Wheeler Texas Directional Boring: Grandfield Fine Sandy Loam, US 83, Silver Creek
Quick Answer: We take directional boring and horizontal directional drilling (HDD) work in Wheeler, Texas, where a bore may need to pass beneath US 83. The 162 road miles from our Yukon yard shape mobilization for work near Oklahoma Avenue. Grandfield soil and sandy clay loam below the surface call for controlled reaming and a ready pipe pull. Routes near Silver Creek need their own crossing review.
Wheeler bores at a glance
- County seat of Wheeler County, Texas. Population 1,449 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 162 miles, about 3.2 hours of driving.
- Ground: Grandfield soil is mapped on 71 percent of the area, with sandy clay loam about 40 inches down.
- Rock: no bedrock is mapped in the top 60 inches.
- Highways inside the boundary: US 83, Texas State Highway 152 and FM 2473. State permit office: TxDOT Childress District.
- Railroad track inside the boundary: none mapped.
- Public water: Wheeler Municipal Water System, groundwater wells.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Which contractor handles directional boring near US 83 in Wheeler?
Trinity Boring Solutions takes directional boring work in Wheeler, the Wheeler County seat, where the Census Bureau Vintage 2024 estimate puts the population at 1,449. US 83 is a key route to plan around when water, sewer, gas, electric conduit or fiber must reach properties across town. The line type and route determine the bore plan, including how we handle the highway or nearby streets.
Our main office is in Yukon, Oklahoma, and Wheeler work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. A 3/4 inch service line and a 48 inch casing mark the ends of our size range for routes near Oklahoma Avenue. Our family business began in 1965 and has done directional boring since 1982; Wheeler is 162 road miles from our Yukon main office.

What is Grandfield soil like to bore through in Wheeler?
Grandfield soil is the main mapped series in Wheeler, covering 71% of the city area in the USDA soil survey. At the surface, the survey maps loamy sand across 50% and fine sandy loam across 45%. About 40 inches down, sandy clay loam covers 70% of the mapped area, while the sandy share at that depth is 29%. Grandfield, Devol, and Sweetwater are mapped soil patterns, not test borings, so we use them only as planning context for Wheeler. The change from loose surface soils to firmer material below can affect steering and how we keep the bore open.
| USDA soil survey, inside the Wheeler city limits | What is mapped |
|---|---|
| Soil series mapped | Grandfield 71 percent, Devol 20 percent and Sweetwater 3 percent |
| Texture at the surface | loamy sand 50 percent, fine sandy loam 45 percent and silty clay loam 3 percent |
| Texture about 40 inches down | sandy clay loam 70 percent, fine sandy loam 13 percent and loamy fine sand 10 percent |
| Engineering class about 40 inches down | lean clay (CL) 41 percent, clayey sand (SC) 30 percent and silty clayey sand (SC SM) 22 percent |
| Average clay content about 40 inches down | 18 percent |
| Bedrock mapped within 60 inches | None mapped |
| Seasonal water table within 60 inches | 3 percent of the area |
| Flood prone soils | 5 percent of the area |
| High corrosion risk for uncoated steel | 3 percent of the area |
The USDA soil survey maps bedrock in none of Wheeler’s top five feet, but that does not rule out rock deeper down; the geologic map shows Eolian Sheet Sand of Quaternary age and Cenozoic sedimentary rocks of Paleocene age. Seasonal water table is mapped within 60 inches across 3%, so pits may need pumping. Flood prone soils cover 5%, a point to check near Silver Creek. High steel corrosion risk covers 3%, so the line owner should consider casing and tracer wire materials.
How do we plan a bore through Wheeler’s sandy clay loam on US 83?
Wheeler’s sandy clay loam and loose surface soils call for staged reaming, steady tracking and pipe ready for the pull. We adjust the fluid and pace to the ground along each route.
- We use staged reaming in Wheeler’s loamy sand so the hole has support as the loose surface ground can fall in behind the bit.
- Where the route reaches sandy clay loam about 40 inches down, we watch fluid and steering, then have the pipe ready for the final ream.
- Before drilling near a marked utility along Oklahoma Avenue, we expose it with hydrovac potholing because paint shows position, not depth.
- We track the drill head from the surface and log depth and pitch on routes near US 83, keeping the bore profile tied to the crossing.

What is in the way of a new line near US 83 in Wheeler?
US 83, Texas State Highway 152 and FM 2473 run through Wheeler, so routes that cross their pavement need a bore plan rather than an open cut. Oklahoma Avenue is the longest named street at 1.75 miles in the city. Alan L Bean Boulevard runs 1.51 miles, and Stanley Street runs 1.39 miles. The exact route matters: a line running along a street has different access and clearance needs from a crossing beneath it.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| US 83 | US highway | 1.5 roadway miles inside | State highway office |
| Texas State Highway 152 | State highway | 1.8 roadway miles inside | State highway office |
| FM 2473 | State highway | 1.2 roadway miles inside | State highway office |
| Silver Creek | Stream nearby | 0.1 miles outside | Checked for Corps of Engineers jurisdiction |
No railroad is mapped inside Wheeler or within one mile outside its limits, so there is no mapped track route to plan around. Silver Creek is 0.1 miles from the city limits, not inside them; the records map no named stream crossing of a city street. Wheeler County maps show no lakes or ponds within one mile, helping us assess water features along a planned bore route. If a proposed line reaches Silver Creek, we review the channel route and check for federal water jurisdiction during planning.
Who approves a bore under roads in Wheeler County?
For work in the US 83, Texas State Highway 152 or FM 2473 right of way, TxDOT handles the utility permit through its Childress District. The utility that owns the line submits the application in TxDOT’s RULIS system; we prepare the bore plan and profile for that filing and work under the owner’s permit. TxDOT rules call for boring or tunneling beneath existing highway pavement, with highway crossings encased and extending beneath all travel lanes on rural highways. Wheeler’s city streets belong to the city itself. A route reaching Silver Creek is checked for U.S. Army Corps of Engineers jurisdiction during planning.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Who owns the Wheeler Municipal Water System and other lines?
Wheeler Municipal Water System is locally owned and draws water from groundwater wells. Public records list 754 service connections and 1,602 people served, so a water route may need to tie into an existing local network. Southwestern Electric Power, Southwestern Public Service, Greenbelt Electric Cooperative and North Plains Electric Cooperative report service in Wheeler County. Before planning an electric conduit bore on Oklahoma Avenue, we confirm the line owner for that specific address.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| Wheeler Municipal Water System | Public water system | Groundwater wells | 754 connections, 1,602 people served |
| Southwestern Electric Power, Southwestern Public Service, Greenbelt Electric Cooperative and North Plains Electric Cooperative | Electric utilities reporting service in Wheeler County | EIA Form 861 | Confirm the line owner by address |
The American Community Survey 2019 to 2023 five year estimates put Wheeler’s median housing year at 1965; 46% of homes were built before 1960, while 17% date from 2000 or later. That mix can mean both replacement work and newer service connections along Oklahoma Avenue. Along US 83, we hydrovac pothole every marked utility on the bore path before drilling near it. For example, a marked line under Oklahoma Avenue must be exposed to confirm its depth before the drill approaches.

How far is Wheeler from Pampa and our Yukon yard?
Wheeler is in Wheeler County, the county seat, at an elevation of 2,524 feet and covers 1.53 square miles. Its ZIP code is 79096. Mobeetie is 11.3 miles northwest, Allison is 15.0 miles northeast, and Shamrock is 15.7 miles south. Pampa, the nearest larger city, is 39.5 miles west. From our Yukon yard, Wheeler is 162 road miles away and a 3.2 hour drive, which is part of planning crew and equipment mobilization for work near US 83.
Places near Wheeler
- Directional boring in Mobeetie: 11.3 miles northwest
- Directional boring in Allison: 15 miles northeast
- Directional boring in Shamrock: 15.7 miles south
- Directional boring in McLean: 23.3 miles southwest
- Directional boring in Miami: 26.9 miles northwest
- Directional boring in Pampa: 39.5 miles west
What boring work comes up along Oklahoma Avenue in Wheeler?
- Highway crossing: A bore beneath US 83 needs a planned route under the pavement, with the utility owner’s permit in place for work in the right of way.
- Water service: A connection near the Wheeler Municipal Water System may require a route through sandy surface soils before reaching the existing groundwater well network.
- Street conduit: A fiber or electric conduit route under Oklahoma Avenue can avoid cutting the street, with marked utilities exposed before the drill approaches.
- Creek crossing: A route near Silver Creek needs channel review if it crosses the creek, including a check for U.S. Army Corps of Engineers jurisdiction.
- State road route: A line crossing Texas State Highway 152 or FM 2473 needs a bore plan that accounts for TxDOT right of way and pavement.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What do you need to quote a Wheeler bore near Silver Creek?
A map pin matters near Silver Creek because the crossing location determines whether the route reaches the channel or stays within Wheeler’s streets. For a Main Street request, we need the address or pin, what will go underground, the pipe or conduit size and the footage. A sketch or plans help us see how the route meets Oklahoma Avenue or another access point.
The job scope sets the price: Grandfield loamy sand and sandy clay loam affect drilling and reaming, while a crossing beneath US 83 adds highway planning. We also account for length, pipe size, marked utilities to expose, pavement, pits, sand backfill and equipment time. Silver Creek can add crossing review, and the 162 road miles from Yukon affect mobilization. On Texas State Highway 152, high profile or emergency work can change how we plan and coordinate with TxDOT Childress District.
Questions people ask about boring in Wheeler
Does Trinity take directional boring jobs in Wheeler County?
Yes, Trinity Boring Solutions takes directional boring work in Wheeler County, including routes near US 83 and Oklahoma Avenue. Our crews handle the work, with support from satellite yards run by partner drilling contractors we have vetted. Customers work with Trinity from the first call through the bore log, whichever crew is on site.
What ground should I expect for a Wheeler bore through Grandfield soil?
The USDA soil survey maps Grandfield across 71% of Wheeler, with sandy clay loam mapped over 70% of the area about 40 inches down. Loamy sand and fine sandy loam are common at the surface. Loose sand can cave behind the bit, so we use staged reaming and keep the pipe ready for the pull.
Will our Wheeler bore through Grandfield soils hit rock?
Bedrock is not mapped in Wheeler’s top five feet, though deeper rock is still possible. The geologic map shows Quaternary Eolian Sheet Sand and Paleocene Cenozoic sedimentary rocks. We plan from the route and available ground information rather than treating the map as a site test, including for bores near FM 2473.
Who approves a Wheeler bore beneath US 83?
TxDOT reviews a utility permit for work in the US 83 right of way through its Childress District. The utility owner files in the RULIS system, and we prepare the bore plan and profile for its application. A crossing beneath existing highway pavement is bored or tunneled, with cover and casing addressed in the permit.
Can a Wheeler utility line be bored beneath Silver Creek?
A bore can be planned for a Silver Creek crossing, but the route needs review for the channel and possible U.S. Army Corps of Engineers jurisdiction. Silver Creek is mapped 0.1 miles from Wheeler’s limits, rather than inside them. The specific entry and exit points determine the crossing plan.
Who runs Wheeler’s public water system, and where does its water come from when we plan a bore on US 83?
The local government owns Wheeler Municipal Water System, which gets water from groundwater wells. Wheeler’s public records list 754 service connections and 1,602 people served, figures we consider when planning underground utility work. For a bore near the system, we confirm the line and tie in location before setting the route along streets such as Oklahoma Avenue.
How far is Wheeler from Yukon, and does Pampa change mobilization?
Wheeler is 162 road miles and a 3.2 hour drive from our Yukon yard. Pampa is 39.5 miles west of Wheeler, but it does not change the measured route from Yukon. Distance is part of mobilization planning for work near US 83, along with the equipment and crew the bore requires.
How early should I request a Wheeler locate near Oklahoma Avenue?
Count back at least two working days from the planned start near Oklahoma Avenue, excluding Saturdays, Sundays and legal holidays; do not request the locate more than 14 days ahead. Texas811 describes the notice as at least two working days. If the start slips more than 14 days past the original notice, make a new request, and refresh worn or moved marks before work continues.
What affects the cost of a Wheeler directional bore under US 83?
The scope sets the price, including length, pipe size, Grandfield soil conditions and the utilities that must be exposed. A crossing under US 83 adds highway planning, while pavement, pits, backfill and equipment time also matter. Silver Creek review or mobilization from Yukon can affect the job plan as well; the route details determine the factors involved.
Where the Wheeler facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Wheeler
- U.S. Census Bureau, TIGER/Line 2024: Wheeler boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Wheeler
- U.S. Census Bureau, American Community Survey 2019 to 2023: Wheeler housing units and year built
- Macrostrat geologic map compilation: map units under Wheeler
- U.S. EPA Safe Drinking Water Information System: public water systems serving Wheeler
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Wheeler County
- U.S. Geological Survey, Elevation Point Query Service: Wheeler elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Wheeler
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Wheeler
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Wheeler, Texas
Type the address of your job in Wheeler. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Wheeler
All counties: Texas county list.
