trinityboringsolutions.com

Kempner Texas Directional Boring: Brackett Soil, BNSF Railway and Taylor Creek

Quick Answer: On a route near the BNSF Railway, Trinity Boring Solutions handles directional boring, also called horizontal directional drilling (HDD), in Kempner and across Texas. The Yukon, Oklahoma main office is 375 road miles away, so a bore near Business 190 needs mobilization planned around that trip. Brackett soil covers much of Kempner, and the survey maps bedrock shallow in many areas. We plan the bore path and tooling for those ground conditions.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Kempner bores at a glance

  • Incorporated city in Lampasas County, Texas. Population 1,283 (Census Bureau 2024 estimate).
  • Road distance from our Yukon, Oklahoma main office: 375 miles, about 7.2 hours of driving.
  • Ground: Brackett soil is mapped on 68 percent of the area, with bedrock about 40 inches down.
  • Rock: bedrock is mapped within 60 inches on 88 percent of the area.
  • Highways inside the boundary: FM 2808. State permit office: TxDOT Brownwood District.
  • Railroad track inside the boundary: BNSF Railway, with 1 mapped street and rail crossings.
  • Named streams inside the boundary: Taylor Creek.
  • Public water: Kempner Water Supply Corporation, surface water.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who does directional boring near Business 190 in Kempner?

Kempner is in Lampasas County, where the Census Bureau Vintage 2024 estimate puts the population at 1,283. Along Business 190, Forsythe Loop or Apache Street, our crews can bore water, sewer, gas, electric conduit and fiber routes without opening the full length of the street. The route and existing lines determine the entry and exit pits.

Our main office is in Yukon, Oklahoma, and Kempner work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. We are a family business that began in 1965 and has done directional boring since 1982. Our record of no utility strike in over 25 years matters where a new route meets Kempner Water Supply Corporation lines.

Trinity Boring Solutions directional boring crew, drill rig and hydrovac trailer staged along an airport service road at Will Rogers World Airport in Oklahoma City
Our boring crew, drill and hydrovac trailer staged along a service road at Will Rogers World Airport in Oklahoma City. Photos on this page are from our jobs in Oklahoma and Texas.

What does the Brackett soil survey show in Kempner?

The USDA soil survey maps Brackett soil across 68 percent of Kempner, including Brackett gravelly clay loam on 59 percent of the area. Gravelly clay loam is the leading surface texture, mapped on 62 percent. About 40 inches down, bedrock is mapped on 88 percent of the area; gravelly clay loam accounts for 9 percent there, and the average clay content is 33 percent. These are mapped soil patterns, not test borings, so the proposed route still needs site specific planning.

USDA soil survey, inside the Kempner city limitsWhat is mapped
Soil series mappedBrackett 68 percent, Lampasas 15 percent, Rumley 9 percent and Real 3 percent
Texture at the surfacegravelly clay loam 62 percent, gravelly clay 15 percent and silty clay loam 11 percent
Texture about 40 inches downbedrock 88 percent and gravelly clay loam 9 percent
Engineering class about 40 inches downlean clay (CL) 11 percent
Average clay content about 40 inches down33 percent
Bedrock mapped within 60 inches88 percent of the area (17 percent hard rock, 71 percent weathered rock)
Seasonal water table within 60 inches0 percent of the area
Flood prone soils0 percent of the area
High corrosion risk for uncoated steel26 percent of the area

The survey puts typical bedrock depth at 16 inches, with weathered bedrock mapped within 60 inches on 71 percent of the area and hard bedrock on 17 percent. That can change bit choice and steering at a soil to rock contact. We plan boring depths in Kempner with care because seasonal water table and flood prone soils are not mapped. High steel corrosion risk covers 26 percent, so the line owner should consider casing and tracer wire materials. The map also identifies Quartz sand decomposition residuum of Cenozoic age and Paluxy sand and Glen Rose limestone, undivided, of Early Cretaceous age.

How do we bore Kempner ground with shallow bedrock?

Brackett gravelly clay loam and shallow mapped bedrock call for a route plan that can account for changing resistance. Near Apache Street or Business 190, we expose marked lines before the drill approaches them.

  1. On Brackett gravelly clay loam, we choose the reaming plan for the ground and keep the pipe ready so the open hole is not left waiting.
  2. With bedrock mapped at a typical depth of 16 inches, we check depth and pitch as the drill advances and adjust for changing resistance.
  3. Before approaching marked lines near Business 190, we use hydrovac potholing to verify their depth; locate paint alone does not show it.
  4. At Taylor Creek, we plan the bore to pass below the channel and check jurisdiction during planning before setting the route.
Vermeer D24x40 S3 Navigator and water truck at the entry of a 385 foot sandstone rock bore above the wetland in Guthrie, Oklahoma
Our Vermeer D24x40 and water truck at the entry of a 385 foot sandstone rock bore in Guthrie, Oklahoma.

What might a bore cross in Kempner near BNSF Railway?

FM 2808 is the state highway mapped inside Kempner, with 1.0 roadway mile in the city. Business 190 is the longest named street at 2.35 miles, followed by Forsythe Loop at 1.98 miles and Apache Street at 1.1 miles. A bore route on any of these roads needs to account for pavement, driveways and buried lines. Keeping the drill path below the surface can avoid cutting across the route, subject to the line owner’s plan and any required approvals.

CrossingTypeMapped extentWho has a say
FM 2808State highway1 roadway miles insideState highway office
BNSF RailwayRailroad0.45 track miles insideThe railroad
Taylor CreekStream0.25 channel miles insideChecked for Corps of Engineers jurisdiction
Lampasas RiverStream nearby0.2 miles outsideChecked for Corps of Engineers jurisdiction
Binion CreekStream nearby0.5 miles outsideChecked for Corps of Engineers jurisdiction
Mesquite CreekStream nearby0.5 miles outsideChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

The BNSF Railway Lampasas Subdivision has 0.45 track miles in Kempner, and the mapped inventory records one street and rail crossing. A crossing of BNSF Railway track needs an agreement from the railroad owner. Taylor Creek has 0.25 channel miles in the city, with one mapped street crossing of a named stream. The Lampasas River is 0.2 miles from the city limits; creek or river work needs a jurisdiction check during planning.

Who approves a Kempner bore in Lampasas County?

Kempner is incorporated, so its city streets, including Business 190 and Apache Street, belong to the city. FM 2808 is a state highway, and the line owner, not the driller, applies for a TxDOT utility permit through RULIS. The TxDOT Brownwood District reviews the filing; we prepare the bore plan and profile for the utility owner to submit. For a line crossing FM 2808, TxDOT rules set cover at 60 inches below the lowest crossed grade for electric and communication lines and 60 inches for water. A BNSF Railway track crossing needs the railroad’s agreement. Taylor Creek crossings are checked for federal jurisdiction during planning.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Which utilities serve Kempner near Kempner Water Supply Corporation?

Kempner Water Supply Corporation is the public water system listed for Kempner. It uses surface water and reports 5,909 service connections serving 17,721 people. On a route near Forsythe Loop, that network is one reason to locate and expose marked lines before drilling. Oncor Electric Delivery Company, Hamilton County Electric Cooperative Association and Pedernales Electric Cooperative report electric service in Lampasas County; confirm the line owner for the address before planning a conduit bore.

Line ownerWhat it isSourceSize
Kempner Water Supply CorporationPublic water systemSurface water5,909 connections, 17,721 people served
Oncor Electric Delivery Company, Hamilton County Electric Cooperative Association and Pedernales Electric CooperativeElectric utilities reporting service in Lampasas CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

The American Community Survey 2019 to 2023 five year estimates put Kempner’s median housing year at 1991; 9 percent of homes were built before 1960, 62 percent from 1960 to 1999 and 29 percent in 2000 or later. On Apache Street or Forsythe Loop, those ages help frame whether a project is a replacement or a new service, but they do not identify a pipe’s age. We hydrovac pothole marked utilities on the path before drilling near them, because surface marks show position, not depth.

Large HDPE conduit reels staged on a Rotate A Reel trailer for a fiber and utility installation in Oklahoma
HDPE conduit reels on a reel trailer for a fiber and utility installation in Oklahoma.

What is near Kempner, including Copperas Cove?

Kempner sits in Lampasas County at an elevation of 1,021 feet and covers 2.05 square miles. Kempner’s ZIP codes are 76539 and 76522, which we use to identify the area when coordinating boring work. Copperas Cove is 4.6 miles northeast and is the nearest larger city; Fort Hood is 11.9 miles east, and Lampasas, the county seat, is 12.5 miles west. From our Yukon, Oklahoma main office, the drive to Kempner is 375 road miles and 7.2 hours. Those distances matter when planning a crew and equipment mobilization for work along FM 2808.

Places near Kempner

What kinds of bores come up near Taylor Creek in Kempner?

  • Water service: A connection near Kempner Water Supply Corporation lines may need a route along Forsythe Loop that avoids existing services.
  • Highway crossing: A line crossing FM 2808 needs a bore plan that accounts for the state highway and its pavement.
  • Rail crossing: A route beneath BNSF Railway track needs the railroad owner’s agreement and crossing conditions built into the plan.
  • Creek crossing: A bore at Taylor Creek can keep the channel bank and surface intact while its jurisdiction is checked during planning.
  • Street replacement: A replacement route along Apache Street can pass below pavement while marked utilities are exposed along the bore path.
  • Fiber conduit: A conduit route near Business 190 needs its size, length and utility crossings accounted for before drilling.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

What do you need to quote a Kempner bore near FM 2808?

For a quote, send the address or map pin, what is going in the ground, the pipe or conduit size and footage; a sketch or plans help. A route near FM 2808 or Taylor Creek also needs its crossing details, since pavement and waterway conditions affect how we plan the bore.

Kempner is 375 road miles from Yukon, so mobilization is part of the job. Brackett soil and shallow mapped bedrock can affect tooling and drilling time; a BNSF Railway crossing, FM 2808 pavement or Taylor Creek can add crossing requirements. Price also reflects the bore length and size, utilities to expose, pits, excavator time, sand backfill, concrete or pavement, and whether the work is high profile or an emergency.

Questions people ask about boring in Kempner

Does Trinity Boring Solutions take directional boring jobs in Lampasas County near Kempner?

Yes. Our directional boring work can be planned for Kempner routes as well as projects across Texas. Our own crews and partner drilling contractors Trinity has vetted handle the work, while you work with Trinity through the job and bore log. For a route near Business 190, the crew plan depends on the site and scope.

For our boring plans in Kempner, who runs its public water system, and where does its water come from?

Kempner Water Supply Corporation is the public water system listed for the city, and its source is surface water. We account for Kempner’s public water system scale in underground planning: public records list 5,909 service connections and 17,721 people served. A proposed bore near Forsythe Loop still needs the existing water lines located along its route.

Which electric companies report service in Lampasas County near Kempner?

Oncor Electric Delivery Company, Hamilton County Electric Cooperative Association and Pedernales Electric Cooperative report electric service in Lampasas County. That county list does not identify the provider at every Kempner address. Before an electric conduit bore near Apache Street, confirm the line owner and conduit specifications for the route.

Does Kempner require cutting Apache Street for a bore?

Not necessarily. A directional bore can pass beneath Apache Street rather than opening the full roadway, subject to the route and approvals. We treat Kempner’s incorporated city streets as city streets when planning boring work and checking ownership. Marked utilities along the proposed path need to be exposed before drilling near them.

How do housing ages near Forsythe Loop affect a Kempner replacement bore?

The American Community Survey estimates Kempner’s median housing year at 1991, with 9 percent of homes built before 1960. That gives context for possible replacement work, but does not establish the age of any buried line near Forsythe Loop. We locate and pothole marked utilities before the drill approaches them.

Does Brackett soil in Kempner corrode steel, and what pipe should I use?

The USDA soil survey maps high steel corrosion risk on 26 percent of Kempner’s area, and Brackett soil is widespread. The line owner should consider casing and tracer wire materials for the specific route. HDPE is not affected by soil corrosion, but the owner selects the pipe and any steel coatings.

What bore sizes and lengths can Trinity handle near Armadillo Lane in Kempner?

We handle 3/4 inch service lines up to 48 inch casing and bore lengths from 10 feet to 5,000 feet. The suitable setup for Armadillo Lane depends on what the line carries, the ground and the route’s utility crossings. A sketch helps us assess those details.

How much notice does Texas811 need for a Kempner bore near Business 190?

Count back at least 48 hours from the planned start, excluding Saturdays, Sundays and legal holidays; the request cannot be made earlier than 14 days ahead. If a Business 190 start slips more than 14 days past the original notice, make a new request. Before boring work continues on Kempner routes, we refresh worn or moved marks through Texas811.

What affects the cost of a directional bore near FM 2808 in Kempner?

The job details determine the price. Mobilization starts with the 375 road miles from Yukon; Brackett soil and shallow mapped bedrock can affect drilling, while FM 2808 pavement or a BNSF Railway crossing changes the route plan. Length, pipe size, utility exposure, pits, excavator time and backfill also matter.

Where the Kempner facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Kempner

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Kempner, Texas

Type the address of your job in Kempner. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Kempner

Same county: Lometa. All counties: Texas county list.