Mobeetie Texas Directional Boring: Texroy Loam, FM 48 and Adobe Creek
Quick Answer: Mobeetie’s Texroy loam can hold an open hole, and Trinity Boring Solutions provides directional boring, also called horizontal directional drilling (HDD), for routes near FM 48. Adobe Creek runs through town, and its mapped street crossings can affect the bore path. Mobeetie is 174 road miles from our Yukon, Oklahoma main office, with Dickerson Street among its local route features. Clay loam is common about 40 inches down, so we plan the drilling fluid and reaming around ground that can grip pipe.
Mobeetie bores at a glance
- Incorporated city in Wheeler County, Texas. Population 84 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 174 miles, about 3.5 hours of driving.
- Ground: Texroy soil is mapped on 44 percent of the area, with clay loam about 40 inches down.
- Rock: no bedrock is mapped in the top 60 inches.
- Highways inside the boundary: FM 48, Texas State Highway 152 and FM 1046. State permit office: TxDOT Childress District.
- Railroad track inside the boundary: none mapped.
- Named streams inside the boundary: Adobe Creek.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Who can I call for directional boring near FM 48 in Mobeetie?
Texroy loam is the main mapped ground in Mobeetie, and Trinity Boring Solutions takes directional boring work here for lines routed near FM 48 and Dickerson Street. Mobeetie is in Wheeler County, where the Census Bureau Vintage 2024 estimate puts the population at 84. We install water, sewer, gas, electric conduit and fiber lines along local streets or across routes such as FM 48.
Our main office is in Yukon, Oklahoma, and Mobeetie work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our family business began in 1965. Since 1982, four decades of directional boring have shaped how we plan for Mobeetie’s Texroy loam and Adobe Creek crossings. We coordinate the crossing review along Texas State Highway 152 from the first call through the bore log, regardless of which crew is on site.

How does Texroy soil affect a directional bore in Mobeetie?
The USDA soil survey maps Texroy loam across 44 percent of Mobeetie, so a bore may pass through ground that can hold its shape but cling to the reamer. Grandfield fine sandy loam accounts for 18 percent, Devol loamy sand for 13 percent, and Mobeetie fine sandy loam for 11 percent. At about 40 inches below the surface, clay loam is mapped under 44 percent of the area, while sandy clay loam covers 24 percent. The survey maps patterns, not test borings; route conditions can differ.
| USDA soil survey, inside the Mobeetie city limits | What is mapped |
|---|---|
| Soil series mapped | Texroy 44 percent, Grandfield 19 percent, Devol 13 percent, Mobeetie 11 percent and Veal 5 percent |
| Texture at the surface | loam 44 percent, fine sandy loam 42 percent and loamy sand 13 percent |
| Texture about 40 inches down | clay loam 44 percent, sandy clay loam 24 percent and fine sandy loam 14 percent |
| Engineering class about 40 inches down | lean clay (CL) 69 percent, silty clayey sand (SC SM) 25 percent and silty sand (SM) 5 percent |
| Average clay content about 40 inches down | 22 percent |
| Bedrock mapped within 60 inches | None mapped |
| Seasonal water table within 60 inches | 0 percent of the area |
| Flood prone soils | 5 percent of the area |
| High corrosion risk for uncoated steel | 0 percent of the area |
At about 40 inches, the USDA soil survey maps an average clay content of 22 percent in Mobeetie, with sandy ground across 31 percent of the area. Those conditions call for a plan that manages clay sticking without letting sandy sections cave behind the bit. Bedrock is not mapped in the top five feet, but deeper rock is still possible. The geologic map shows the Pliocene Ogallala Formation, which includes sand, silt, clay, gravel and caliche. Seasonal water tables and high steel corrosion risk are not mapped; flood prone soils cover 5 percent, so Adobe Creek still needs site specific planning.
How is a bore run through Mobeetie’s clay loam?
We plan a Mobeetie bore around the mapped clay loam and nearby sandy soils, which behave differently as the hole opens. Adobe Creek and local street crossings also shape the route and setup.
- Texroy loam can hold an open hole and stick to the reamer, so we use thinner drilling fluid with polymer and open the bore in stages.
- Where Mobeetie’s mapped sandy soils approach the route, we build a stabilizing fluid wall and have the pipe ready before the final ream.
- Before a drill approaches marked lines near FM 48 or Dickerson Street, we hydrovac pothole each utility on the path to verify its depth.
- At Adobe Creek, we plan the bore to stay below the channel, track the drill head from the surface, and log its depth and pitch.

What does a bore have to cross on Dickerson Street in Mobeetie?
Mobeetie bores may need to pass beneath FM 48, Texas State Highway 152 or FM 1046, all of which run within the city limits. FM 48 has 1.6 mapped roadway miles in town. Dickerson Street is the longest named street at 1.54 miles, followed by 4th Street at 0.57 miles and Oklahoma Avenue at 0.55 miles. A route under one of these roads needs a layout that keeps the surface intact while accounting for the specific right of way and nearby utilities.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| FM 48 | State highway | 1.6 roadway miles inside | State highway office |
| Texas State Highway 152 | State highway | 0.5 roadway miles inside | State highway office |
| FM 1046 | State highway | 0.5 roadway miles inside | State highway office |
| Adobe Creek | Stream | 0.75 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Sweetwater Creek | Stream nearby | 0.9 miles outside | Checked for Corps of Engineers jurisdiction |
No railroad is mapped inside Mobeetie or within one mile outside its limits, so a mapped local track crossing is not part of the route picture. Adobe Creek runs for 0.75 channel miles in town, and public mapping shows two street crossings of named streams. A bore near the creek needs a route and depth planned for the channel; the crossing is also checked for U.S. Army Corps of Engineers jurisdiction during planning.
Whose permission does a Mobeetie bore under FM 48 need?
For work in the FM 48 right of way, the utility owner, not the driller, applies for a TxDOT utility permit through the online RULIS system. The TxDOT Childress District reviews the application, and we prepare the bore plan and profile for the owner’s filing. Under state accommodation rules, electric and communication lines need 60 inches of cover at highway crossings and 48 inches along the right of way. Water lines need 60 inches at crossings and 36 inches along it; pressurized sewer crossings need 60 inches. Mobeetie’s city streets belong to the city, while any Adobe Creek crossing is checked for federal jurisdiction during planning.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Who owns the buried lines in Wheeler County near Mobeetie?
The water provider for a specific Mobeetie address must be confirmed with the city, Wheeler County or the local water district before a bore is planned. EPA drinking water records do not match a provider to the town, so the address needs checking before we plan a connection or pothole. Utilities reporting electric service in Wheeler County include Southwestern Electric Power, Southwestern Public Service, Greenbelt Electric Cooperative and North Plains Electric Cooperative. We confirm the line owner for the address before planning an electric conduit bore.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| Southwestern Electric Power, Southwestern Public Service, Greenbelt Electric Cooperative and North Plains Electric Cooperative | Electric utilities reporting service in Wheeler County | EIA Form 861 | Confirm the line owner by address |
The American Community Survey 2019 to 2023 five year estimates put Mobeetie’s median housing year at 1946; 88 percent of housing units were built before 1960, and 12 percent from 1960 to 1999. That older housing stock can mean a project replaces an existing service, though each route must be checked rather than assumed. Before drilling near marked lines along Dickerson Street or elsewhere, we use hydrovac potholing to expose them; paint indicates position, not depth.

Where is Mobeetie in relation to Pampa and our Yukon yard?
Mobeetie is an incorporated city in Wheeler County, with its 0.61 square miles at an elevation of 2,674 feet and ZIP code 79061. Wheeler is 11.3 miles southeast and is the county seat; Miami is 15.7 miles northwest, and Allison is 19.3 miles east. Pampa, the nearest larger city, is 29.5 miles west. Our Yukon, Oklahoma main office is 174 road miles away, about a 3.5 hour drive, so distance is part of planning mobilization for work near FM 48 or Adobe Creek.
Places near Mobeetie
- Directional boring in Wheeler: 11.3 miles southeast
- Directional boring in Miami: 15.7 miles northwest
- Directional boring in Allison: 19.3 miles east
- Directional boring in Lefors: 21.4 miles west
- Directional boring in McLean: 22.7 miles southwest
- Directional boring in Pampa: 29.5 miles west
Which jobs call for a bore near 4th Street in Mobeetie?
- Highway crossing: A bore beneath FM 48 needs a planned route under the existing pavement and the required TxDOT utility permit.
- Water service: A connection near 4th Street starts with confirmation of the address’s water provider and exposure of marked lines.
- Fiber route: A conduit bore along Dickerson Street can keep the street surface uncut while the drill passes below the planned route.
- Creek crossing: A line beneath Adobe Creek needs a planned depth under the channel and a jurisdiction check during planning.
- Electric conduit: Before a route near Texas State Highway 152 is drilled, we confirm the line owner and pothole marked utilities.
- Sewer route: A pressurized sewer crossing at FM 1046 needs its highway cover depth addressed in the utility permit.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What drives the price of a Mobeetie bore near Adobe Creek?
An exact map pin near Adobe Creek or FM 48 helps us price a Mobeetie bore because a short route change can alter the crossing, access and ground. Share the address or pin, what will go underground, the pipe or conduit size and the footage. A sketch or plans showing the route along Dickerson Street or another local feature can clarify the scope.
For a Mobeetie route, soil and crossing conditions are key price factors: Texroy loam can affect reaming, while Adobe Creek may add planning and setup. Length, pipe or conduit size, utilities to expose, and concrete or pavement along FM 48 also matter. Pits, excavator time and sand backfill can change the work. Mobilization reflects the 174 road miles from Yukon, and high profile or emergency work may require a different scope.
Questions people ask about boring in Mobeetie
Does Trinity take directional boring work in Mobeetie and Wheeler County, and who staffs it?
Yes. We take directional boring work in Mobeetie, and our crews or crews from satellite yards run by partner drilling contractors Trinity has vetted can staff the job. The town’s Texroy loam and Adobe Creek crossings help shape the plan. At an Adobe Creek crossing, we stay involved through the bore log, whatever crew is on site.
What ground should I expect for a bore through Texroy soil in Mobeetie?
Texroy loam is the most common mapped series in Mobeetie, covering 44 percent of the city. About 40 inches down, clay loam is mapped under 44 percent, and sandy clay loam under 24 percent. Clay can grip the reamer, while sandy sections may need staged reaming to help keep the hole open.
Could a Mobeetie bore through Texroy soil encounter rock?
Bedrock is not mapped in Mobeetie’s top five feet, but that does not rule out deeper rock. The geologic map shows the Pliocene Ogallala Formation, made up of sand, silt, clay, gravel and caliche. A site check and the planned bore depth matter more than assuming the route is rock free.
Who approves a bore beneath FM 48 in Mobeetie?
The utility owner applies for the TxDOT utility permit in the online RULIS system; Trinity prepares the bore plan and profile for that application. The TxDOT Childress District reviews work on FM 48. The permit addresses cover depth and other crossing conditions for the line and location.
Can a line be bored beneath Adobe Creek in Mobeetie?
A line can be planned beneath Adobe Creek, but the route must account for the channel and its conditions. While planning a Sweetwater Creek area crossing, we check whether the work falls under US Army Corps of Engineers jurisdiction. Adobe Creek runs 0.75 channel miles through town, with two mapped street crossings of named streams.
Which electric utilities report service in Wheeler County near Mobeetie, and who sets conduit specs?
Southwestern Electric Power, Southwestern Public Service, Greenbelt Electric Cooperative and North Plains Electric Cooperative report electric service in Wheeler County. We cannot identify the provider at every Mobeetie address from an Oklahoma Avenue location alone. Confirm the specific line owner before planning a conduit bore, and get conduit requirements from that owner.
How much notice does Texas811 need before a bore on Dickerson Street in Mobeetie?
For a Dickerson Street bore, make the Texas811 locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before the start. If work slips more than 14 days past the original notice, make a new request. If marks are worn off or moved, have them refreshed before work continues.
Does Mobeetie’s distance from Yukon change a bore near Pampa?
Mobeetie is 174 road miles from our Yukon, Oklahoma main office, about a 3.5 hour drive, and Pampa is 29.5 miles west. The distance from Yukon affects mobilization planning for a job, alongside the route, soil and crossings such as FM 48 or Adobe Creek.
What affects the cost of a directional bore under FM 48 in Mobeetie?
The route and scope determine the price, including length, pipe or conduit size, Texroy loam or sandy ground, and the utilities that must be exposed. Pavement and cover requirements at FM 48, Adobe Creek crossings, pits, equipment time and mobilization from Yukon can also affect the work. There is no price that fits every route.
Where the Mobeetie facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Mobeetie
- U.S. Census Bureau, TIGER/Line 2024: Mobeetie boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Mobeetie
- U.S. Census Bureau, American Community Survey 2019 to 2023: Mobeetie housing units and year built
- Macrostrat geologic map compilation: map units under Mobeetie
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Wheeler County
- U.S. Geological Survey, Elevation Point Query Service: Mobeetie elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Mobeetie
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Mobeetie
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Mobeetie, Texas
Type the address of your job in Mobeetie. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Mobeetie
Same county: Shamrock. All counties: Texas county list.
