Buckholts Texas Directional Boring: Houston Black Clay, US 190, Lipan Creek
Quick Answer: Can we get a line under US 190, BNSF Railway or Lipan Creek without cutting the surface? Yes, Trinity Boring Solutions takes directional boring work in Buckholts, Texas, also called horizontal directional drilling (HDD), for crossings like these. Buckholts is 355 road miles from our Yukon, Oklahoma main office, and US 190 runs through town. Houston Black soil makes up 67% of the mapped area, so sticky clay needs careful fluid control and staged reaming. We plan each route around the street, track or creek in its path.
Buckholts bores at a glance
- Incorporated city in Milam County, Texas. Population 391 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 355 miles, about 6.8 hours of driving.
- Ground: Houston Black soil is mapped on 67 percent of the area, with clay about 40 inches down.
- Rock: bedrock is mapped within 60 inches on 5 percent of the area.
- Highways inside the boundary: US 190, Texas State Highway 36 and FM 1915. State permit office: TxDOT Bryan District.
- Railroad track inside the boundary: BNSF Railway, with 2 mapped street and rail crossings.
- Named streams inside the boundary: Lipan Creek.
- Public water: City of Buckholts, surface water bought from another system.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Who can I call for directional boring in Buckholts, Milam County?
Trinity Boring Solutions takes directional boring work in Buckholts, an incorporated town in Milam County with a Census Bureau Vintage 2024 estimate of 391 residents. Can we bore beneath Buckholts roads, tracks, or creeks without cutting them? We bore routes for water, sewer, gas, electric conduit and fiber near US 190, 8th Street and Lipan Creek.
Our main office is in Yukon, Oklahoma, and Buckholts work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our longest bore is roughly 4,100 feet under the Arkansas River in Tulsa; a typical Buckholts job is smaller, such as a service line beneath 4th Street. We are a family business started 1965 and have done directional boring since 1982.

How does Houston Black soil affect boring conditions in Buckholts?
Houston Black soil covers 67% of Buckholts in the USDA soil survey, so sticky clay is a central drilling consideration. At about 40 inches below the surface, clay is mapped across 76% of town and the average clay content is 52%. We treat Houston Black soil maps as mapped patterns, not substitutes for test borings in Buckholts. The clay can cling to a reamer and grip pipe as it swells, so we plan fluid and reaming around the ground rather than treating the mapped texture as a site test. Satin gravelly clay loam covers another 23% of the mapped area.
| USDA soil survey, inside the Buckholts city limits | What is mapped |
|---|---|
| Soil series mapped | Houston Black 67 percent, Satin 23 percent, Ferris 5 percent and Tinn 4 percent |
| Texture at the surface | clay 76 percent and gravelly clay loam 23 percent |
| Texture about 40 inches down | clay 76 percent and very gravelly clay 23 percent |
| Engineering class about 40 inches down | fat clay (CH) 76 percent and clayey gravel (GC) 23 percent |
| Average clay content about 40 inches down | 52 percent |
| Bedrock mapped within 60 inches | 5 percent of the area (0 percent hard rock, 5 percent weathered rock) |
| Seasonal water table within 60 inches | 0 percent of the area |
| Flood prone soils | 4 percent of the area |
| High corrosion risk for uncoated steel | 99 percent of the area |
Bedrock is mapped within 60 inches in 5% of Buckholts, and that mapped bedrock is weathered rather than hard; none is mapped within 40 inches. Seasonal water table soils are not mapped, while flood prone soils cover 4%, a point to check near Lipan Creek. High steel corrosion risk is mapped across 99%, so the line owner should consider casing and tracer wire materials. The USDA soil survey also maps Pleistocene high gravel deposits and Late Cretaceous sedimentary units, which may change drilling conditions along a route.
What does boring through Buckholts clay require?
In Buckholts, Houston Black clay calls for controlled fluid and staged reaming rather than one aggressive pass. We match the setup to the mapped soil and check the route near streets, BNSF Railway and Lipan Creek.
- Houston Black clay can build up on the reamer, so we use thinner drilling fluid with polymer and open the hole in stages before pulling pipe.
- The high clay share around 8th Street calls for watching fluid returns closely; excess pressure can lift pavement over the bore.
- Gravelly clay loam and mapped high gravel deposits may affect the drill head, so we check depth and pitch as the route advances beneath Buckholts streets.
- Near Lipan Creek, we plan the bore depth below the channel and check jurisdiction during planning; a walkover locator tracks the head and logs depth and pitch.

What is in the way of a new line on Buckholts 8th Street?
US 190, Texas State Highway 36 and FM 1915 all run inside Buckholts, so a route beneath their pavement needs a bore rather than an open trench. The TxDOT Bryan District reviews state highway utility permits. Among local streets, 8th Street runs 2.05 miles, 4th Street runs 1.19 miles and 6th Street runs 1.07 miles. Main Street adds another possible work corridor, with 0.93 miles inside town. We plan the entry and exit pits off the paved travel way.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| US 190 | US highway | 4.1 roadway miles inside | State highway office |
| Texas State Highway 36 | State highway | 2.1 roadway miles inside | State highway office |
| FM 1915 | State highway | 1.8 roadway miles inside | State highway office |
| BNSF Railway | Railroad | 1.24 track miles inside | The railroad |
| Lipan Creek | Stream | 0.31 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Indian Hollow | Stream nearby | 0.2 miles outside | Checked for Corps of Engineers jurisdiction |
| Indian Hollow | Lake or pond | 32 acres, nearby | Checked for Corps of Engineers jurisdiction |
BNSF Railway has 1.24 track miles inside Buckholts, and public mapping shows 2 street and rail crossings in town. A crossing route needs to account for the railroad agreement before work is laid out. Lipan Creek runs 0.31 channel miles through Buckholts, with 1 mapped street crossing of a named stream. Indian Hollow is 0.2 miles outside town, and its 32 acre pond is outside the limits; creek and pond routes need site specific planning.
Do I need a permit to bore Buckholts roads or BNSF Railway?
For a Buckholts crossing under US 190, Texas State Highway 36 or FM 1915, the utility owner submits a TxDOT utility permit in RULIS, and the TxDOT Bryan District reviews it. Electric and communication lines need 60 inches of cover below the lowest crossed highway grade; water needs 60 inches and pressurized sewer needs 60 inches at a crossing. A different depth may be set in the permit. Because Buckholts is incorporated, we treat its streets as city streets when planning boring work. A bore under BNSF Railway needs an agreement from the railroad, and a Lipan Creek crossing is checked for U.S. Army Corps of Engineers jurisdiction during planning.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Which utilities are near the City of Buckholts water system?
The City of Buckholts public water system serves 365 people through 190 service connections and uses purchased surface water. Before a bore near 8th Street, we confirm which lines are in the route. Electric service reported in Milam County includes Entergy Texas, Oncor Electric Delivery Company, Bartlett Electric Cooperative, Bluebonnet Electric Cooperative and Heart of Texas Electric Cooperative. The specific electric line owner needs confirmation before planning a conduit bore.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| City of Buckholts | Public water system | Surface water bought from another system | 190 connections, 365 people served |
| Entergy Texas, Oncor Electric Delivery Company, Bartlett Electric Cooperative, Bluebonnet Electric Cooperative and Heart of Texas Electric Cooperative | Electric utilities reporting service in Milam County | EIA Form 861 | Confirm the line owner by address |
The American Community Survey 2019 to 2023 five year estimates put Buckholts’s median housing year at 1990; 20% of homes were built before 1960, and 25% in 2000 or later. That mix can mean either replacement work or new service near Main Street. Paint marks line position, not depth, so we hydrovac pothole each marked utility on the route before the drill approaches it.

What is near Buckholts, including Cameron?
Buckholts is in Milam County, at elevation 506 feet, and covers 1.36 square miles in ZIP code 76518. Rogers is 7.1 miles northwest, while Cameron, the county seat and nearest larger city, is 9.1 miles east. Ben Arnold is 11.1 miles northeast, and Burlington is 12.2 miles northeast. Our Yukon, Oklahoma yard is 355 road miles away, a 6.8 hour drive, which affects mobilization for work near US 190 as well as the route plan.
Places near Buckholts
- Directional boring in Rogers: 7.1 miles northwest
- Directional boring in Cameron: 9.1 miles east
- Directional boring in Ben Arnold: 11.1 miles northeast
- Directional boring in Burlington: 12.2 miles northeast
- Directional boring in Little River-Academy: 14.8 miles northwest
What kinds of bores come up near Buckholts 4th Street?
- Highway crossing: A bore beneath US 190 keeps the line below the roadway instead of cutting across its pavement.
- Water service: A new connection near the City of Buckholts system needs a route coordinated with existing lines along 4th Street.
- Fiber conduit: A conduit crossing beneath 8th Street can avoid opening the long paved street surface.
- Creek crossing: A route under Lipan Creek needs depth planning below the channel and a jurisdiction check during planning.
- Rail crossing: Work beneath BNSF Railway calls for an agreement with the track owner before the crossing is built.
- Utility exposure: On Main Street, hydrovac potholing can expose marked lines before drilling near them, since paint does not show depth.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What should I send for a Buckholts bore quote near Main Street?
For a Buckholts quote, start with the address or map pin, such as a location on Main Street. Tell us what goes underground, whether it is a water line or fiber conduit, then give the pipe or conduit size and footage. A sketch or plans showing the route toward US 190 or Lipan Creek helps us see the crossings before we scope the work.
The job route sets the price, starting with the 355 road miles from Yukon and the mobilization needed for a Buckholts site. Houston Black clay can affect drilling time and reaming; a crossing of US 190 or BNSF Railway adds coordination and exposure work. We also account for length, line size, utilities to expose, pavement, creek crossings, pits, excavator time and sand backfill. Emergency or high profile work can require a different scope.
Questions people ask about boring in Buckholts
Does Trinity take directional boring jobs in Buckholts, Milam County?
Yes, Trinity takes directional boring work in Buckholts, Milam County. We staff the job with our own crews or through satellite yards operated by partner drilling contractors we have vetted. Whether the route is near 8th Street or US 190, you work with Trinity through planning and the bore log.
Is there rock under Buckholts, and how much is mapped within five feet?
The USDA soil survey maps bedrock within 60 inches in 5% of Buckholts, and the mapped bedrock is weathered rather than hard. None is mapped within 40 inches. The map does not rule out rock at greater depth, so a route near FM 1915 still needs site specific evaluation.
Who approves a Buckholts bore under US 190, and which TxDOT office reviews it?
The utility owner applies for the US 190 right of way permit through TxDOT’s RULIS system, and the TxDOT Bryan District reviews it. We prepare the bore plan and profile for the owner’s application and work under the permit issued to that owner. The permit can set project specific cover depth.
What does a Buckholts bore under BNSF Railway need?
A bore beneath BNSF Railway needs an agreement from the railroad that owns the track. That agreement sets crossing conditions such as casing, depth and flagging. Buckholts has 1.24 track miles of BNSF Railway inside town, so the crossing alignment needs to be established before drilling is planned.
Can a line be bored under Lipan Creek in Buckholts?
A line can be planned beneath Lipan Creek, which runs 0.31 channel miles within Buckholts. We plan the depth to stay under the channel and check during planning whether the crossing falls under U.S. Army Corps of Engineers jurisdiction. The route and creek conditions determine the bore design.
Who owns Buckholts’s public water system, and does it use purchased surface water?
We account for the City of Buckholts ownership and purchased surface water when planning underground work. We plan underground work with Buckholts’s public system scale in mind: it serves 365 people through 190 service connections. Those figures identify the public system, but a proposed connection near 4th Street still needs its specific existing lines located and exposed.
How far is Buckholts from Cameron and Trinity’s Yukon main office?
Buckholts is 355 road miles from Trinity’s Yukon, Oklahoma main office, about a 6.8 hour drive. Cameron is 9.1 miles east and is the county seat. That distance affects mobilization for work near US 190, while the route, ground and crossings shape the rest of the job.
How much 811 notice do I need for a Buckholts bore near 8th Street?
For a bore near 8th Street, Texas811 needs the locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before it. In Buckholts, if the start slips more than 14 days past the original notice, we make a new request before boring. For Buckholts work, we have worn or moved marks refreshed through Texas811 before continuing boring.
What affects the cost of directional boring under US 190 in Buckholts?
The scope under US 190 determines the price, including bore length, line size, Houston Black clay, pavement and utilities that need exposure. A BNSF Railway or Lipan Creek crossing can add coordination and planning. The 355 road miles from Yukon also affect mobilization, along with pits, excavator time, sand backfill and emergency timing.
Where the Buckholts facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Buckholts
- U.S. Census Bureau, TIGER/Line 2024: Buckholts boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Buckholts
- U.S. Census Bureau, American Community Survey 2019 to 2023: Buckholts housing units and year built
- Macrostrat geologic map compilation: map units under Buckholts
- U.S. EPA Safe Drinking Water Information System: public water systems serving Buckholts
- U.S. Department of Transportation, North American Rail Network: track owners in Milam County
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Milam County
- U.S. Geological Survey, Elevation Point Query Service: Buckholts elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Buckholts
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Buckholts
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Buckholts, Texas
Type the address of your job in Buckholts. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
