of way needs a route and depth plan suited to that highway. The community’s longest named street is Bravo Road at 1.0 mile; Lively Street measures 0.54 mile and Looney Street 0.39 mile. Holhouser Street and Moore Street each measure 0.38 mile. These roads give a project specific access points for pits and utility checks.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| US 287 | US highway | 2.1 roadway miles inside | State highway office |
| FM 2250 | State highway | 1.1 roadway miles inside | State highway office |
| BNSF Railway | Railroad nearby | 0 miles outside | The railroad |
BNSF Railway runs along or touches Washburn’s mapped community boundary, but no railroad is mapped inside it. No mapped street and rail crossings are recorded inside the community, so a rail bore depends on whether the proposed route actually reaches the track. No streams, lakes or ponds are mapped inside the community or within one mile. A creek crossing is not a mapped local feature to plan around here.
Who approves a Washburn bore in Armstrong County?
Washburn has no city government, so work on local public streets is handled through the county or the state rather than a city office. For US 287, FM 2250 or another state highway right of way, the utility owner files the utility permit in TxDOT’s online RULIS system. The TxDOT Amarillo District reviews it. We provide the bore plan and profile for the utility owner’s application, and work under the permit issued to that owner. A US 287 crossing also needs the applicable highway cover and boring method in the plan.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Whose lines are buried in Washburn, Armstrong County?
The water provider for the specific address in Washburn has to be confirmed with the county or local water district before a bore is planned. Southwestern Public Service and Greenbelt Electric Cooperative report electric service in Armstrong County, but that does not establish which one serves a particular address. We confirm the line owner before planning an electric conduit bore along a Washburn street, then expose marked utilities on the route before drilling near them.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| Southwestern Public Service and Greenbelt Electric Cooperative | Electric utilities reporting service in Armstrong County | EIA Form 861 | Confirm the line owner by address |
The American Community Survey 2019 to 2023 five year estimates put Washburn’s median housing year at 1968; 27 percent of units were built before 1960, and none were built in 2000 or later. Along Looney Street, an older service replacement may meet existing lines, while a new connection has its own route to check. Hydrovac potholing exposes each marked utility before drilling near it, since paint shows position but not depth.

How far is Washburn from Amarillo and our Yukon yard?
Washburn is in Armstrong County, at an elevation of 3,525 feet, and covers 0.96 square miles. Its ZIP code is 79019. Claude, the county seat, is 12.5 miles east; Lake Tanglewood is 14.3 miles southwest; and Amarillo is 15.0 miles west. Amarillo is the nearest larger city. Our Yukon, Oklahoma yard is 244 road miles away, a drive of 4.6 hours. That distance is part of planning crew and equipment mobilization for a Washburn bore.
Places near Washburn
- Directional boring in Claude: 12.5 miles east
- Directional boring in Lake Tanglewood: 14.3 miles southwest
- Amarillo: 15 miles west
- Directional boring in Palisades: 15.1 miles southwest
- Directional boring in Timbercreek Canyon: 16.2 miles southwest
What would we bore near Bravo Road in Washburn?
- Highway crossing: A bore under US 287 can carry a water line or conduit without cutting across the paved travel lanes.
- Street service: A water or sewer connection along Bravo Road can use pits in the dirt rather than an open cut through the street.
- Fiber route: A fiber conduit near Lively Street can be planned around marked utilities and the Pullman silty clay loam.
- Rail crossing: If a planned route reaches BNSF Railway at Washburn’s boundary, the crossing needs an agreement with the railroad.
- Electric conduit: A route near Looney Street starts with confirming the line owner and exposing marked utilities before drilling.
- FM road crossing: A bore beneath FM 2250 needs a TxDOT utility permit when it occupies the highway right of way.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What do you need to quote work near Holhouser Street in Washburn?
For a bore near Holhouser Street, tell us the address or map pin, what needs to go underground, the pipe or conduit size, and the footage. A sketch or plan helps show how the route meets a named street or US 287. Those details let us check the path and identify what the job needs before preparing a quote.
Price follows the actual work, not just the length. Pullman clay loam affects drilling and reaming; a US 287 crossing can add highway requirements, and a route near BNSF Railway may need railroad coordination. We also consider pipe size, utilities to expose, pavement or concrete, pits, excavator time, backfill and any creek or drainage crossing. Washburn’s 244 road miles from Yukon affect mobilization, as can emergency timing or a high profile job.
Questions people ask about boring in Washburn
Does Trinity Boring Solutions take directional boring jobs in Washburn and Armstrong County?
Yes. We take directional boring work in Washburn, and our crews or vetted drilling contractor partners staff jobs there. You work with Trinity from the first call through the bore log, including a route on Bravo Road or near US 287. Our main office is in Yukon, Oklahoma.
Does Pullman soil in Washburn corrode steel, and what pipe should I use?
The USDA soil survey maps high steel corrosion risk across Washburn, including its dominant Pullman soil. The line owner chooses any coating for steel casing or tracer wire. HDPE is not subject to that steel corrosion concern. We can discuss the planned material for a route near US 287, but the line owner makes the selection.
What ground does a bore pass through in Washburn’s Pullman soil?
Pullman soil is mapped across 92 percent of Washburn. About 40 inches below the surface, the mapped texture is clay loam across 92 percent of the area and clay across 8 percent. That heavy ground can stick to the reamer, so staged reaming and a controlled fluid plan help manage the bore.
Will a directional bore in Washburn hit rock?
Bedrock is not mapped in the top five feet of Washburn, but that does not rule out deeper rock. The geologic map identifies Eolian Sheet Sand of Cenozoic age and Paleocene Cenozoic sedimentary rocks. A route near FM 2250 still needs to be assessed for the conditions encountered as drilling advances.
Who approves a bore under US 287 in Washburn?
The utility owner, not the driller, submits the TxDOT utility permit application for work in the US 287 right of way. The TxDOT Amarillo District reviews it through RULIS. We prepare the bore plan and profile for the owner’s application, including the proposed crossing and cover.
What does a bore under BNSF Railway in Washburn require?
A bore beneath BNSF Railway needs an agreement from the railroad that owns the track. The track runs along or touches Washburn’s mapped community boundary, rather than through the mapped interior. The railroad sets requirements such as casing, depth and flagging for its crossing.
Can I reach Trinity after hours about an urgent bore on Looney Street in Washburn?
Yes. A person answers Trinity’s phone, (405) 409-7423, 24 hours a day. If an urgent job concerns Looney Street, tell us where the work is, what line is involved and what has happened so we can understand the request.
How much notice does Texas811 need for a bore near Bravo Road in Washburn?
Texas law requires a locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before work. If the Bravo Road start moves more than 14 days past the original notice, submit a new request. Have worn or moved marks refreshed through Texas811 before work continues.
What affects the cost of a directional bore under US 287 in Washburn?
The job’s length and pipe size matter, as do Pullman clay loam, pavement, utilities to expose and the number of crossings. A US 287 right of way adds highway planning, while Washburn’s 244 road miles from Yukon affect mobilization. Pit work, backfill, emergency timing and the work profile also shape the scope.
Where the Washburn facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Washburn
- U.S. Census Bureau, TIGER/Line 2024: Washburn boundary, roads, rail lines and streams
- U.S. Census Bureau, 2020 Census: Washburn population count
- U.S. Census Bureau, American Community Survey 2019 to 2023: Washburn housing units and year built
- Macrostrat geologic map compilation: map units under Washburn
- U.S. Department of Transportation, North American Rail Network: track owners in Armstrong County
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Armstrong County
- U.S. Geological Survey, Elevation Point Query Service: Washburn elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Washburn
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Washburn
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Washburn, Texas
Type the address of your job in Washburn. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Washburn
All counties: Texas county list.
