Double Horn Texas Directional Boring: Hensley Loam, Love Creek and Highway 71
Quick Answer: Double Horn is a small incorporated city in Burnet County, so its city streets belong to the city; we do directional boring, also called horizontal directional drilling (HDD), for routes near Love Creek. Our Yukon, Oklahoma main office is 405 road miles away, and Texas State Highway 71 is one local crossing to plan around. Hensley gravelly loam covers 62 percent of the mapped area, while bedrock is typically 17 inches down, so rock can affect a bore. A route near Vista View Trail needs its utilities checked before drilling.
Double Horn bores at a glance
- Incorporated city in Burnet County, Texas. Population 282 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 405 miles, about 8.3 hours of driving.
- Ground: Hensley soil is mapped on 62 percent of the area, with bedrock about 40 inches down.
- Rock: bedrock is mapped within 60 inches on 92 percent of the area.
- Highways inside the boundary: Texas State Highway 71. State permit office: TxDOT Austin District.
- Railroad track inside the boundary: none mapped.
- Named streams inside the boundary: Love Creek, Double Horn Creek and Gridiron Branch.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Who does directional boring near Love Creek in Double Horn?
Double Horn is a small incorporated city in Burnet County, with 282 residents in the Census Bureau Vintage 2024 estimate. We install water, sewer, gas, electric conduit and fiber where a route along Cross Trail or East Trail needs a buried connection. Double Horn has 9.1 public road centerline miles, so the proposed path can be checked against the street and utilities in its corridor.
Our main office is in Yukon, Oklahoma, and Double Horn work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our longest bore runs roughly 4,100 feet with 48 inch pipe under the Arkansas River in Tulsa, Oklahoma. A Double Horn request may instead be a service line or conduit run planned around Love Creek, Hensley gravelly loam and shallow mapped bedrock.

What ground does a Double Horn bore meet in Hensley soil?
The USDA soil survey maps Hensley gravelly loam across 62 percent of Double Horn, with Tarpley and Eckrant complex mapped across another 22 percent. At about 40 inches below the surface, bedrock is mapped across 92 percent of the area and clay across 8 percent. The mapped surface textures are mostly gravelly loam, with stony clay also present. These are area patterns, not test borings at a property. A site check matters because the mapped ground can change along a bore route near Oak Meadow Trail.
| USDA soil survey, inside the Double Horn city limits | What is mapped |
|---|---|
| Soil series mapped | Hensley 62 percent, Tarpley 22 percent, Krum 8 percent and Eckrant 7 percent |
| Texture at the surface | gravelly loam 62 percent, stony clay 22 percent and clay 9 percent |
| Texture about 40 inches down | bedrock 92 percent and clay 8 percent |
| Engineering class about 40 inches down | fat clay (CH) 8 percent |
| Average clay content about 40 inches down | 50 percent |
| Bedrock mapped within 60 inches | 92 percent of the area (91 percent hard rock, 0 percent weathered rock) |
| Seasonal water table within 60 inches | 0 percent of the area |
| Flood prone soils | 0 percent of the area |
| High corrosion risk for uncoated steel | 100 percent of the area |
Bedrock is typically mapped at 17 inches, and hard bedrock is mapped within 60 inches across 91 percent of Double Horn. That can call for rock tooling and slower progress, especially near a soil to rock boundary. Seasonal water table and flood prone soils are not mapped in the city, but that does not replace checking the route. High steel corrosion risk is mapped across the area, so the line owner should address casing and tracer wire materials. The USDA map also identifies Limestone-Clast Loamy Colluvium of Quaternary age and the Honeycut Formation of Floian age.
How do crews handle bedrock in Double Horn?
The USDA soil survey puts shallow bedrock across much of Double Horn, so the plan has to account for changes between loam and rock. A bore near Love Creek also needs a route and depth that fit the crossing.
- Because Hensley gravelly loam is widespread and bedrock is typically 17 inches down, we choose tooling for the ground found along the route.
- Where the mapped ground includes hard limestone, the crew can use rock tooling and move more slowly through the rock section.
- Before drilling near a marked line on Vista View Trail, we hydrovac pothole it; paint indicates position, not depth.
- A walkover locator follows the drill head, and the crew logs depth and pitch as a bore advances near Love Creek.

What might a bore cross near Vista View Trail in Double Horn?
Texas State Highway 71 runs through Double Horn, with 2.1 mapped roadway miles inside the city limits. Vista View Trail is the longest named street at 1.18 miles, followed by Cross Trail at 0.8 miles and Oak Meadow Trail at 0.63 miles. A bore along any of these routes needs a path that fits the road corridor and avoids existing lines. If a utility route enters the highway right of way, its owner needs to address the TxDOT permit and design requirements before work starts.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| Texas State Highway 71 | State highway | 2.1 roadway miles inside | State highway office |
| Love Creek | Stream | 1.05 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Double Horn Creek | Stream | 0.43 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Gridiron Branch | Stream | 0.35 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Alligator Creek | Stream nearby | 0.5 miles outside | Checked for Corps of Engineers jurisdiction |
No railroad is mapped inside Double Horn or within one mile outside its limits, so a mapped track crossing is not part of the city route picture. Love Creek runs 1.05 channel miles through the city, and Double Horn Creek adds 0.43 miles; three street crossings of named streams are mapped. A creek bore needs its depth planned around the channel, and the crossing is checked for U.S. Army Corps of Engineers jurisdiction during planning. No lakes or ponds are mapped within one mile of Double Horn, and we still verify the bore route along Vista View Trail.
Who approves a Double Horn bore near Burnet County roads?
Double Horn is incorporated, so its city streets, including Vista View Trail and Cross Trail, belong to the city itself. Texas State Highway 71 is the state route; work in its right of way needs a TxDOT utility permit reviewed by the Austin District. The utility that owns the line files in TxDOT’s RULIS system, while we prepare the bore plan and profile and work under the utility owner’s permit. TxDOT rules call for boring or tunneling beneath an existing highway, with required cover and casing set by the applicable permit. A Love Creek crossing is checked for federal jurisdiction during planning.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Which utilities serve Double Horn in Burnet County?
The water provider for a specific address in Double Horn has to be confirmed with the city, Burnet County or the local water district before a bore is planned. EPA drinking water records do not tie water systems to towns, so the provider cannot be matched from those records. In Burnet County, we coordinate boring plans around electric service reported by Oncor Electric Delivery Company and Pedernales Electric Cooperative. Before a conduit bore near East Trail, the line owner must be identified so its conduit specifications can be confirmed.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| Oncor Electric Delivery Company and Pedernales Electric Cooperative | Electric utilities reporting service in Burnet County | EIA Form 861 | Confirm the line owner by address |
The American Community Survey 2019 to 2023 five year estimates put Double Horn’s median housing year at 2008, and all 185 housing units were built in 2000 or later. That does not establish the age or condition of buried lines near Cross Trail. A project could involve a new service or a replacement where the owner identifies a need. Before drilling near a marked utility, we expose it with hydrovac potholing; paint shows location, not depth.

How far is Double Horn from Meadowlakes and our Yukon yard?
Double Horn is an incorporated city in Burnet County, at an elevation of 965 feet and covering 1.96 square miles. Marble Falls is 5.5 miles northwest and is the nearest larger city; Meadowlakes is 6.4 miles northwest. Burnet, the county seat, is 17.5 miles north. The road trip from our Yukon, Oklahoma main office is 405 miles and takes 8.3 hours. Those distances matter to crew mobilization for work near Texas State Highway 71 or Love Creek. ZIP code information is not included here.
Places near Double Horn
- Directional boring in Marble Falls: 5.5 miles northwest
- Directional boring in Meadowlakes: 6.4 miles northwest
- Directional boring in Cottonwood Shores: 7.6 miles northwest
- Directional boring in Horseshoe Bay: 10.1 miles west
- Directional boring in Granite Shoals: 10.8 miles northwest
What would we bore near Cross Trail in Double Horn?
- Highway crossing: A route beneath Texas State Highway 71 needs a bore plan that meets TxDOT requirements for its right of way.
- Water service: A proposed service along East Trail needs the address specific water provider confirmed before the bore is planned.
- Fiber conduit: A fiber route near Vista View Trail can be planned to pass below pavement without cutting the street.
- Creek crossing: A route across Love Creek needs channel depth planning and a check for U.S. Army Corps of Engineers jurisdiction.
- Electric conduit: A bore near Cross Trail starts with confirming the line owner and its conduit specifications.
- Replacement line: If a utility owner identifies a line near Oak Meadow Trail for replacement, potholing can expose marked lines before drilling.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
How do I get a quote for work near East Trail in Double Horn?
For boring planned along Vista View Trail, we start with an address or map pin. The exact spot matters near East Trail because the route may meet a street corridor or a marked utility. At Cross Trail, we need you to tell us what will go in the ground, the pipe or conduit size, and the footage. A sketch or plans help us check the path against nearby streets, Love Creek and Texas State Highway 71.
The scope sets the price, with ground, crossings and logistics all in view. Hensley gravelly loam and shallow mapped bedrock can change tooling and drilling time. A route involving Texas State Highway 71, a creek or several exposed utilities adds crossing work. Pavement, concrete, pits, excavator time and sand backfill also affect the job. At 405 road miles from Yukon, mobilization is another part of planning, especially for a high profile or emergency request.
Questions people ask about boring in Double Horn
Does Trinity take directional boring jobs in Burnet County’s Double Horn, and how are crews assigned?
Yes. Trinity Boring Solutions takes directional boring work in Texas, including requests in Double Horn, Burnet County. Work is performed by our crews or through satellite yards operated by drilling contractors we have vetted. You work with Trinity through the bore log, whether our own crew or a partner crew is on site near Love Creek.
Who owns electric lines in Double Horn, Burnet County, and who confirms conduit specs?
The line owner has to be confirmed for the specific address. Oncor Electric Delivery Company and Pedernales Electric Cooperative report electric service in Burnet County, but that does not identify the provider at every Double Horn property. Before a conduit bore near East Trail, we confirm the owner and use its specifications for the planned work.
Does the city or county control Oak Meadow Trail in Double Horn, and must a bore cut it?
Oak Meadow Trail is a city street because Double Horn is incorporated. A directional bore can pass beneath pavement without open cutting the street, with entry and exit pits placed in suitable ground. The route still needs to account for marked lines along Oak Meadow Trail and expose them before drilling nearby.
Are buried lines as new as the homes near Cross Trail in Double Horn?
Housing records do not establish buried line ages. The American Community Survey 2019 to 2023 five year estimates put the median housing year at 2008, with all 185 units built in 2000 or later. A bore near Cross Trail may serve new construction or replace a line if its owner calls for replacement; we check and pothole marked utilities before crossing.
Can Hensley soil in Double Horn corrode steel, and what pipe can be used?
The USDA soil survey maps high steel corrosion risk across Double Horn, including areas mapped as Hensley gravelly loam. For a Double Horn Creek crossing, we confirm the line owner selects any coating for steel casing or tracer wire. HDPE is not affected by soil corrosion, but the appropriate pipe and material depend on the line owner’s project specifications near Hensley soil.
What ground does a bore go through in Hensley soil in Double Horn?
The USDA soil survey maps Hensley gravelly loam across 62 percent of Double Horn. At about 40 inches below the surface, it maps bedrock across 92 percent of the area and clay across 8 percent. The typical mapped bedrock depth is 17 inches, so a bore near Oak Meadow Trail may encounter rock much sooner than a surface view suggests.
How far is Double Horn from Marble Falls and Trinity’s Yukon, Oklahoma office?
Marble Falls is 5.5 miles northwest of Double Horn. Trinity’s Yukon, Oklahoma main office is 405 road miles away, with a stated drive time of 8.3 hours. That distance is part of mobilization planning for work near Texas State Highway 71, along with the job’s length, ground conditions and access needs.
How much 811 notice is needed for a bore near Vista View Trail in Double Horn?
Texas811 needs a locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays; it can be made no earlier than 14 days before work. If a Vista View Trail start slips more than 14 days after the original notice, submit a new request. Along Texas State Highway 71, we have marks refreshed through Texas811 if they wear off or move before work continues.
What affects the cost of directional boring near Texas State Highway 71 in Double Horn?
The job scope sets the price, not a single local rate. Hensley gravelly loam and shallow mapped bedrock affect ground work; Texas State Highway 71, Love Creek and marked utility crossings affect the route. Pipe size, footage, pavement, pits and excavator time also matter. Mobilization from Yukon is part of the logistics for this location.
Where the Double Horn facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Double Horn
- U.S. Census Bureau, TIGER/Line 2024: Double Horn boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Double Horn
- U.S. Census Bureau, American Community Survey 2019 to 2023: Double Horn housing units and year built
- Macrostrat geologic map compilation: map units under Double Horn
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Burnet County
- U.S. Geological Survey, Elevation Point Query Service: Double Horn elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Double Horn
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Double Horn
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Double Horn, Texas
Type the address of your job in Double Horn. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Double Horn
Same county: Burnet · Bertram · Highland Haven · Briggs. All counties: Texas county list.
