Tilden Texas Directional Boring: Brundage Soil, Texas State Highway 16, Frio River

Quick Answer: At the Texas State Highway 16 crossing in Tilden, Trinity Boring Solutions does directional boring, also called horizontal directional drilling (HDD), for utility lines without cutting pavement. River Street adds another street crossing to plan around. Tilden is 561 road miles from our Yukon, Oklahoma main office, and Texas State Highway 72 is also inside the mapped community. Brundage fine sandy loam overlies sandy clay loam, so sticky clay can hold the hole and grip pipe during pullback.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Tilden bores at a glance

  • County seat of McMullen County, Texas. Population 190 (2020 Census count).
  • Road distance from our Yukon, Oklahoma main office: 561 miles, about 10.7 hours of driving.
  • Ground: Brundage soil is mapped on 61 percent of the area, with sandy clay loam about 40 inches down.
  • Rock: bedrock is mapped within 60 inches on 11 percent of the area.
  • Highways inside the boundary: Texas State Highway 16 and Texas State Highway 72. State permit office: TxDOT San Antonio District.
  • Railroad track inside the boundary: none mapped.
  • Named streams inside the boundary: Frio River.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who handles directional boring near Texas State Highway 16 in Tilden?

We take directional boring jobs in Tilden, McMullen County, for water, sewer, gas, electric conduit and fiber lines routed beneath streets such as River Street or toward Texas State Highway 16. The Census Bureau counted 190 residents in the 2020 Census; it does not publish yearly estimates for unincorporated places. With no city government in Tilden, the route and street authority need to be checked against the county or state road involved.

Our main office is in Yukon, Oklahoma, and Tilden work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Since 1982, four decades of boring have taught our crews to adjust the reaming plan for the Brundage sandy clay loam and clay mapped around Tilden; our family business began in 1965.

Trinity Boring Solutions Vermeer D24x40 directional drill set up for a bore
Our Vermeer D24x40 directional drill set up for a bore. Photos on this page are from our jobs in Oklahoma and Texas.

What does Brundage soil mean for boring in Tilden?

The USDA soil survey maps Brundage fine sandy loam, 0 to 2 percent slopes, across 61 percent of Tilden’s mapped area. Buchel clay, 0 to 1 percent slopes, frequently flooded, covers 26 percent, and Fashing clay, 1 to 5 percent slopes, covers 11 percent. At about 40 inches below the surface, the survey maps sandy clay loam across 61 percent and clay across 27 percent, with bedrock in 11 percent. These mapped patterns give a starting point for a River Street bore plan, not a test of the exact route.

USDA soil survey, inside the Tilden mapped community boundaryWhat is mapped
Soil series mappedBrundage 61 percent, Buchel 27 percent and Fashing 11 percent
Texture at the surfacefine sandy loam 61 percent and clay 39 percent
Texture about 40 inches downsandy clay loam 61 percent, clay 27 percent and bedrock 11 percent
Engineering class about 40 inches downlean clay (CL) 73 percent and fat clay (CH) 27 percent
Average clay content about 40 inches down38 percent
Bedrock mapped within 60 inches11 percent of the area (0 percent hard rock, 11 percent weathered rock)
Seasonal water table within 60 inches0 percent of the area
Flood prone soils27 percent of the area
High corrosion risk for uncoated steel100 percent of the area

The USDA soil survey puts typical bedrock depth at 16 inches and maps bedrock within 40 inches across 11 percent of Tilden. The Jackson Group, undivided, is Eocene and includes clay, sandstone, siltstone, shale and tuff, so weathered rock may slow a bore. Seasonal water table is not mapped within 60 inches, while flood prone soils cover 27 percent. High steel corrosion risk is mapped across 100 percent, and high concrete corrosion risk across 61 percent, so the line owner should consider casing and tracer wire materials.

How do crews bore Tilden’s sandy clay loam?

We tailor a Tilden bore to the USDA mapped sandy clay loam and clay, controlling fluid and reaming so the hole stays stable without pushing up pavement on Texas State Highway 16.

  1. In Brundage fine sandy loam, we use drilling fluid to support the open path, then ream in stages so loose material does not collapse behind the bit.
  2. At about 40 inches, Tilden’s mapped clay averages 38 percent clay; we use thinner fluid with polymer and watch returns to limit pressure beneath Texas State Highway 16.
  3. For a River Street route, we lay out the pipe before the final ream and pull it the same day, reducing the time sticky clay can grip the line.
  4. We hydrovac pothole marked utilities before drilling near Washington Street, then track the head with a walkover locator and log depth and pitch.
Trinity Boring Solutions water trailer supplying water for bentonite drilling fluid on a sleeve bore in northeast OKC
Our water trailer feeding the bentonite drilling fluid mix on a sleeve bore in northeast Oklahoma City.

Which crossings should a bore plan for near Texas State Highway 16 in Tilden?

Texas State Highway 16 and Texas State Highway 72 both run through Tilden, with 1.1 and 1.0 mapped roadway miles inside the community, respectively. River Street is the longest named street at 1.16 miles, followed by Congress Street at 0.73 miles and Washington Street at 0.41 miles. These streets give a bore route several possible pavement and driveway crossings. For work beneath existing highway pavement, TxDOT rules call for boring or tunneling, rather than open trenching through the road.

CrossingTypeMapped extentWho has a say
Texas State Highway 16State highway1.1 roadway miles insideState highway office
Texas State Highway 72State highway1 roadway miles insideState highway office
Frio RiverStream1.07 channel miles insideChecked for Corps of Engineers jurisdiction
Leoncita CreekStream nearbyAlong the boundaryChecked for Corps of Engineers jurisdiction
Big SloughStream nearby0.2 miles outsideChecked for Corps of Engineers jurisdiction
Salt BranchStream nearby0.7 miles outsideChecked for Corps of Engineers jurisdiction
Birds Nest SloughStream nearby0.9 miles outsideChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

The mapped community boundary has no railroad inside it or within one mile outside it, so no local track route appears in the records. The Frio River runs 1.07 channel miles in Tilden, and one mapped public street crossing intersects a named stream. That makes the river and its banks a route planning issue; a creek crossing is checked for U.S. Army Corps of Engineers jurisdiction during planning.

Who approves a bore in Tilden, McMullen County?

In Tilden, the county handles local street matters because this unincorporated community has no city government, while TxDOT handles work in the Texas State Highway 16 right of way. For electric and communication lines crossing the highway, the cover is at least 60 inches below the lowest point of the crossed grade; along the right of way it is 48 inches. Water crossings need 60 inches of cover, and water along the right of way needs 36 inches. Pressurized sewer crossings need 60 inches. The utility owner files the RULIS application, reviewed by the TxDOT San Antonio District, and we work under the permit issued to that owner. Highway crossings are encased and extend beneath all travel lanes on rural highways. A Frio River route also gets a jurisdiction check during planning.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Which utility owners should we check in Tilden, McMullen County?

The water provider for a specific River Street address in Tilden has to be confirmed with the county or local water district before a bore is planned. EPA drinking water records for Texas do not tie systems to towns, so the provider cannot be matched from those records. Utilities reporting electric service in McMullen County include AEP Texas Central, Karnes Electric Cooperative, Medina Electric Cooperative, Nueces Electric Cooperative and San Patricio Electric Cooperative. We confirm the line owner for the address before planning an electric conduit bore.

Line ownerWhat it isSourceSize
AEP Texas Central, Karnes Electric Cooperative, Medina Electric Cooperative, Nueces Electric Cooperative and San Patricio Electric CooperativeElectric utilities reporting service in McMullen CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

The American Community Survey 2019 to 2023 five year estimates put Tilden’s median housing year at 1961; 49 percent of housing was built before 1960, 25 percent from 1960 to 1999 and 26 percent in 2000 or later. Housing age does not establish the age of a buried line, but it can mean a Congress Street project is replacing older service rather than adding a new one. Before drilling near marked lines, we hydrovac pothole them to check their depth; paint alone shows position.

Mini excavator digging beside a pad mounted electrical transformer with red dirt spoil and a vacuum excavation trailer on site
Digging beside a pad mounted electric transformer with a vacuum excavation trailer on site.

Do you cover Tilden near Pleasanton?

Tilden is in McMullen County, where it is the county seat, and the mapped community sits at an elevation of 250 feet across 0.35 square miles. ZIP code 78072 serves the area. Fowlerton is 15.9 miles west, Three Rivers is 22.5 miles east, and Christine is 22.8 miles north. Pleasanton, the nearest larger city, is 35.0 miles north. Our Yukon yard is 561 road miles away, a 10.7 hour drive, so that distance can affect mobilization for a Tilden job.

Places near Tilden

Which projects call for a bore near the Frio River in Tilden?

  • Highway crossing: A bore beneath Texas State Highway 16 follows TxDOT cover and pavement requirements, with the utility owner’s permit setting the approved profile.
  • Street service: A water or sewer connection beneath River Street can avoid cutting its pavement, with the route planned around marked utilities and the mapped clay.
  • River crossing: A route beneath the 1.07 channel miles of the Frio River needs depth planning and a jurisdiction check during planning.
  • Fiber conduit: A route near Washington Street can carry communications conduit beneath the street, with each marked utility exposed before drilling close by.
  • Drainage bore: Tilden has 1.22 miles of unnamed drainage, so a route near that mapped drainage needs careful entry and exit pit placement.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

How do I get a quote for a Tilden bore near River Street?

For a River Street quote, send the job address or map pin, what will go underground, the pipe or conduit size and the footage; a sketch or plans help us see the route. Note whether the route reaches Texas State Highway 16 or the Frio River, since those features can change the crossing plan and the equipment or permits involved.

A short service away from Texas State Highway 16 with clear access is simpler to plan than a route through Brundage clay, under pavement or across the Frio River. The price depends on length, pipe or conduit size, soil and rock, marked utilities to expose, pavement, drainage crossings, pits, excavator time and sand backfill. Mobilization also reflects the 561 road miles from Yukon. A high profile or emergency job can add planning demands.

Questions people ask about boring in Tilden

Does Trinity Boring Solutions take jobs in Tilden, McMullen County, and who staffs them?

Yes, we take directional boring work in Tilden, McMullen County. Our own crews or crews from partner drilling contractors Trinity has vetted can staff a River Street or highway route. You coordinate with Trinity from the first call through the bore log, whichever crew is on site.

Who approves a bore under Texas State Highway 16 in Tilden?

TxDOT reviews a utility bore in the Texas State Highway 16 right of way at Tilden. The utility that owns the line submits the application through RULIS, and the TxDOT San Antonio District reviews it. We provide the bore plan and profile and work under the permit issued to that utility owner.

Can a utility line be bored under the Frio River in Tilden?

A bore beneath the Frio River can be planned, but the crossing needs a jurisdiction check during planning by the U.S. Army Corps of Engineers. The river runs 1.07 channel miles inside Tilden’s mapped community, so the route, depth and entry pits need to account for its channel.

Who owns electric lines in Tilden, McMullen County, and who confirms conduit specs?

Utilities reporting electric service in McMullen County include AEP Texas Central, Karnes Electric Cooperative, Medina Electric Cooperative, Nueces Electric Cooperative and San Patricio Electric Cooperative. We confirm which company owns the line at the specific Tilden address before planning conduit, and the line owner confirms its conduit specifications.

Who is responsible for Washington Street in Tilden, and must a bore cut it?

Tilden has no city government, so Washington Street matters go to the county or state authority responsible for that road. A directional bore can pass below pavement without cutting across it; the work uses pits in the dirt on each side, subject to the applicable road approval.

Does Tilden’s housing age mean buried lines near Congress Street are old?

Not necessarily: housing age does not establish buried line age. The American Community Survey 2019 to 2023 five year estimates give Tilden a median housing year of 1961, with 49 percent built before 1960. For a Congress Street replacement, we expose marked utilities before drilling so the route can be planned around what is actually underground.

Can I reach Trinity after hours about an urgent bore near Washington Street in Tilden?

Yes. Call (405) 409-7423; a person answers Trinity’s phone 24 hours a day, including after hours for urgent work near Washington Street or elsewhere in Tilden. Tell us the location and what line needs attention so we can understand the immediate scope.

How early should I request utility marks for a River Street bore in Tilden?

The person arranging a River Street bore must contact Texas811 at least 48 hours before excavation starts, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days ahead. If the start slips more than 14 days past the original notice, make a new request; worn or moved marks must be refreshed through Texas811 before work continues.

What affects the cost of a directional bore under Texas State Highway 16 in Tilden?

The route and scope determine the price. Length, pipe size, Brundage soil or rock, utilities to expose, pavement, drainage crossings, pits and equipment time all matter. A Texas State Highway 16 crossing can add permit and cover planning, while the 561 road miles from Yukon affect mobilization.

Where the Tilden facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Tilden

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Tilden, Texas

Type the address of your job in Tilden. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Tilden

All counties: Texas county list.