trinityboringsolutions.com

Placedo Texas Directional Boring: Dacosta Clay, US 87 and Ninemile Creek

Quick Answer: Placedo’s Dacosta sandy clay loam can hold an open hole and cling to a reamer, so fluid control matters. Along Ninemile Creek and US 87, Trinity Boring Solutions takes directional boring, also called horizontal directional drilling (HDD), work in Placedo, Texas. Placedo is 513 road miles from our Yukon, Oklahoma main office, and Union Pacific track is another route feature to plan around. At about 40 inches, Dacosta soil is mapped as clay with 44 percent average clay content; sticky cuttings can build on the reamer.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Placedo bores at a glance

  • Unincorporated community in Victoria County, Texas. Population 625 (2020 Census count).
  • Road distance from our Yukon, Oklahoma main office: 513 miles, about 10.3 hours of driving.
  • Ground: Dacosta soil is mapped on 100 percent of the area, with clay about 40 inches down.
  • Rock: no bedrock is mapped in the top 60 inches.
  • Highways inside the boundary: US 87 and FM 616. State permit office: TxDOT Yoakum District.
  • Railroad track inside the boundary: Union Pacific, with 3 mapped street and rail crossings.
  • Named streams inside the boundary: Ninemile Creek.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who does directional boring near Ninemile Creek in Placedo?

Dacosta sandy clay loam in Placedo can hold an open hole and cling to a reamer, and we take directional boring work here. Placedo is in Victoria County, and the Census Bureau counted 625 residents in the 2020 Census. Along Williams Street, Commerce Street and US 87, our crews can install water, sewer, gas, electric conduit and fiber lines by bore where the route calls for an underground crossing.

Our main office is in Yukon, Oklahoma, and Placedo work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our longest bore reached roughly 4,100 feet with 48 inch pipe under the Arkansas River in Tulsa, Oklahoma. That is far beyond a typical Placedo service crossing near Ninemile Creek; our family business began in 1965 and has done directional boring since 1982.

Compact Ditch Witch drill rig boring a new utility line across a front yard on a residential street in Edmond, Oklahoma
Our compact Ditch Witch drill boring a new utility line across a front yard on a residential street in Edmond, Oklahoma. Photos on this page are from our jobs in Oklahoma and Texas.

What does the soil survey show about Dacosta soil in Placedo?

The USDA soil survey maps Dacosta soil across all of Placedo, with sandy clay loam at the surface and clay at about 40 inches. Dacosta sandy clay loam, 0 to 1 percent slopes, covers 32 percent of the mapped area; the Dacosta Urban land complex covers 67 percent. At that depth, the survey maps clay across the area and estimates average clay content at 44 percent. We treat Placedo soil patterns as mapping guidance, not test borings, before setting a bore path. The sticky ground can ball up on a reamer and grip pipe.

USDA soil survey, inside the Placedo mapped community boundaryWhat is mapped
Soil series mappedDacosta 100 percent
Texture at the surfacesandy clay loam 100 percent
Texture about 40 inches downclay 100 percent
Engineering class about 40 inches downfat clay (CH) 100 percent
Average clay content about 40 inches down44 percent
Bedrock mapped within 60 inchesNone mapped
Seasonal water table within 60 inches0 percent of the area
Flood prone soils0 percent of the area
High corrosion risk for uncoated steel100 percent of the area

The USDA soil survey does not map bedrock within 60 inches in Placedo, but that says nothing about deeper layers. A seasonal water table within that depth is not mapped, and flood prone soils are not mapped. High steel corrosion risk is mapped across the area, so the line owner should consider casing and tracer wire materials; HDPE is not affected by that soil concern. The geologic map names Delta sand and silt of Late Pleistocene age, a mix that includes sand, silt, clay and gravel.

What does it take to bore through clay in Placedo?

Dacosta clay in Placedo calls for a controlled drilling fluid plan and staged reaming. The sticky cuttings can cling to the tool, while heavy clay needs careful fluid returns near pavement on US 87.

  1. Dacosta clay can build on the reamer, so we use thinner fluid with polymer and enlarge the hole in stages before pulling pipe.
  2. With heavy clay beneath Placedo, we watch fluid returns near US 87 so pressure does not lift pavement.
  3. Before drilling near Williams Street, we hydrovac expose each marked utility on the route; paint shows its position, not its depth.
  4. We track the drill head from the surface and log depth and pitch, including on routes toward Ninemile Creek.
Drilling fluid returns at the entry as the Vermeer D24x40 S3 drills a 385 foot sandstone rock bore in Guthrie, Oklahoma
Drilling fluid coming back to the entry pit as our Vermeer D24x40 drills a 385 foot bore in Guthrie, Oklahoma.

What does a bore have to cross near US 87 in Placedo?

A Placedo bore may cross US 87 or FM 616, the two highways mapped inside the community boundary. US 87 has 1.1 mapped roadway miles here and FM 616 has 0.8. Old Port Lavaca Road, Commerce Street and Williams Street are among the longest named local streets. A route beneath existing highway pavement needs boring or tunneling rather than an open trench. The route plan should account for pavement, driveways and the access needed for pits on either side.

CrossingTypeMapped extentWho has a say
US 87US highway1.1 roadway miles insideState highway office
FM 616State highway0.8 roadway miles insideState highway office
Union PacificRailroad1.93 track miles insideThe railroad
Ninemile CreekStream0.99 channel miles insideChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

Union Pacific track runs 1.93 miles inside Placedo, with 3 mapped street and rail crossings. A route beneath that track needs an agreement from Union Pacific, which sets the crossing conditions. Ninemile Creek runs 0.99 channel miles through the community, and 2 mapped street crossings intersect named streams. Creek work needs a check for U.S. Army Corps of Engineers jurisdiction during planning. With no lakes or ponds mapped within one mile, we can assess surface access for boring in Placedo.

Do I need a permit to bore in Victoria County in Placedo?

Placedo has no city government, so responsibility for a street bore rests with the county or the state, depending on the route. For work in the right of way of US 87 or FM 616, the utility owner files the TxDOT utility permit through RULIS; the TxDOT Yoakum District reviews it. We prepare the bore plan and profile for the utility owner’s application and work under the permit issued to that owner. TxDOT rules set cover depths of 60 inches for water and electric or communication lines crossing a highway, and 60 inches for pressurized sewer crossings. Union Pacific must agree to a track crossing, and a Ninemile Creek route is checked for federal jurisdiction during planning.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

What is already in the ground in Victoria County in Placedo?

Before planning a bore for a Placedo address, we confirm the provider with the county or local water district. EPA drinking water records do not match a provider to the community. AEP Texas Central, Guadalupe Valley Electric Cooperative and Victoria Electric Cooperative report electric service in Victoria County; the line owner for the address must be confirmed before planning a conduit bore near Williams Street or US 87.

Line ownerWhat it isSourceSize
AEP Texas Central, Guadalupe Valley Electric Cooperative and Victoria Electric CooperativeElectric utilities reporting service in Victoria CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

The 2019 to 2023 five year estimates place Placedo’s median housing year at 1966, so we verify underground utilities before boring. The estimates place 19 percent of housing before 1960, 64 percent from 1960 to 1999 and 17 percent in 2000 or later. Those figures do not establish the age of a particular buried line, but a bore near Commerce Street could serve either a replacement or a new connection. We hydrovac pothole marked utilities on the route before drilling near them, since surface marks do not show depth.

Coiled black HDPE conduit fitted with a pulling grip staged on a lawn along a completed bore path
Coiled HDPE conduit fitted with a pulling grip, staged on a lawn along a finished bore path.

Do you cover Placedo and nearby Port Lavaca?

Placedo is an unincorporated community in Victoria County, at an elevation of 52 feet and with 0.56 square miles of mapped land. For work in Placedo ZIP codes 77977 and 77905, we verify the address before laying out underground boring. Bloomington is 5.4 miles southwest, while Port Lavaca is 13.0 miles southeast and Victoria, the county seat, is 13.5 miles northwest. Port Lavaca is the nearest larger city. From our Yukon, Oklahoma main office, Placedo is 513 road miles away, a 10.3 hour drive, so distance is part of planning a crew mobilization for a US 87 or Ninemile Creek route.

Places near Placedo

What boring work comes up along Old Port Lavaca Road in Placedo?

  • Highway crossing: A bore beneath US 87 or FM 616 needs a planned route under existing pavement, with pits outside the travel lanes.
  • Street service: A water or sewer connection along Commerce Street can run beneath the road without cutting the pavement.
  • Fiber conduit: A fiber route near Williams Street can use a bore to pass marked utilities after they are exposed.
  • Creek crossing: A route beneath Ninemile Creek needs depth planning and a check for U.S. Army Corps of Engineers jurisdiction.
  • Rail crossing: A bore beneath Union Pacific track needs the railroad’s agreement for the crossing.
  • Replacement service: A bore near Old Port Lavaca Road can connect a replacement line while leaving the road surface uncut.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

How do I get a quote for a Placedo bore near Union Pacific?

For a Placedo quote, send the address or map pin, what is going in the ground, the pipe or conduit size and footage, with a sketch or plans if available. A route near Union Pacific or Old Port Lavaca Road helps us identify the crossings, access and space for entry and exit pits before we price the work.

A short, direct route through Dacosta soil with open access is simpler to plan than a path with several exposed utilities or restricted pits. The price depends on length, pipe or conduit size, soil conditions, crossings, pavement, creek work, pit and excavator needs, backfill and mobilization. Heavy clay can add reaming and fluid control needs; a US 87 or Union Pacific crossing adds coordination, and the 513 road miles from Yukon affect mobilization planning.

Questions people ask about boring in Placedo

Does Trinity take directional boring work in Placedo and Victoria County, and how is it staffed?

Yes, we take directional boring work in Placedo, Victoria County. Our crews do the work, and vetted partner drilling contractors may provide satellite yard support. You work with Trinity from the first call through the bore log, whichever crew is at the site. A route near Ninemile Creek is planned around its ground and crossing conditions.

Who owns electric lines in Placedo, Victoria County, and who confirms conduit specifications?

AEP Texas Central, Guadalupe Valley Electric Cooperative and Victoria Electric Cooperative report service in Victoria County, but that does not identify the provider at every Placedo address. Confirm the line owner for the specific route before planning a conduit bore near US 87. The line owner can confirm the conduit requirements for its project.

Who is responsible for Williams Street in Placedo, and does a bore require cutting it?

Placedo is unincorporated and has no city government, so Williams Street responsibility falls to the county or state according to the road. Directional boring can pass beneath the street without cutting its surface, with entry and exit pits placed off the traveled area when the route allows. Confirm the road authority before planning the work.

How old are buried lines near Commerce Street in Placedo, and can a bore replace them?

A bore can be planned for a replacement line near Commerce Street, but the local housing figures do not date any specific buried utility. The American Community Survey 2019 to 2023 estimates give Placedo a median housing year of 1966, with 19 percent built before 1960. We expose marked lines along the bore path before drilling close to them.

Does Dacosta soil in Placedo corrode steel, and what pipe should I use?

The USDA soil survey maps high steel corrosion risk throughout Placedo’s Dacosta soils. The line owner should choose materials and any coating for steel casing or tracer wire. We account for Placedo’s soil corrosion concern, which does not affect HDPE. The material decision should be made for the specific line planned near a street such as Commerce Street.

What ground will a bore pass through in Placedo’s Dacosta soil?

The USDA soil survey maps Dacosta soil across Placedo, with sandy clay loam at the surface and clay at about 40 inches. It estimates average clay content at 44 percent at that depth. Sticky clay can ball up on the reamer and grip pipe, so a bore near Old Port Lavaca Road may need staged reaming and careful fluid control.

What bore sizes and lengths can Trinity handle near Houston Street in Placedo?

We handle Placedo work from 3/4 inch service lines up to 48 inch casing, with bore lengths from 10 feet to 5,000 feet. The actual size and length near Houston Street depend on what the line must cross and the available route. A map pin and project details help us assess the crossing.

How early should I call Texas811 for a Placedo bore near Old Port Lavaca Road?

For a bore near Old Port Lavaca Road, submit the Texas811 locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays; Texas811 describes this as two working days. Request it no earlier than 14 days before the start. If the start slips more than 14 days past the original notice, make a new request, and refresh worn or moved marks through Texas811 before work continues.

Under US 87 in Placedo, what affects directional bore cost?

Length, line size, Dacosta clay, utility crossings, pavement, pits and mobilization all affect a Placedo bore’s price. A route beneath US 87 needs highway planning, and heavy clay can require staged reaming and close fluid control. Union Pacific or Ninemile Creek crossings add their own coordination and site conditions.

Where the Placedo facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Placedo

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Placedo, Texas

Type the address of your job in Placedo. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Placedo

Same county: Quail Creek. All counties: Texas county list.