trinityboringsolutions.com

Pine Harbor Texas Directional Boring: Tenaha Loamy Fine Sand, Big Cypress Creek, FM 729

Quick Answer: Big Cypress Creek touches Pine Harbor’s mapped boundary, and Trinity Boring Solutions takes directional boring, also called horizontal directional drilling (HDD), work here. The Yukon, Oklahoma main office is 331 road miles away, so a route near FM 729 helps us assess mobilization. USDA soil maps show Tenaha loamy fine sand across 23 percent of the mapped community. Sand can fall in behind the drill, so staged reaming and drilling fluid help keep the hole open. A map pin on Holiday Harbor Drive helps place the route.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Pine Harbor bores at a glance

  • Unincorporated community in Marion County, Texas. Population 785 (2020 Census count).
  • Road distance from our Yukon, Oklahoma main office: 331 miles, about 6.9 hours of driving.
  • Ground: Tenaha soil is mapped on 23 percent of the area, with sandy clay loam about 40 inches down.
  • Rock: no bedrock is mapped in the top 60 inches.
  • Highways inside the boundary: FM 729 and FM 726. State permit office: TxDOT Atlanta District.
  • Railroad track inside the boundary: none mapped.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who does directional boring on Holiday Harbor Drive in Pine Harbor?

We take directional boring work in Pine Harbor, including routes near Holiday Harbor Drive and other local streets. Big Cypress Creek runs along or touches the mapped community boundary, so a route toward the creek needs its own crossing plan. The Census Bureau counted 785 people here in 2020; it does not publish yearly estimates for this unincorporated place. We install water, sewer, gas, electric conduit and fiber where those lines are needed along Pine Harbor roads.

Our main office is in Yukon, Oklahoma, and Pine Harbor work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our family company started in 1965, and we have done directional boring since 1982. More than four decades of boring helps us plan for the sandy surface soils and the finer material mapped below Pine Harbor streets.

Aerial view of a bore pit with drill rig and conduit alongside a directional drill rig and conduit on a concrete lot
Our crew at a bore pit beside the directional drill on a conduit job, seen from above. Photos on this page are from our jobs in Oklahoma and Texas.

What ground does Pine Harbor’s Tenaha soil present for a bore?

The USDA soil survey maps Tenaha loamy fine sand across 23 percent of Pine Harbor and Lilbert loamy fine sand across another 17 percent. At about 40 inches below the surface, sandy clay loam is mapped across 56 percent of the area, while the average clay content at that depth is 23 percent. We use mapped Tenaha and Lilbert soil patterns in Pine Harbor for planning, not as test borings. Sand can cut easily but fall in behind the bit, while the finer, clay bearing layer may hold the hole more firmly and cling to a reamer.

USDA soil survey, inside the Pine Harbor mapped community boundaryWhat is mapped
Soil series mappedTenaha 23 percent, Lilbert 17 percent, Bowie 10 percent, Darco 9 percent and Briley 5 percent
Texture at the surfaceloamy fine sand 54 percent and fine sandy loam 15 percent
Texture about 40 inches downsandy clay loam 56 percent and loamy fine sand 9 percent
Engineering class about 40 inches downlean clay (CL) 32 percent, clayey sand (SC) 24 percent and silty clayey sand (SC SM) 12 percent
Average clay content about 40 inches down23 percent
Bedrock mapped within 60 inchesNone mapped
Seasonal water table within 60 inches12 percent of the area
Flood prone soils2 percent of the area
High corrosion risk for uncoated steel11 percent of the area

The mapped geology is Queen City Sand, an Eocene unit of sand and clay; bedrock is not mapped in the top five feet. The USDA soil survey maps a seasonal water table within 60 inches across 12 percent of Pine Harbor, so some pits may need pumping. Flood prone soils cover 2 percent of the mapped area near the Big Cypress Creek boundary. High steel corrosion risk covers 11 percent, so the line owner should consider casing and tracer wire materials. The mapped steel concern also makes material selection worth checking before a route is set.

What does it take to bore Pine Harbor’s sandy clay loam?

Pine Harbor’s mapped sandy clay loam and loamy fine sand call for a plan that keeps the hole stable without washing out the route. We check the ground and marked utilities before choosing the bore path.

  1. We review the Tenaha and Lilbert soil map first, then check the actual route because mapped loamy fine sand may cave behind the bit.
  2. We hydrovac pothole each marked utility on the bore path before drilling near it; on Holiday Harbor Drive, locate paint alone does not show depth.
  3. We use staged reaming and drilling fluid to support sandy ground, then have the pipe ready before opening the final hole near Pine Harbor streets.
  4. We track the drill head from the surface and log depth and pitch, with a route plan that accounts for the Big Cypress Creek boundary.
Drilling fluid returns at the entry as the Vermeer D24x40 S3 drills a 385 foot sandstone rock bore in Guthrie, Oklahoma
Drilling fluid coming back to the entry pit as our Vermeer D24x40 drills a 385 foot bore in Guthrie, Oklahoma.

Which roads and waterways can a Pine Harbor bore cross near Big Cypress Creek?

FM 729 and FM 726 are the state highways mapped inside Pine Harbor, with 2.6 roadway miles of FM 729 and 1.1 of FM 726. Holiday Harbor Drive is the longest named street at 0.98 miles; Lakeside Drive measures 0.96 miles, and Cortez Road measures 0.93 miles. Those routes may put a bore near pavement, driveways or existing utilities. A planned crossing under a road can leave the surface uncut, with entry and exit pits placed in the dirt beside the route.

CrossingTypeMapped extentWho has a say
FM 729State highway2.6 roadway miles insideState highway office
FM 726State highway1.1 roadway miles insideState highway office
Big Cypress CreekStream nearbyAlong the boundaryChecked for Corps of Engineers jurisdiction
Hurricane CreekStream nearby0.8 miles outsideChecked for Corps of Engineers jurisdiction
Lake O the PinesLake or pond15,347 acres, insideChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

No railroad is mapped inside Pine Harbor or within 1 mile outside its boundary, so no local track route is identified here. Big Cypress Creek runs along or touches the mapped community boundary, while Hurricane Creek is 0.8 miles away. Lake O the Pines lies inside the boundary. No street crossings of named streams are mapped inside the community. A proposed creek or lake crossing still needs a route review, including a check for U.S. Army Corps of Engineers jurisdiction.

Who approves Pine Harbor bore work in Marion County?

Pine Harbor is an unincorporated community with no city government, so its streets are not under a city street department. Marion County or the state has authority according to the road. For work in the right of way of FM 729 or FM 726, the utility owner applies for a TxDOT utility permit through RULIS; the TxDOT Atlanta District reviews it. We prepare the bore plan and profile and work under the utility owner’s permit. A creek crossing near Big Cypress Creek is checked during planning for federal jurisdiction. No railroad is mapped nearby, but a proposed track crossing would need an agreement with its owner.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Which utilities serve Pine Harbor in Marion County?

The water provider for an address on Lakeside Drive or elsewhere in Pine Harbor has to be confirmed with the county or local water district before a bore is planned. Public records do not let us match a water system to a specific address here. Southwestern Electric Power and Upshur Rural Electric Cooperative report electric service in Marion County; that does not establish which company owns the line at every Pine Harbor property. We confirm the electric line owner before planning a conduit bore.

Line ownerWhat it isSourceSize
Southwestern Electric Power and Upshur Rural Electric CooperativeElectric utilities reporting service in Marion CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

The American Community Survey 2019 to 2023 five year estimates put Pine Harbor’s median housing year at 1996; 63 percent of housing was built from 1960 to 1999 and 37 percent in 2000 or later. A replacement line near Lakeside Drive may follow older buried infrastructure, while a newer property may need a service extension. We hydrovac pothole every marked utility along the bore path before drilling near it. For example, a conduit route under Lakeside Drive needs marked lines exposed first because paint shows position, not depth.

Trinity Boring Solutions crew running a 2 inch conduit directional bore with airport hangars and a parked jet in the background in Oklahoma City
Our crew running a 2 inch conduit bore near the hangars at an Oklahoma City airport.

What is near Pine Harbor and Jefferson?

Pine Harbor is in Marion County, with an elevation of 334 feet and a land area of 3.33 square miles. Its ZIP code is 75657. Jefferson, the county seat, is 8.7 miles east; Avinger is 9.4 miles north, Nesbitt 12.7 miles south, Ore City 12.9 miles west and Lone Star 17.0 miles northwest. Marshall, the nearest larger city, is 18.0 miles southeast. The Yukon, Oklahoma main office is 331 road miles away, a 6.9 hour drive, so distance is part of planning a Pine Harbor job.

Places near Pine Harbor

What boring work comes up on Holiday Harbor Drive in Pine Harbor?

  • Water service: A service bore near Holiday Harbor Drive can reach a property without opening the full street surface.
  • Highway crossing: A route beneath FM 729 needs a plan for the state right of way and the required utility permit.
  • Fiber conduit: A conduit bore along Lakeside Drive needs marked utilities exposed before the drill approaches the planned path.
  • Creek crossing: A proposed bore toward Big Cypress Creek needs a channel route plan and a jurisdiction check during planning.
  • Electric conduit: Near FM 726, confirm the line owner before choosing conduit size and laying out the bore.
  • Driveway bore: A crossing near Cortez Road can keep the driveway surface intact, with pits set in dirt on either side.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

What do you need to quote a Pine Harbor bore near FM 729?

Send the address or map pin first. A pin near FM 729 or Big Cypress Creek matters because the road edge and crossing location affect the route we can plan. For a FM 729 crossing in Pine Harbor, tell us what goes underground, plus the pipe or conduit size and footage. A sketch or plans help us check pits, access and nearby utilities before we scope the bore.

Price follows the work planned for Pine Harbor, not one measurement alone. Mobilization reflects the 331 road miles from Yukon. Tenaha loamy fine sand and the sandy clay loam mapped below it affect drilling and reaming choices. We also account for the pipe size and bore length, utilities to expose, pavement near FM 729, creek or drainage crossings, pits, excavator time and sand backfill. Emergency or high profile work can change the planning needs.

Questions people ask about boring in Pine Harbor

Does Trinity take directional boring jobs in Pine Harbor, Marion County, and how are crews assigned?

Yes, we take Pine Harbor work and keep the customer’s contact with Trinity from the first call through the bore log. Our own crews or crews from satellite yards run by drilling contractors we have vetted may handle the work. The plan is based on the specific route, such as a job near Holiday Harbor Drive.

Can you bore a line under Big Cypress Creek at Pine Harbor?

A bore under Big Cypress Creek can be considered after the route and channel conditions are reviewed. The creek touches or runs along Pine Harbor’s mapped boundary, and a creek crossing is checked during planning for U.S. Army Corps of Engineers jurisdiction. We need the proposed crossing location and line details to assess the route.

Who owns the electric lines in Pine Harbor, Marion County, and who confirms conduit specs?

The owner for a particular Pine Harbor address must be confirmed before we plan an electric conduit bore. Southwestern Electric Power and Upshur Rural Electric Cooperative report electric service in Marion County, but that does not identify the line owner at every property. The confirmed owner provides the applicable conduit requirements for a route near FM 729.

Who is responsible for Pine Harbor streets such as Cortez Road, and must a bore cut them?

Pine Harbor has no city government because it is an unincorporated community, so Marion County or the state is responsible according to the road. A directional bore can pass beneath Cortez Road without cutting the street surface, with pits set in the dirt on either side. Road right of way work follows the applicable authority’s process.

How old are buried lines near Lakeside Drive in Pine Harbor, and can a replacement use a bore?

A replacement line near Lakeside Drive may be bored if the route and site conditions allow. The American Community Survey 2019 to 2023 estimates give Pine Harbor a median housing year of 1996, with 63 percent of housing built from 1960 to 1999 and 37 percent from 2000 onward. Those figures describe housing age, not the age of buried utilities.

Could groundwater or flood prone ground affect bore pits near Big Cypress Creek in Pine Harbor?

It could affect some pit locations. The USDA soil survey maps a seasonal water table within 60 inches across 12 percent of Pine Harbor, and flood prone soils across 2 percent. Near Big Cypress Creek, we consider the route and pit placement before work; a wet pit may need pumping, and creek work gets a jurisdiction check during planning.

How much 811 notice is needed for a Pine Harbor bore on Holiday Harbor Drive, and what if marks move?

For a bore on Holiday Harbor Drive, place the Texas811 locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before it. For work in Marion County, we ask for a new request if the start slips more than 14 days past the original notice. Before boring continues on Holiday Harbor Drive in Pine Harbor, we ask that worn or moved marks be refreshed through Texas811.

How far is Pine Harbor from Trinity’s Yukon office, and does Marshall change the job plan?

At 331 road miles from our Yukon, Oklahoma main office, Pine Harbor requires us to plan mobilization around the 6.9 hour drive. Marshall is 18.0 miles southeast and is the nearest larger city, but the job route and access still set the plan. The distance from Yukon is considered when we prepare mobilization for work near FM 726.

What affects the cost of a directional bore near FM 729 in Pine Harbor?

The work scope determines the price for a bore near FM 729. Factors include bore length, pipe or conduit size, the Tenaha soil conditions, utilities that need exposure, pavement, creek crossings, pits and excavator time. The 331 road miles from Yukon shape how we schedule mobilization for directional boring in Pine Harbor. Plans showing the route and crossing details help us assess the job.

Where the Pine Harbor facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Pine Harbor

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Pine Harbor, Texas

Type the address of your job in Pine Harbor. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Pine Harbor

All counties: Texas county list.