Encinal Texas Directional Boring: Duval Soil, Interstate 35 and Union Pacific Track
Quick Answer: For directional boring or horizontal directional drilling (HDD) near Interstate 35, we take Encinal work 596 road miles from our Yukon yard, using our own crews or vetted partner crews. Duval very fine sandy loam covers 68 percent of Encinal, and the soil can loosen behind the drill. The USDA survey maps sandy clay loam about 40 inches down across 85 percent of the city. We stage the reaming and have the pipe ready so a bore through Encinal soil is not left open longer than needed.
Encinal bores at a glance
- Incorporated city in La Salle County, Texas. Population 539 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 596 miles, about 11.4 hours of driving.
- Ground: Duval soil is mapped on 68 percent of the area, with sandy clay loam about 40 inches down.
- Rock: bedrock is mapped within 60 inches on 68 percent of the area.
- Highways inside the boundary: Interstate 35, Interstate 35 Business, US 81 Business and Texas State Highway 44. State permit office: TxDOT Laredo District.
- Railroad track inside the boundary: Union Pacific, with 3 mapped street and rail crossings.
- Public water: Encinal Water Supply Corporation, groundwater wells.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Who handles directional boring in Encinal, La Salle County?
From our Yukon yard, Encinal is 596 road miles away, so we plan our own crews and vetted partner crews around routes such as Main Street and Interstate 35. The Census Bureau Vintage 2024 estimate puts the city’s population at 539. We install water, sewer, gas, electric conduit and fiber, with routes planned along streets such as Grande Avenue, Front Street or Encinal Boulevard.
Our main office is in Yukon, Oklahoma, and Encinal work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our longest bore ran roughly 4,100 feet of 48 inch pipe under the Arkansas River in Tulsa. That reach is different from a service or conduit run near Encinal’s Main Street or Interstate 35; we have been a family business since 1965 and have done directional boring since 1982.

What does Duval County’s soil survey show beneath Encinal?
The USDA soil survey maps Duval very fine sandy loam across 68 percent of Encinal. Brystal very fine sandy loam covers 17 percent, and Moglia clay loam covers 15 percent. About 40 inches below the surface, sandy clay loam is mapped across 85 percent, with loam across the rest. The survey also maps sandy area across 68 percent at that depth. These mapped patterns are not test borings, so the route still needs field checks. In Duval soil, the sand share can make the hole lose support behind the bit; staged reaming and drilling fluid help hold the path open.
| USDA soil survey, inside the Encinal city limits | What is mapped |
|---|---|
| Soil series mapped | Duval 68 percent, Brystal 17 percent and Moglia 15 percent |
| Texture at the surface | very fine sandy loam 85 percent and clay loam 15 percent |
| Texture about 40 inches down | sandy clay loam 85 percent and loam 15 percent |
| Engineering class about 40 inches down | lean clay (CL) 83 percent and clayey sand (SC) 17 percent |
| Average clay content about 40 inches down | 24 percent |
| Bedrock mapped within 60 inches | 68 percent of the area (0 percent hard rock, 68 percent weathered rock) |
| Seasonal water table within 60 inches | 0 percent of the area |
| Flood prone soils | 0 percent of the area |
| High corrosion risk for uncoated steel | 15 percent of the area |
The USDA survey maps weathered bedrock within 60 inches across 68 percent of Encinal, while hard bedrock is not mapped at that depth. Weathered rock can slow the drill compared with soil, and the soil to rock change can affect steering. Seasonal water tables and flood prone soils are not mapped in the city, which lowers those particular concerns along Main Street. High steel corrosion risk is mapped across 15 percent, so the line owner should consider steel casing and tracer wire materials. The Laredo Formation, an Eocene unit of sandstone and clay, adds the possibility of changing ground along a bore route.
How do we plan directional boring through Encinal’s sandy clay loam?
Encinal’s sandy clay loam and mapped weathered bedrock call for checking the route as we drill. We expose marked lines before the drill approaches and track its position from the surface.
- We review the Duval soil route and the mapped weathered bedrock pattern, then adjust the bore plan if field conditions change.
- Before a bore near Main Street or Grande Avenue, we hydrovac expose marked utilities because surface paint does not show burial depth.
- We track the drill head from above ground and log depth and pitch as it advances through Encinal’s sandy clay loam.
- For a route near Interstate 35, we stage reaming and keep the pipe ready so the sandy ground is not left unsupported.

What does a bore have to cross in Encinal near Interstate 35?
Interstate 35 has 1.8 mapped roadway miles inside Encinal, with Interstate 35 Business adding 0.8 miles. US 81 Business and Texas State Highway 44 also run through the city. A route may need to pass beneath one of these roads rather than disturb its surface. The named street network includes Main Street, Grande Avenue and Front Street, among 44 named streets. We check the planned path against the actual road and pavement limits before setting bore pits or selecting a crossing method.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| Interstate 35 | Interstate | 1.8 roadway miles inside | State highway office |
| Interstate 35 Business | Interstate | 0.8 roadway miles inside | State highway office |
| US 81 Business | US highway | 0.8 roadway miles inside | State highway office |
| Texas State Highway 44 | State highway | 0.6 roadway miles inside | State highway office |
| Union Pacific | Railroad | 0.83 track miles inside | The railroad |
| Jaboncillo Creek | Stream nearby | 0.6 miles outside | Checked for Corps of Engineers jurisdiction |
Union Pacific owns 0.83 track miles inside Encinal, with three mapped street and rail crossings in the city. A bore route near those tracks needs coordination with the railroad owner. No named stream runs inside the city limits. Jaboncillo Creek is 0.6 miles outside them, and no mapped street crossings of named streams are inside Encinal. No lakes or ponds are mapped within one mile, so a local water crossing is not evident from those records.
Who approves an Encinal bore near Union Pacific track?
Encinal is incorporated, so its city streets belong to the city; we do not assume a city permit detail that is not established here. Interstate 35, Interstate 35 Business, US 81 Business and Texas State Highway 44 are state or US highway routes, so right of way work needs a TxDOT utility permit. The TxDOT Laredo District reviews it. The utility owner, not our crew, files in TxDOT’s RULIS system, and we prepare the bore plan and profile for that application. A crossing under Union Pacific track needs an agreement from the railroad owner, which sets crossing conditions such as casing, depth and flagging. Jaboncillo Creek is checked for U.S. Army Corps of Engineers jurisdiction during planning.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Whose lines are already buried near Encinal Water Supply Corporation?
Encinal Water Supply Corporation runs the public water system, using groundwater wells for 1,338 people through 598 service connections. That makes water line locations important to confirm before a new service crosses a route near Main Street. AEP Texas Central, Karnes Electric Cooperative and Medina Electric Cooperative report electric service in La Salle County. We confirm the electric line owner for the address before planning a conduit bore, then hydrovac expose marked lines near the proposed path.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| Encinal Water Supply Corporation | Public water system | Groundwater wells | 598 connections, 1,338 people served |
| AEP Texas Central, Karnes Electric Cooperative and Medina Electric Cooperative | Electric utilities reporting service in La Salle County | EIA Form 861 | Confirm the line owner by address |
With Encinal’s median housing year at 1946, we account for the area’s housing age when planning underground work. We use Encinal’s survey figures, 52 percent before 1960, 24 percent from 1960 to 1999, and 24 percent in 2000 or later, as context for underground work. A route near Front Street may serve an older line being replaced or a newer service connection, so we check what is in the ground rather than assume. We hydrovac marked utilities along the bore path before drilling near them; paint shows position, not depth.

How far is Encinal from La Moca Ranch and our Yukon yard?
Encinal is an incorporated city in La Salle County, covers 0.43 square miles and sits at 554 feet elevation. We use ZIP code 78019 to identify Encinal when preparing underground work details. La Moca Ranch is 13.4 miles southwest, and Los Huisaches is 11.8 miles southwest. Cotulla, the county seat, is 28.3 miles north; Laredo is 34.2 miles south. From our Yukon yard, Encinal is 596 road miles away, a drive of 11.4 hours. That distance is part of planning equipment and crew logistics for a job on Main Street or Interstate 35.
Places near Encinal
- Los Huisaches: 11.8 miles southwest
- La Moca Ranch: 13.4 miles southwest
- Four Points: 17.9 miles south
- Sunset Acres: 18.1 miles south
- Directional boring in Bonanza Hills: 18.4 miles south
- Directional boring in Laredo: 34.2 miles south
What would we bore near Jaboncillo Creek and Encinal?
- Highway crossing: A bore beneath Interstate 35 or Texas State Highway 44 can carry water, sewer or conduit without cutting through the road surface.
- Water service: A new connection near Main Street can be planned around Encinal Water Supply Corporation lines and nearby marked utilities.
- Fiber route: A fiber conduit along Grande Avenue can pass below pavement and sidewalks, with the path checked against existing lines.
- Rail crossing: A proposed bore beneath Union Pacific track needs the railroad agreement and its crossing conditions before the route is set.
- Creek crossing: A route toward Jaboncillo Creek, 0.6 miles outside the city, needs planning for the channel and a jurisdiction check.
- Electric conduit: A Front Street conduit route starts with confirming the line owner, since several utilities report service in La Salle County.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What do you need to quote a bore near Main Street in Encinal?
For a Main Street quote, start with the address or map pin. Tell us what goes underground, such as a water line or fiber conduit, then give the pipe or conduit size and footage. A sketch or plans help show how the route relates to Interstate 35, nearby streets or Union Pacific track.
The job route and scope shape the price. Duval soil and the chance of weathered bedrock affect drilling time; a crossing of Interstate 35 or Union Pacific track adds coordination. Pavement, exposed utilities, pits, excavator time, sand backfill and creek or drainage crossings also affect the work. Encinal’s 596 road miles from Yukon can affect mobilization. High profile or emergency work can call for additional planning.
Questions people ask about boring in Encinal
Does Trinity Boring Solutions take jobs in Encinal, La Salle County, and how are crews assigned?
Yes. We take directional boring work in Encinal and plan it with our own crews or partner drilling contractors we have vetted. Our Yukon main office is 596 road miles away, so the crew plan accounts for the trip and the work near features such as Main Street. You deal with Trinity through the bore log.
Is there rock beneath Encinal’s Duval soil?
The USDA soil survey maps weathered bedrock within 60 inches across 68 percent of Encinal, but does not map hard bedrock at that depth. Weathered rock can slow a bore and a soil to rock transition can shift the drill head. The survey maps ground patterns, so field conditions still need checking along the planned route.
Who approves a bore under Interstate 35 in Encinal?
TxDOT reviews right of way utility permits for Interstate 35 through the TxDOT Laredo District. The utility owner files the application in RULIS, not the drilling contractor. We provide the bore plan and profile for the owner’s application, and the permit may set project specific depth conditions.
What does a bore under Union Pacific track in Encinal require?
A proposed crossing needs an agreement with Union Pacific, which owns 0.83 track miles inside Encinal. The railroad’s agreement sets crossing conditions such as casing, depth and flagging. We plan the bore around those conditions and any nearby street and rail crossing shown on the route.
Can a line be bored under Jaboncillo Creek near Encinal?
A bore may be considered, but the route and channel conditions need review first. Jaboncillo Creek is 0.6 miles outside Encinal’s limits, and planning checks whether the crossing falls within U.S. Army Corps of Engineers jurisdiction. The creek location and proposed entry and exit points help define the work.
Who operates Encinal’s public water system, and where does that system get its water?
Encinal Water Supply Corporation operates the public water system, which uses groundwater wells. The records list 598 service connections serving 1,338 people. Before work near Main Street, we locate and expose marked water lines along the proposed bore path.
Can I reach Trinity after hours about an urgent bore on Front Street in Encinal?
Yes. A person answers our phone 24 hours a day at (405) 409-7423. For urgent work near Front Street, tell us the location and what needs to go underground so we can understand the route and the immediate scope.
How early should I request utility marks for a bore on Main Street in Encinal?
Submit the locate request through Texas811 at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays; Texas811 describes that as two working days. The request cannot be made more than 14 days before the start. If the start slips more than 14 days past the original notice, submit a new one, and refresh worn or moved marks before work continues.
What affects the cost of directional boring near Interstate 35 in Encinal?
The route length, pipe or conduit size, Duval soil and weathered bedrock all matter. So do exposed utilities, pavement, pits, creek crossings and any Union Pacific coordination. Yukon’s 596 road miles shape how we schedule mobilization for underground work in Encinal. We need the job details to assess the work rather than price it from footage alone.
Where the Encinal facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Encinal
- U.S. Census Bureau, TIGER/Line 2024: Encinal boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Encinal
- U.S. Census Bureau, American Community Survey 2019 to 2023: Encinal housing units and year built
- Macrostrat geologic map compilation: map units under Encinal
- U.S. EPA Safe Drinking Water Information System: public water systems serving Encinal
- U.S. Department of Transportation, North American Rail Network: track owners in La Salle County
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving La Salle County
- U.S. Geological Survey, Elevation Point Query Service: Encinal elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Encinal
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Encinal
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Encinal, Texas
Type the address of your job in Encinal. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Encinal
Same county: Cotulla · Fowlerton. All counties: Texas county list.