Chireno Texas Directional Boring: Cuthbert Soil, Amaladeros Creek and Texas State Highway 21
Quick Answer: Can we get a line beneath Texas State Highway 21 without cutting the pavement? Yes, we use directional boring, also called horizontal directional drilling (HDD), for Chireno crossings such as this highway. Chireno is 415 road miles from our Yukon, Oklahoma main office, and Main Street is one of the city’s longest named roads. Cuthbert soil covers 26 percent of Chireno, while sandy clay loam is the leading texture at about 40 inches, so sticky cuttings can make staged reaming useful.
Chireno bores at a glance
- Incorporated city in Nacogdoches County, Texas. Population 376 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 415 miles, about 8.3 hours of driving.
- Ground: Cuthbert soil is mapped on 26 percent of the area, with sandy clay loam about 40 inches down.
- Rock: bedrock is mapped within 60 inches on 36 percent of the area.
- Highways inside the boundary: Texas State Highway 21, FM 95 and Loop 34. State permit office: TxDOT Lufkin District.
- Railroad track inside the boundary: none mapped.
- Named streams inside the boundary: Amaladeros Creek.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Who can bore beneath Texas State Highway 21 in Chireno?
Trinity Boring Solutions handles directional boring in Chireno, an incorporated city in Nacogdoches County with a Census Bureau Vintage 2024 estimate of 376 residents. Can we get a line under Texas State Highway 21 without cutting the pavement? We install water, sewer, gas, electric conduit and fiber for routes beneath that highway, Main Street or other Chireno roads.
Our main office is in Yukon, Oklahoma, and Chireno work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Since 1982, four decades of directional boring have taught us to plan for Cuthbert soil that can cling to a reamer. We stay involved from the first call through the bore log, including work along Texas State Highway 21.

How does Cuthbert soil affect directional boring in Chireno?
The USDA soil survey maps Cuthbert as Chireno’s largest named soil series, covering 26 percent of the city, and Cuthbert fine sandy loam on 8 to 20 percent slopes covers 25 percent. At about 40 inches below the surface, sandy clay loam is mapped across 55 percent of the area, while clay is mapped across 26 percent. Average clay content at that depth is 34 percent. These are mapped patterns, not test borings, so the exact route still needs field evaluation. Clay can hold a hole open but stick to the reamer and grip pipe.
| USDA soil survey, inside the Chireno city limits | What is mapped |
|---|---|
| Soil series mapped | Cuthbert 26 percent, Nacogdoches 17 percent, Kirvin 15 percent, Bowie 10 percent and Trawick 8 percent |
| Texture at the surface | fine sandy loam 66 percent, loamy fine sand 15 percent and clay loam 14 percent |
| Texture about 40 inches down | sandy clay loam 55 percent, clay 26 percent and clay loam 18 percent |
| Engineering class about 40 inches down | lean clay (CL) 48 percent, fat clay (CH) 26 percent and clayey sand (SC) 24 percent |
| Average clay content about 40 inches down | 34 percent |
| Bedrock mapped within 60 inches | 36 percent of the area (0 percent hard rock, 36 percent weathered rock) |
| Seasonal water table within 60 inches | 21 percent of the area |
| Flood prone soils | 2 percent of the area |
| High corrosion risk for uncoated steel | 46 percent of the area |
The USDA soil survey maps bedrock within 60 inches across 36 percent of Chireno, with typical depth at 37 inches; that mapped bedrock is weathered, not hard. A seasonal water table is mapped within 60 inches across 21 percent, so pits may need pumping. Flood prone soils cover 2 percent. High steel corrosion risk is mapped across 46 percent, a concern for uncoated casing and tracer wire that the line owner should address. The Eocene Weches Formation includes sandstone and claystone, so a route may encounter changing materials.
How do crews bore sandy clay loam in Chireno?
Chireno’s sandy clay loam and clay at about 40 inches call for steady fluid control and staged reaming. We adjust the bore to the ground we encounter near Amaladeros Creek or a city road.
- Fluid control: Chireno’s mapped clay can cling to the reamer, so we use a thinner drilling mix and polymer, then ream in stages to manage sticky cuttings.
- Timing: Where Cuthbert soil holds an open hole, we plan the pipe pull for the same day as the final opening to limit the chance of clay gripping the pipe.
- Pit setup: A seasonal water table is mapped within 60 inches across 21 percent of Chireno, so a wet location may call for smaller pits and pumping.
- Tracking: Near Texas State Highway 21, we follow the drill head from the surface and record depth and pitch as the bore advances.

Where might a bore pass beneath Main Street in Chireno?
Chireno has Texas State Highway 21, FM 95 and Loop 34 within its limits, so a highway crossing needs a planned bore profile and the applicable TxDOT permit. Main Street is the longest named street at 1.88 miles in the city. Gingerbread Lane runs 1.14 miles and New Town Road runs 0.61 miles. A bore beneath any of these roads can keep pavement intact, with entry and exit pits placed off the traveled surface where the site allows.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| Texas State Highway 21 | State highway | 3.7 roadway miles inside | State highway office |
| FM 95 | State highway | 2 roadway miles inside | State highway office |
| Loop 34 | State highway | 1.5 roadway miles inside | State highway office |
| Amaladeros Creek | Stream | 0.27 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Polysot Creek | Stream nearby | 0.1 miles outside | Checked for Corps of Engineers jurisdiction |
| Attoyac Bayou | Stream nearby | 0.6 miles outside | Checked for Corps of Engineers jurisdiction |
| Attoyal Bayou | Stream nearby | 0.6 miles outside | Checked for Corps of Engineers jurisdiction |
| Niciper Creek | Stream nearby | 0.8 miles outside | Checked for Corps of Engineers jurisdiction |
Railroad track is not mapped inside Chireno or within one mile outside its limits, and no street and rail crossing is mapped. Amaladeros Creek runs 0.27 miles through the city, where one mapped street crossing intersects a named stream. Polysot Creek is 0.1 miles from the city limits, and Attoyac Bayou is 0.6 miles away. We plan boring near Amaladeros Creek with the map showing no lakes or ponds within one mile. A creek bore needs channel planning and a check for federal jurisdiction.
Do I need a permit to bore in Nacogdoches County in Chireno?
For a bore beneath Texas State Highway 21, FM 95 or Loop 34 in Chireno, the line owner files the TxDOT utility permit through RULIS, not the driller. We prepare the bore plan and profile for that application, and the TxDOT Lufkin District reviews it. Electric and communication lines crossing a highway need 60 inches of cover below the lowest crossed grade; water needs 60 inches, and pressurized sewer needs 60 inches. The permit may set another depth. City streets such as Main Street belong to the incorporated city. A crossing at Amaladeros Creek is checked for U.S. Army Corps of Engineers jurisdiction.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
What lines are already in the ground in Nacogdoches County in Chireno?
The water provider for a specific Chireno address has to be confirmed with the city, county or local water district before a bore is planned. EPA drinking water records do not tie systems to towns in Texas, so the provider cannot be matched from those records. Utilities reporting electric service in Nacogdoches County include Oncor Electric Delivery Company, Cherokee County Electric Cooperative Association, Deep East Texas Electric Cooperative and Rusk County Electric Cooperative. We confirm the line owner for the address before planning an electric conduit bore.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| Oncor Electric Delivery Company, Cherokee County Electric Cooperative Association, Deep East Texas Electric Cooperative and Rusk County Electric Cooperative | Electric utilities reporting service in Nacogdoches County | EIA Form 861 | Confirm the line owner by address |
The American Community Survey 2019 to 2023 five year estimates put Chireno’s median housing year at 1981; 19 percent of homes were built before 1960, 63 percent from 1960 to 1999 and 18 percent in 2000 or later. That mix can mean replacement work as well as new service lines near Main Street. We expose every marked utility on the bore path with hydrovac potholing before drilling near it. A marked line beneath Main Street must be exposed because paint shows position, not depth.

How far is Chireno from Broaddus and the Yukon yard?
Chireno is in Nacogdoches County at an elevation of 271 feet and covers 1.87 square miles. We use ZIP code 75937, which serves Chireno in Nacogdoches County, to identify underground work locations. Broaddus is 14.1 miles south, and San Augustine is 14.0 miles east. Nacogdoches, the county seat and nearest larger city, is 19.7 miles northwest. From our Yukon, Oklahoma main office, the road distance is 415 miles and the drive takes 8.3 hours, which can affect mobilization for a Chireno project.
Places near Chireno
- Directional boring in San Augustine: 14 miles east
- Directional boring in Broaddus: 14.1 miles south
- Directional boring in Nacogdoches: 19.7 miles northwest
- Directional boring in Huntington: 20.3 miles southwest
- Directional boring in Appleby: 21.6 miles northwest
What would we bore beneath New Town Road in Chireno?
- Highway crossing: A bore beneath Texas State Highway 21 keeps the existing pavement intact and follows the cover depth in the TxDOT permit.
- Water service: A new line near Main Street needs its address provider confirmed and its route checked against marked utilities before drilling.
- Fiber route: A conduit run along New Town Road can pass under the roadway without opening a trench across the pavement.
- Creek crossing: A route at Amaladeros Creek needs a channel profile and a check for U.S. Army Corps of Engineers jurisdiction.
- Street bore: New Camp Road offers a named route where entry and exit pits can be planned outside the pavement when site access allows.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What drives the price of a bore near New Camp Road in Chireno?
To quote directional boring in Chireno, we need the address or map pin, what goes underground, the pipe or conduit size and footage; a sketch or plans help. For a route near New Camp Road, include any known crossings, pavement and creek details so we can assess the actual bore path rather than assume a standard layout.
Ground, crossings and logistics each shape the price for a Chireno bore. Cuthbert soil and clay at about 40 inches can affect fluid use and reaming. Crossing Texas State Highway 21 brings permit and cover planning, while pavement, marked utilities and Amaladeros Creek can add exposure or access work. Pit size, excavator time, sand backfill, pipe size and footage also matter. The 415 road miles from Yukon affect mobilization, and urgent or high profile work can change the plan.
Questions people ask about boring in Chireno
Does Trinity Boring Solutions take jobs in Chireno and Nacogdoches County, and who staffs them?
Yes, we take directional boring work in Chireno and elsewhere in Texas. Our Yukon office manages the job, and work may be done by our own crews or by crews from vetted partner drilling contractors. You deal with Trinity from the first call through the bore log, including a route beneath Texas State Highway 21.
Could groundwater near Amaladeros Creek cause trouble for Chireno bore pits?
It can at some locations. The USDA soil survey maps a seasonal water table within 60 inches across 21 percent of Chireno, so a pit near Amaladeros Creek may need pumping or a smaller layout. Flood prone soils cover 2 percent of the city, but the creek route still needs its own site review.
Does Cuthbert soil in Chireno create a steel corrosion concern, and what pipe can we use?
The USDA soil survey maps high steel corrosion risk across 46 percent of Chireno, including areas with Cuthbert soil. The line owner should consider casing and tracer wire materials for the actual route. HDPE does not have the same soil corrosion concern, while the owner selects any coating for steel components.
What ground would a bore encounter in Chireno’s Cuthbert soil?
The USDA soil survey maps Cuthbert across 26 percent of Chireno, with sandy clay loam mapped at about 40 inches across 55 percent of the area. Clay is mapped at that depth across 26 percent. These are survey patterns rather than route specific borings, and sticky clay can build up on a reamer.
Is rock likely on a Chireno bore route, and how much bedrock is mapped within five feet?
Bedrock is mapped within 60 inches across 36 percent of Chireno, and weathered bedrock accounts for that mapped depth range. Hard bedrock is not mapped within 60 inches. The survey also maps bedrock within 40 inches across 27 percent, so a route can still call for slower drilling where weathered rock is present.
Who approves a bore under Texas State Highway 21 in Chireno, and which TxDOT office reviews it?
The line owner applies for the utility permit through TxDOT’s RULIS system; the contractor does not file it. For Chireno, the TxDOT Lufkin District reviews the application. We prepare the bore plan and profile for the owner, with the required highway cover and crossing details for Texas State Highway 21.
Does Trinity cover San Augustine, Broaddus and rural sites outside Chireno?
Yes, we take work across Texas, including Chireno, nearby San Augustine and Broaddus, as well as rural sites. San Augustine is 14.0 miles east of Chireno and Broaddus is 14.1 miles south. The project address and access determine the mobilization plan from our Yukon office.
How much notice does Texas811 need for a Chireno bore near Main Street, and what if marks move?
For a Main Street bore, submit the Texas811 locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before work. For Texas State Highway 21 work, we submit a new request if the start slips more than 14 days past the original notice. Along Main Street, we refresh worn or moved marks through Texas811 before boring work continues.
What affects the cost of directional boring under Texas State Highway 21 in Chireno?
The job scope drives the price, including bore length, pipe size, soil, exposed utilities, pavement, pits and access. Cuthbert clay can change reaming needs, while a Texas State Highway 21 crossing has permit and cover requirements. Creek work near Amaladeros Creek and mobilization from Yukon also affect the job plan.
Where the Chireno facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Chireno
- U.S. Census Bureau, TIGER/Line 2024: Chireno boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Chireno
- U.S. Census Bureau, American Community Survey 2019 to 2023: Chireno housing units and year built
- Macrostrat geologic map compilation: map units under Chireno
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Nacogdoches County
- U.S. Geological Survey, Elevation Point Query Service: Chireno elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Chireno
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Chireno
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Chireno, Texas
Type the address of your job in Chireno. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.