trinityboringsolutions.com

Lorena Texas Directional Boring: Stephen Soil, Interstate 35 and North Cow Bayou

Quick Answer: Can you get a line beneath Interstate 35, Union Pacific track or North Cow Bayou without cutting it? Yes: we use directional boring, also called horizontal directional drilling (HDD), for Lorena crossings like these. From our Yukon, Oklahoma main office, Lorena is 313 road miles away, a factor when planning work near Hewitt. The USDA soil survey maps Stephen soil across 34 percent of the city, with bedrock typically 26 inches down. That shallow, weathered bedrock can slow drilling compared with dirt.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Lorena bores at a glance

  • Incorporated city in McLennan County, Texas. Population 1,794 (Census Bureau 2024 estimate).
  • Road distance from our Yukon, Oklahoma main office: 313 miles, about 6 hours of driving.
  • Ground: Stephen soil is mapped on 34 percent of the area, with bedrock about 40 inches down.
  • Rock: bedrock is mapped within 60 inches on 87 percent of the area.
  • Highways inside the boundary: Interstate 35 and FM 2837. State permit office: TxDOT Waco District.
  • Railroad track inside the boundary: Union Pacific, with 2 mapped street and rail crossings.
  • Named streams inside the boundary: North Cow Bayou.
  • Public water: City of Lorena, surface water bought from another system.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who does directional boring in Lorena, McLennan County?

Trinity Boring Solutions takes directional boring work in Lorena, McLennan County, where the Census Bureau Vintage 2024 estimate puts the population at 1,794. Can you get a line beneath Birdie Lane or FM 2837 without cutting the surface? We install water, sewer, gas, electric conduit and fiber, with the bore route planned for the particular street or crossing.

Our main office is in Yukon, Oklahoma, and Lorena work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our longest bore is roughly 4,100 feet of 48 inch pipe beneath the Arkansas River in Tulsa. A typical Lorena job is much shorter, with its route shaped by Stephen soil, local crossings and the line being installed. We have done directional boring since 1982.

Trinity Boring Solutions Vermeer D24x40 directional drill set up for a bore
Our Vermeer D24x40 directional drill set up for a bore. Photos on this page are from our jobs in Oklahoma and Texas.

What is Lorena soil like to bore through, including Stephen soil?

The USDA soil survey maps Stephen soil across 34 percent of Lorena, with Austin and Fairlie soils also covering substantial areas. At about 40 inches below the surface, the mapped texture is bedrock across 64 percent of the city, while clay accounts for 27 percent and silty clay for 8 percent. The mapped clay content at that depth averages 49 percent. These are survey patterns, not test borings, so the route still needs to be planned for the conditions found along it.

USDA soil survey, inside the Lorena city limitsWhat is mapped
Soil series mappedStephen 34 percent, Austin 25 percent, Fairlie 23 percent, Ovan 6 percent and Eddy 4 percent
Texture at the surfacesilty clay 67 percent, clay 27 percent and gravelly clay loam 4 percent
Texture about 40 inches downbedrock 64 percent, clay 27 percent and silty clay 8 percent
Engineering class about 40 inches downfat clay (CH) 35 percent
Average clay content about 40 inches down49 percent
Bedrock mapped within 60 inches87 percent of the area (0 percent hard rock, 87 percent weathered rock)
Seasonal water table within 60 inches0 percent of the area
Flood prone soils6 percent of the area
High corrosion risk for uncoated steel94 percent of the area

Lorena’s USDA soil survey puts typical bedrock depth at 26 inches and maps weathered bedrock within 60 inches across 87 percent of the city. The geologic map unit is Austin Chalk, Late Cretaceous, so chalk may slow a bore compared with dirt. No seasonal water table is mapped within 60 inches, while flood prone soils cover 6 percent. High steel corrosion risk covers 94 percent, a reason for the line owner to consider casing and tracer wire materials; HDPE is not affected by that soil concern.

What does it take to bore Lorena ground with shallow bedrock?

Lorena’s mapped clay and shallow, weathered bedrock call for a bore plan that accounts for sticky cuttings and slower drilling. We track the drill head from the surface and log its depth and pitch as it advances.

  1. Stephen soil and Lorena’s mapped clay can make cuttings sticky, so we manage drilling fluid and ream in stages to keep the hole workable.
  2. With weathered bedrock mapped within 60 inches across much of Lorena, we allow for slower drilling through chalk and watch the soil to rock transition.
  3. On a route near North Cow Bayou, we plan depth around the channel and check the crossing for U.S. Army Corps of Engineers jurisdiction.
  4. Before the drill approaches any marked utility on a Lorena bore path, we expose it with hydrovac potholing; the locator marks its position, not its depth.
Trinity Boring Solutions crew in hard hats at the exit pit with rock tooling on a sandstone bore in Guthrie, OK
Our crew at the exit pit with rock tooling on a sandstone bore in Guthrie, Oklahoma.

What is in the way of a new line in Lorena near Interstate 35?

Interstate 35 and FM 2837 are the two highways mapped inside Lorena, so a route beneath either one needs to account for highway right of way. Old Temple Road is the longest named street at 4.75 miles within the city; Old Lorena Road runs 1.83 miles, and Birdie Lane runs 1.43 miles. A bore can pass beneath pavement without cutting it, but the entry and exit pits still need suitable locations along the chosen route.

CrossingTypeMapped extentWho has a say
Interstate 35Interstate8.9 roadway miles insideState highway office
FM 2837State highway3.2 roadway miles insideState highway office
Union PacificRailroad1.67 track miles insideThe railroad
North Cow BayouStream1.1 channel miles insideChecked for Corps of Engineers jurisdiction
Bull Hide CreekStream nearby0.4 miles outsideChecked for Corps of Engineers jurisdiction
Cottonwood CreekStream nearby0.5 miles outsideChecked for Corps of Engineers jurisdiction
South Fork Cow BayouStream nearby0.9 miles outsideChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

Union Pacific owns 1.67 track miles inside Lorena on its Waco Subdivision, and public mapping shows 2 street and rail crossings in the city. A crossing beneath the track needs the railroad’s agreement. North Cow Bayou runs 1.1 channel miles inside Lorena, with 2 mapped street crossings of named streams. No lakes or ponds are mapped within one mile. A creek route is checked for federal waterway jurisdiction during planning.

Who approves a Lorena bore near Union Pacific or Interstate 35?

For electric or communication lines crossing Interstate 35, TxDOT rules set 60 inches of cover below the lowest point of the crossed grade; a line running along the right of way needs 48 inches. Water lines need 60 inches at crossings and 36 inches along the right of way, while pressurized sewer crossings need 60 inches. The utility owner applies through TxDOT’s online RULIS system, and the TxDOT Waco District reviews it. We prepare the bore plan and profile for the owner’s application. A Union Pacific track crossing needs an agreement from the railroad, and a North Cow Bayou route is checked for U.S. Army Corps of Engineers jurisdiction.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

What is already in the ground in Lorena near the City of Lorena system?

The City of Lorena public water system uses purchased surface water and serves 1,776 people through 1,013 service connections. For electric conduit near Birdie Lane or another Lorena route, county records list Oncor Electric Delivery Company, Texas-New Mexico Power, HILCO Electric Cooperative, Heart of Texas Electric Cooperative and Navasota Valley Electric Cooperative as reporting service in McLennan County. The line owner for the specific route must be identified before conduit planning.

Line ownerWhat it isSourceSize
City of LorenaPublic water systemSurface water bought from another system1,013 connections, 1,776 people served
Oncor Electric Delivery Company, Texas-New Mexico Power, HILCO Electric Cooperative, Heart of Texas Electric Cooperative and Navasota Valley Electric CooperativeElectric utilities reporting service in McLennan CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

The American Community Survey 2019 to 2023 five year estimates put Lorena’s median housing year at 1983; 16 percent of units were built before 1960, 68 percent from 1960 to 1999 and 16 percent in 2000 or later. Work along Old Lorena Road could involve replacing older lines or extending a newer service. Before drilling near any marked utility, we hydrovac pothole it because paint shows its position, not its depth.

Exposed underground utility line in a hand dug potholing pit before a directional bore in Oklahoma
An existing utility line exposed in a pothole before a directional bore in Oklahoma.

How far is Lorena from Hewitt and our Yukon yard?

Lorena is an incorporated city in McLennan County, at an elevation of 605 feet and covering 3.85 square miles. Its ZIP code is 76655. Hewitt is 4.8 miles north and is the nearest larger place; Bruceville-Eddy is 5.9 miles southwest, and Robinson is 7.0 miles northeast. Waco, the county seat, is 12.1 miles north. From our Yukon, Oklahoma main office, the road distance is 313 miles and the drive is 6.0 hours, which affects planning for work near Interstate 35.

Places near Lorena

What kinds of bores come up in Lorena near Birdie Lane?

  • Highway crossing: A bore beneath Interstate 35 avoids cutting the pavement, with the route and cover planned for the highway right of way.
  • Street service: A water or sewer line beneath Birdie Lane can cross the street without an open cut through its pavement.
  • Rail crossing: A proposed line beneath Union Pacific track needs a railroad agreement that sets crossing conditions.
  • Creek crossing: A bore beneath North Cow Bayou is planned around the channel and checked for federal jurisdiction.
  • Utility conduit: Electric conduit near Old Lorena Road needs the line owner confirmed and marked utilities exposed before drilling nearby.
  • Fiber route: Fiber beneath Houston Street can be planned around pavement and any marked lines on the selected path.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

What do you need to quote a bore in Lorena near Houston Street?

A map pin matters near Houston Street because the exact route can change which pavement, utilities or other crossings a bore must avoid. Send the job address or pin, what is going in the ground, pipe or conduit size, and footage. A sketch or plans help us assess the route beneath Houston Street or another Lorena feature.

Ground conditions are one price group: Stephen soil, clay and mapped shallow Austin Chalk can change drilling time and the work plan. Crossings are another: Interstate 35, Union Pacific track, North Cow Bayou, pavement and marked utilities affect the route and exposure work. Logistics include pit access, excavator time, backfill and the 313 road miles from Yukon. We review the actual scope rather than treating footage as the only factor.

Questions people ask about boring in Lorena

Does Trinity Boring Solutions take directional boring jobs in McLennan County near Lorena?

Yes, we take directional boring work in Lorena and across Texas. Our own crews and satellite yards run by vetted drilling contractor partners support the work, while you coordinate with Trinity from the first call through the bore log. For a route near Birdie Lane, the actual crew location depends on the job.

What does a bore beneath Union Pacific track in Lorena require?

A Lorena bore beneath Union Pacific track needs an agreement from the railroad that owns the Waco Subdivision. The agreement establishes crossing conditions such as casing, depth and flagging. If the route also uses highway right of way near Interstate 35, TxDOT needs a copy of the railroad agreement.

Can you bore a line under North Cow Bayou in Lorena?

A bore beneath North Cow Bayou can be planned without cutting the channel banks. The route needs to account for the bayou’s 1.1 channel miles inside Lorena, and the crossing is checked for U.S. Army Corps of Engineers jurisdiction during planning.

Who runs Lorena’s public water system, and where does its water come from?

The City of Lorena owns the public water system, which uses purchased surface water. Public records list 1,013 service connections serving 1,776 people. A proposed water line near Old Temple Road still needs its route and existing utilities checked.

Which electric providers report service in McLennan County near Lorena?

Oncor Electric Delivery Company, Texas-New Mexico Power, HILCO Electric Cooperative, Heart of Texas Electric Cooperative and Navasota Valley Electric Cooperative report electric service in McLennan County. Those records do not assign a provider to every Lorena address, so the line owner must be confirmed before planning a conduit bore near FM 2837.

Does the city or county control Birdie Lane in Lorena, and must it be cut?

Lorena is incorporated, so Birdie Lane is a city street. A directional bore can pass below the street without an open cut through the pavement. We plan entry and exit pits and expose marked utilities before the drill approaches them.

Does Trinity cover Hewitt and rural sites outside Lorena?

Yes, we take work in Hewitt and at rural sites beyond Lorena’s limits, as well as across Texas. Hewitt is 4.8 miles north of Lorena, and the scope and travel logistics for a route near the city can be reviewed from its map pin.

How much notice does Texas811 need for a Lorena bore near Old Temple Road?

For a bore near Old Temple Road, Texas811 needs a locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays. The request cannot be made more than 14 days before work starts. If the start slips more than 14 days past the original notice, make a new request; have worn or moved marks refreshed before continuing.

What affects the cost of directional boring in Lorena near Interstate 35?

The job’s length and pipe size matter, as do the ground, crossings and logistics. Stephen soil and shallow mapped Austin Chalk can affect drilling; Interstate 35, Union Pacific track or pavement can add crossing work. Access for pits, hydrovac exposure, excavator time and the 313 road miles from Yukon also shape the scope.

Where the Lorena facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Lorena

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Lorena, Texas

Type the address of your job in Lorena. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Lorena

Same county: Waco · Bellmead · Lacy-Lakeview · McGregor · West · Beverly Hills · Mart · Moody · China Spring · Gholson · Riesel · Crawford. All counties: Texas county list.