trinityboringsolutions.com

Paint Rock Texas Directional Boring: Nuvalde Soil, Concho River and US 83

Quick Answer: Paint Rock is 366 road miles from our Yukon yard, so we staff work with our own crews and vetted partner drilling contractors for jobs near Roberts Avenue. We do directional boring, also called horizontal directional drilling (HDD), for routes that cross the Concho River or town streets. The USDA soil survey maps silty clay loam across 53 percent of Paint Rock, and sticky clay can grip pipe. We use staged reaming and plan the pull so the hole is not left open longer than needed.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Paint Rock bores at a glance

  • County seat of Concho County, Texas. Population 242 (Census Bureau 2024 estimate).
  • Road distance from our Yukon, Oklahoma main office: 366 miles, about 7.2 hours of driving.
  • Ground: Nuvalde soil is mapped on 28 percent of the area, with silty clay loam about 40 inches down.
  • Rock: bedrock is mapped within 60 inches on 19 percent of the area.
  • Highways inside the boundary: US 83 and FM 380. State permit office: TxDOT San Angelo District.
  • Railroad track inside the boundary: none mapped.
  • Named streams inside the boundary: Concho River and Hog Creek.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Which contractor handles directional boring near Roberts Avenue in Paint Rock?

Paint Rock is 366 road miles from our Yukon yard, and work here is staffed by our own crews and vetted partner drilling contractors. The Census Bureau Vintage 2024 estimate puts the town at 242 people. Along Roberts Avenue and other local streets, we install water, sewer, gas, electric conduit and fiber lines by bore when the route and access fit.

Our main office is in Yukon, Oklahoma, and Paint Rock work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our family business started in 1965, and we have been boring since 1982. On a Roberts Avenue job, we can size the work from a 3/4 inch service line up to 48 inch casing.

Trinity Boring Solutions branded compact directional drilling unit positioned beside a tree on a red dirt jobsite
Our compact directional drill set up beside a tree on a tight site. Photos on this page are from our jobs in Oklahoma and Texas.

How does Nuvalde soil affect directional boring in Paint Rock?

The USDA soil survey maps Nuvalde among Paint Rock’s common soil series, with Nuvalde silty clay loam mapped on both 0 to 1 percent and 1 to 3 percent slopes. Silty clay loam makes up 53 percent of mapped surface texture, while loam accounts for 24 percent. At about 40 inches below the surface, the survey maps silty clay loam across 31 percent and silty clay across 25 percent. Nuvalde, Frio, Talpa, and Mereta are mapped soil patterns we use for planning, not test borings. Clay can hold the hole open, but it may stick to the reamer and grip the pipe.

USDA soil survey, inside the Paint Rock city limitsWhat is mapped
Soil series mappedNuvalde 28 percent, Frio 24 percent, Talpa 15 percent, Mereta 8 percent and Cho 5 percent
Texture at the surfacesilty clay loam 53 percent, loam 24 percent and clay loam 11 percent
Texture about 40 inches downsilty clay loam 31 percent, silty clay 25 percent and bedrock 19 percent
Engineering class about 40 inches downlean clay (CL) 76 percent
Average clay content about 40 inches down35 percent
Bedrock mapped within 60 inches19 percent of the area (19 percent hard rock, 0 percent weathered rock)
Seasonal water table within 60 inches0 percent of the area
Flood prone soils26 percent of the area
High corrosion risk for uncoated steel32 percent of the area

The survey maps bedrock within 40 inches in 19 percent of Paint Rock, so a route near Nuvalde soil may need a plan for shallow rock. Seasonal water tables are not mapped within 60 inches, while flood prone soils cover 26 percent of the town. We would pay special attention to the Concho River corridor when setting crossing depth. High steel corrosion risk is mapped across 32 percent, so the line owner should consider casing and tracer wire protection. Terrace deposits of Cenozoic age include sand, silt, clay and gravel; Early Permian sedimentary rock is also mapped.

How do we plan a Paint Rock bore through silty clay loam along Roberts Avenue?

Paint Rock’s silty clay loam can stay open but may cling to the tooling and pipe. For a bore near Roberts Avenue, we adjust fluid and reaming to the ground we meet rather than assume the map tells the whole story.

  1. For Nuvalde silty clay loam, we use a thinner drilling fluid with polymer and ream in stages to limit sticky buildup on the tooling.
  2. Because clay can swell around pipe in Paint Rock, we coordinate the final ream and pipe pull for the same work window.
  3. Where bedrock is mapped within 40 inches, we check the ground as the bore advances and allow for slower drilling if rock is encountered.
  4. Near a Concho River crossing, we plan the bore below the channel and check jurisdiction during planning before setting the route.
Trinity Boring Solutions crew in hard hats at the exit pit with rock tooling on a sandstone bore in Guthrie, OK
Our crew at the exit pit with rock tooling on a sandstone bore in Guthrie, Oklahoma.

What does a bore have to cross in Paint Rock near the Concho River?

US 83 and FM 380 run inside Paint Rock, so a route crossing either highway needs room for a bore beneath the road and its right of way. Roberts Avenue is the longest named street at 1.09 miles in town. Moss Street runs 1.01 miles, and Bates Street runs 0.63 miles. A bore can pass beneath pavement without cutting it, but the entry and exit pits still need suitable space. The route and line depth matter most where a street meets a highway.

CrossingTypeMapped extentWho has a say
US 83US highway1.3 roadway miles insideState highway office
FM 380State highway2.2 roadway miles insideState highway office
Concho RiverStream1.43 channel miles insideChecked for Corps of Engineers jurisdiction
Hog CreekStream0.64 channel miles insideChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

No railroad is mapped inside Paint Rock or within one mile outside its limits, so a mapped rail crossing is not part of the local picture. The Concho River runs 1.43 channel miles through town, and Hog Creek runs 0.64 miles. Public mapping shows five street crossings of named streams, which makes stream location and crossing depth relevant to route planning. No lakes or ponds are mapped within one mile in Paint Rock, so we assess Hog Creek separately when planning a bore.

Who approves a Paint Rock bore that crosses US 83?

US 83 and FM 380 are state highways, so work in either road’s right of way goes through the Texas Department of Transportation’s San Angelo District. The utility that owns the line submits the application in TxDOT’s RULIS system; we prepare the bore plan and profile and work under the owner’s permit. TxDOT rules call for boring or tunneling beneath an existing highway, and a rural highway bore must extend under all travel lanes. As Paint Rock is incorporated in Concho County, we treat Moss Street as a town street when planning a bore. A Concho River or Hog Creek crossing is checked for U.S. Army Corps of Engineers jurisdiction during planning.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

What is already in the ground in Paint Rock and Concho County?

The water provider for a specific Paint Rock address has to be confirmed with the city, Concho County or the local water district before a bore is planned. County electric service is reported by AEP Texas North, Oncor Electric Delivery Company, Concho Valley Electric Cooperative and Southwest Texas Electric Cooperative. Those reports do not identify which company serves each address. Before a conduit bore near US 83, we confirm the line owner and its conduit specifications.

Line ownerWhat it isSourceSize
AEP Texas North, Oncor Electric Delivery Company, Concho Valley Electric Cooperative and Southwest Texas Electric CooperativeElectric utilities reporting service in Concho CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

The American Community Survey 2019 to 2023 five year estimates put Paint Rock’s median home year at 1949; 54 percent of housing units were built before 1960, and 1 percent were built in 2000 or later. Older service lines near Moss Street may be part of a replacement project, while newer work may serve a new connection. We hydrovac pothole each marked utility on the bore path before drilling near it, since the marks show position, not depth.

Trinity Boring Solutions crew running a 2 inch conduit directional bore with airport hangars and a parked jet in the background in Oklahoma City
Our crew running a 2 inch conduit bore near the hangars at an Oklahoma City airport.

Where is Paint Rock in relation to San Angelo and our Yukon yard?

Paint Rock is the incorporated county seat of Concho County, at an elevation of 1,631 feet, with 1.64 square miles of land and ZIP code 76866. Rowena is 11.8 miles northwest, Ballinger is 15.9 miles north, and Miles is 16.5 miles west. San Angelo, the nearest larger city, is 31.3 miles west. Our Yukon yard is 366 road miles away, a 7.2 hour drive, which can affect mobilization for a bore near FM 380 or the Concho River.

Places near Paint Rock

What boring work comes up near Roberts Avenue in Paint Rock?

  • Highway crossing: A bore beneath US 83 needs to pass under all travel lanes and fit the TxDOT San Angelo District permit.
  • Water service: A connection near Roberts Avenue can be bored beneath pavement, with the address water provider confirmed before planning.
  • Fiber drop: A route along Moss Street can carry fiber conduit beneath the street surface without cutting a trench through the pavement.
  • Creek crossing: A Concho River bore needs a route that stays below the channel, with jurisdiction checked during planning.
  • Utility crossing: For a marked line beneath Bates Street, we hydrovac pothole its location before the drill approaches.
  • Street connection: A sewer or electric conduit route near Guion Avenue can use entry and exit pits placed off the paved way.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

What drives the price of directional boring near Guion Avenue in Paint Rock?

For a quote near Guion Avenue, send the address or map pin, what is going in the ground, the pipe or conduit size and the footage; a sketch or plans help. The Concho River and the silty clay loam mapped in town can change the route, tooling and work area, so those details help us understand the actual bore.

The price follows the job conditions. Ground and rock come first around Paint Rock because clay can cling to the reamer, and bedrock is mapped within 40 inches in part of town. We also account for Concho River crossings, utilities to expose, pavement and concrete, pit and excavator needs, and sand backfill. The distance from Yukon affects mobilization, while an emergency schedule can change the work plan.

Questions people ask about boring in Paint Rock

Does Trinity take directional boring jobs in Paint Rock and Concho County?

Yes. We take directional boring work in Paint Rock, and our own crews or vetted partner drilling contractors can staff a project in Concho County. From the first call through the bore log, we keep one point of contact for work near US 83, whatever crew is on site. Roberts Avenue is one example of a local street route we can review.

Can a line be bored under the Concho River in Paint Rock?

A Concho River crossing can be considered for a bore, subject to route conditions and planning. The river runs 1.43 channel miles through Paint Rock, so the plan needs to account for the channel and the banks. We also check whether the crossing falls under U.S. Army Corps of Engineers jurisdiction.

Who owns electric lines in Paint Rock and Concho County?

AEP Texas North, Oncor Electric Delivery Company, Concho Valley Electric Cooperative and Southwest Texas Electric Cooperative report electric service in Concho County. That does not establish the provider for every Paint Rock address. We confirm the line owner and conduit specifications for the specific route before planning a conduit bore near FM 380.

Who controls Bates Street in Paint Rock, and does a bore require cutting it?

Paint Rock is incorporated, so Bates Street is a city street. Directional boring may pass beneath its pavement without an open cut, with pits placed where the site allows. The route still needs to account for marked utilities and the 0.63 mile street’s connection to the surrounding road layout.

Could older buried lines near Moss Street affect a replacement bore in Paint Rock?

They could. The American Community Survey 2019 to 2023 estimates put Paint Rock’s median housing year at 1949, with 54 percent of housing units built before 1960. A replacement route near Moss Street may meet older services, so we expose marked lines by hydrovac potholing before drilling close to them.

Do Paint Rock bore pits near the Concho River have groundwater or flooding concerns?

The USDA soil survey maps flood prone soils across 26 percent of Paint Rock, so a Concho River route deserves attention when choosing pit locations and bore depth. Seasonal water tables within 60 inches are not mapped. The survey is a planning guide, not a site test, so actual ground conditions still matter.

How much notice does Texas811 need for a bore on Roberts Avenue in Paint Rock?

For work near Roberts Avenue, request the Texas811 locate at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before it. If a start near FM 380 moves more than 14 days past the original notice, we submit a new request to TxDOT San Angelo District. Before work continues near Concho River, we have worn or moved marks refreshed through Texas811.

How far is Paint Rock from the Yukon office, and does San Angelo help with mobilization?

Paint Rock is 366 road miles and a 7.2 hour drive from our Yukon yard. San Angelo is 31.3 miles west and is the nearest larger city, but our main office remains in Yukon. The distance from Yukon can affect mobilization for work near the Concho River or US 83.

What affects the cost of a directional bore near US 83 in Paint Rock?

The route, pipe size and footage matter, along with soil and rock, utility crossings, pavement, pits and equipment time. A bore near US 83 may also need highway permit planning, while the Concho River adds a crossing condition to assess. The 366 road miles from Yukon can affect mobilization. We need the job details to assess the scope.

Where the Paint Rock facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Paint Rock

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Paint Rock, Texas

Type the address of your job in Paint Rock. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Paint Rock

All counties: Texas county list.