Fort Stockton Texas Directional Boring: Reakor Soil, Interstate 10 and Texas Pacifico
Quick Answer: Interstate 10 is the main obstacle for a utility route, and Trinity Boring Solutions handles directional boring, also called horizontal directional drilling (HDD), in Fort Stockton, Texas. Fort Stockton sits 547 road miles from our Yukon, Oklahoma main office, with Texas Pacifico tracks also shaping crossing plans. Reakor silty clay loam covers 36% of mapped ground and can cling to a reamer, so staged passes and a timely pipe pull matter. Coyanosa is one nearby service point beyond the city.
Fort Stockton bores at a glance
- County seat of Pecos County, Texas. Population 8,147 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 547 miles, about 10.6 hours of driving.
- Ground: Reakor soil is mapped on 51 percent of the area, with silty clay loam about 40 inches down.
- Rock: bedrock is mapped within 60 inches on 3 percent of the area.
- Highways inside the boundary: Interstate 10, Interstate 10 Business, US 67, US 285 and US 385. State permit office: TxDOT Odessa District.
- Railroad track inside the boundary: Texas Pacifico, with 11 mapped street and rail crossings.
- Named streams inside the boundary: Comanche Creek.
- Public water: City of Fort Stockton, groundwater wells.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Who can I call for directional boring near Dickinson Boulevard in Fort Stockton?
Trinity Boring Solutions takes directional boring work in Fort Stockton, where Interstate 10 is a key route to cross without opening pavement. The Census Bureau Vintage 2024 estimate puts Pecos County seat Fort Stockton at 8,147 residents. We bore water, sewer, gas, electric conduit and fiber routes along streets such as Dickinson Boulevard and Railroad Avenue, keeping pavement and driveways intact where the plan allows.
Our main office is in Yukon, Oklahoma, and Fort Stockton work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. For the City of Fort Stockton groundwater system and routes served by electric providers reporting in Pecos County, our record is more than 25 years without a utility strike. This family business began in 1965, and we have done directional boring since 1982.

What ground should we expect when drilling in Fort Stockton Reakor soil?
The USDA soil survey maps Reakor soil across 51% of Fort Stockton and Upton soil across 41%, with Lozier covering 3%. Reakor silty clay loam, 0 to 1 percent slopes, accounts for 36% of mapped area. Silty clay loam makes up 55% of surface texture, and the survey maps it across 56% of the area at about 40 inches below the surface. Average clay content at that depth is 26%, so sticky cuttings can collect on the reamer.
| USDA soil survey, inside the Fort Stockton city limits | What is mapped |
|---|---|
| Soil series mapped | Reakor 51 percent, Upton 41 percent and Lozier 3 percent |
| Texture at the surface | silty clay loam 55 percent, gravelly loam 25 percent and gravelly clay loam 16 percent |
| Texture about 40 inches down | silty clay loam 56 percent, very gravelly loam 41 percent and bedrock 3 percent |
| Engineering class about 40 inches down | lean clay (CL) 55 percent and clayey gravel (GC) 41 percent |
| Average clay content about 40 inches down | 26 percent |
| Bedrock mapped within 60 inches | 3 percent of the area (3 percent hard rock, 0 percent weathered rock) |
| Seasonal water table within 60 inches | 1 percent of the area |
| Flood prone soils | 1 percent of the area |
| High corrosion risk for uncoated steel | 3 percent of the area |
The survey maps bedrock within 60 inches across 3% of Fort Stockton, with a typical mapped depth of 5 inches, so a route can encounter shallow rock in limited areas. Seasonal water tables within 60 inches and flood prone soils each cover 1%; plan pits and creek depth for those mapped spots. High steel corrosion risk covers 3%, which calls for the line owner to consider casing and tracer wire materials. The geologic map shows Holocene alluvium along streams and Paleocene Cenozoic sedimentary rocks.
How do we plan a Fort Stockton bore through silty clay loam?
For Fort Stockton’s silty clay loam, we keep the bore controlled through staged reaming and manage fluid so sticky soil does not load the tool or lift nearby pavement.
- Reakor silty clay loam can cling to the reamer, so we use thinner drilling fluid with polymer and make staged passes before pulling pipe.
- At mapped Upton gravelly loam areas, gravel can deflect the drill head; we check depth and pitch as each rod advances.
- We pothole each marked utility on the bore path before drilling near it, then track the head from the surface and log depth and pitch.
- For a planned bore beneath 14th Street, we set pits off the pavement and expose marked lines first so the road surface stays uncut.

Where might a line go under Texas Pacifico in Fort Stockton?
Interstate 10, US 67, US 285 and US 385 run through Fort Stockton, so highway routes can call for a bore beneath pavement and right of way. Dickinson Boulevard is the longest named street at 4.07 miles in the city, followed by Railroad Avenue at 3.77 miles and 9th Street at 3.26 miles. A route along these streets needs utility locations and access planned before pits are set, especially where a bore has to pass beneath an existing road.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| Interstate 10 | Interstate | 11.2 roadway miles inside | State highway office |
| Interstate 10 Business | Interstate | 4.3 roadway miles inside | State highway office |
| US 67 | US highway | 11.2 roadway miles inside | State highway office |
| US 285 | US highway | 4.2 roadway miles inside | State highway office |
| US 385 | US highway | 3.2 roadway miles inside | State highway office |
| FM 1053 | State highway | 1.7 roadway miles inside | State highway office |
| Texas State Highway 18 | State highway | 1 roadway miles inside | State highway office |
| Spur 194 | State highway | 0.4 roadway miles inside | State highway office |
| Texas Pacifico | Railroad | 2.3 track miles inside | The railroad |
| Comanche Creek | Stream | 0.4 channel miles inside | Checked for Corps of Engineers jurisdiction |
Texas Pacifico has 2.3 track miles inside Fort Stockton, and public records map 11 street and rail crossings. A crossing plan needs the railroad owner’s agreement and must follow its conditions for casing, depth and flagging. Comanche Creek has 0.4 channel miles in the city, with five mapped street crossings of named streams. Creek work needs a depth plan, and its jurisdiction is checked during planning; no lakes or ponds are mapped within one mile.
Who approves a bore under Interstate 10 in Fort Stockton?
For an Interstate 10 bore in Fort Stockton, the TxDOT Odessa District reviews the utility owner’s application for work in the highway right of way. The line owner files through TxDOT’s RULIS system; we prepare the bore plan and profile and work under the owner’s permit. TxDOT rules call for boring or tunneling beneath existing highway pavement, with encased crossings and the bore extending beneath all travel lanes on rural highways. A Texas Pacifico crossing also needs the railroad owner’s agreement. For Comanche Creek, planning checks whether the U.S. Army Corps of Engineers has jurisdiction.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Whose lines are already buried in Fort Stockton, Pecos County?
The City of Fort Stockton public water system draws from groundwater wells and reports 6,569 service connections serving 8,142 people. Electric service reported in Pecos County includes AEP Texas North, Oncor Electric Delivery Company, Texas-New Mexico Power, Rio Grande Electric Cooperative and Southwest Texas Electric Cooperative. At Dickinson Boulevard addresses, we confirm the electric line owner before planning a conduit bore, since service may vary.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| City of Fort Stockton | Public water system | Groundwater wells | 6,569 connections, 8,142 people served |
| AEP Texas North, Oncor Electric Delivery Company, Texas-New Mexico Power, Rio Grande Electric Cooperative and Southwest Texas Electric Cooperative | Electric utilities reporting service in Pecos County | EIA Form 861 | Confirm the line owner by address |
The American Community Survey 2019 to 2023 five year estimates put Fort Stockton’s median housing year at 1974; 27% of homes were built before 1960, while 16% date to 2000 or later. A replacement route near 9th Street may have older services to locate, while newer construction may need a new connection. We hydrovac pothole each marked utility on the planned path before drilling near it; paint shows position, not depth. For example, a proposed line beneath Dickinson Boulevard needs exposed crossings before the drill approaches.

What places near Fort Stockton can our crews reach, including Coyanosa?
Fort Stockton is the Pecos County seat, covers 5.55 square miles and sits at an elevation of 2,984 feet. Fort Stockton is served by ZIP code 79735, which helps us organize underground work planning. Coyanosa is 26.3 miles northwest; Imperial is 28.2 miles northeast; Grandfalls is 31.0 miles north; and McCamey is 42.7 miles northeast. The Yukon yard is 547 road miles away, a 10.6 hour drive, so distance is part of planning mobilization for a job near Interstate 10 or outside the city limits.
Places near Fort Stockton
- Directional boring in Coyanosa: 26.3 miles northwest
- Directional boring in Imperial: 28.2 miles northeast
- Directional boring in Grandfalls: 31 miles north
- Directional boring in McCamey: 42.7 miles northeast
What boring work comes up near Railroad Avenue in Fort Stockton?
- Highway crossing: A route beneath Interstate 10 needs a bore plan that accounts for the pavement, right of way and travel lanes.
- Water service: A connection near the City of Fort Stockton water system needs the line owner and existing groundwater service route identified.
- Fiber route: A fiber bore along Dickinson Boulevard can pass beneath pavement, with marked utilities exposed before drilling near them.
- Rail crossing: A Texas Pacifico track crossing needs the railroad owner’s agreement and a plan for its casing, depth and flagging conditions.
- Creek crossing: A Comanche Creek route needs a depth plan beneath the channel and a jurisdiction check during planning.
- Street replacement: A service near 9th Street can be bored to avoid opening the street while old and new lines are located.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
How do I get a quote for work near 14th Street in Fort Stockton?
For a bore near 14th Street, send the address or map pin, what will go in the ground, the pipe or conduit size and the footage; a sketch or plans help. The route matters here: note any nearby Interstate 10 pavement, Texas Pacifico track or Comanche Creek crossing so we can understand access and the proposed path.
The 547 road miles from Yukon affect mobilization for a Fort Stockton job. Reakor silty clay loam can change reaming and fluid needs, while a Texas Pacifico crossing or Interstate 10 pavement adds crossing and permit planning. We also account for bore length, pipe size, marked utilities to expose, concrete, pits, excavator time, sand backfill and creek or drainage crossings. For high profile or emergency work in Fort Stockton, we build added planning into the bore schedule.
Questions people ask about boring in Fort Stockton
Does Trinity Boring Solutions take directional boring work in Fort Stockton and Pecos County?
Yes, we take directional boring work in Fort Stockton and across Texas. Work in Pecos County is carried out by our own crews and from satellite yards run by partner drilling contractors we have vetted. You work with Trinity from the first call through the bore log, whether the route is near Interstate 10 or elsewhere in the county.
Who controls Fort Stockton streets, and can a bore avoid cutting 9th Street?
Because Fort Stockton is incorporated, we coordinate street bore planning with the city for its streets. A directional bore beneath 9th Street can keep the pavement uncut when the route, access and ground allow; pits sit in the dirt on either side. We locate and expose marked utilities before the drill gets close to them.
How do Fort Stockton homes near Railroad Avenue affect replacement bores?
Older housing can mean a replacement bore needs careful utility locating before we work near Railroad Avenue. The American Community Survey 2019 to 2023 estimates give a median year built of 1974; 27% of homes were built before 1960 and 16% in 2000 or later. That mix can mean replacement work as well as new service connections.
What does Reakor soil mean for a bore in Fort Stockton?
Reakor soil is widespread in Fort Stockton, and the USDA soil survey maps silty clay loam across 56% of the area at about 40 inches below the surface. Sticky clay can build on a reamer, so staged passes and a planned pipe pull help keep the hole workable. The survey maps soil patterns, not test borings.
Will a Fort Stockton bore hit rock near Comanche Creek?
It may encounter shallow rock in limited areas, but the USDA soil survey maps bedrock within 60 inches across 3% of Fort Stockton. The geologic map also shows Holocene alluvium along streams and Paleocene Cenozoic sedimentary rocks. A route near Comanche Creek still needs site specific planning because mapped ground does not establish conditions at each bore.
Who approves a Fort Stockton bore under Interstate 10?
The utility owner applies for a TxDOT utility permit, and the TxDOT Odessa District reviews work in the Interstate 10 right of way. The owner files through RULIS; we supply the bore plan and profile for its application. TxDOT rules call for boring or tunneling under existing highway pavement and an encased crossing.
Does Trinity cover Coyanosa and rural sites outside Fort Stockton?
Yes, we take work beyond Fort Stockton, including routes toward Coyanosa, 26.3 miles northwest, and rural sites in Pecos County. The address and route help us plan the crew and mobilization, particularly when a job is far from the Yukon yard. Our service area includes Oklahoma and Texas.
How early should I request utility marks for a Fort Stockton bore on Dickinson Boulevard?
For a Dickinson Boulevard start, count back at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and do not request marks more than 14 days early. Texas811 describes this as at least two working days. If work slips more than 14 days past the original notice, make a new request; refresh worn or moved marks through Texas811 before continuing.
What affects the cost of directional boring near Interstate 10 in Fort Stockton?
The job scope sets the price, including length, pipe or conduit size, soil, crossings, concrete or pavement, pits and excavator time. Near Interstate 10, right of way work can add planning; Reakor silty clay loam affects drilling conditions, and a Texas Pacifico crossing adds coordination. Mobilization also reflects the 547 road miles from Yukon, while creek crossings and emergency timing can change the work.
Where the Fort Stockton facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Fort Stockton
- U.S. Census Bureau, TIGER/Line 2024: Fort Stockton boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Fort Stockton
- U.S. Census Bureau, American Community Survey 2019 to 2023: Fort Stockton housing units and year built
- Macrostrat geologic map compilation: map units under Fort Stockton
- U.S. EPA Safe Drinking Water Information System: public water systems serving Fort Stockton
- U.S. Department of Transportation, North American Rail Network: track owners in Pecos County
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Pecos County
- U.S. Geological Survey, Elevation Point Query Service: Fort Stockton elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Fort Stockton
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Fort Stockton
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Fort Stockton, Texas
Type the address of your job in Fort Stockton. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Fort Stockton
Same county: Iraan · Sheffield. All counties: Texas county list.
