San Augustine Texas Directional Boring: Nacogdoches Clay, Ayish Bayou and BNSF Railway

Quick Answer: Columbia Street, El Camino Crossing and Milam Street run through 47.49 public road miles, with Ayish Bayou and BNSF Railway crossing San Augustine. We do directional boring, also called horizontal directional drilling (HDD), for routes beneath US 96 and other local obstacles. The Yukon, Oklahoma main office is 422 road miles away, and Columbia Street is one local reference for mobilization. Nacogdoches soil is common, and its clay can cling to the reamer and grip the pipe, so staged reaming and careful fluid control matter.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

San Augustine bores at a glance

  • County seat of San Augustine County, Texas. Population 1,848 (Census Bureau 2024 estimate).
  • Road distance from our Yukon, Oklahoma main office: 422 miles, about 8.3 hours of driving.
  • Ground: Nacogdoches soil is mapped on 44 percent of the area, with clay about 40 inches down.
  • Rock: bedrock is mapped within 60 inches on 13 percent of the area.
  • Highways inside the boundary: US 96, Texas State Highway 147, Texas State Highway 21, Loop 547 and FM 2213. State permit office: TxDOT Lufkin District.
  • Railroad track inside the boundary: BNSF Railway, with 4 mapped street and rail crossings.
  • Named streams inside the boundary: Ayish Bayou and Carrizo Creek.
  • Public water: City of San Augustine, surface water.
  • Electric: City of San Augustine municipal electric system.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who handles directional boring in San Augustine near Ayish Bayou?

Trinity Boring Solutions handles directional boring in San Augustine, where Columbia Street, El Camino Crossing and Milam Street run among 47.49 public road miles crossed by Ayish Bayou. The Census Bureau Vintage 2024 estimate puts the city population at 1,848. We install water, sewer, gas, electric conduit and fiber lines beneath streets such as Columbia Street or along routes serving properties near US 96.

Our main office is in Yukon, Oklahoma, and San Augustine work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our family business began in 1965, and we have done directional boring since 1982, experience we bring to planning underground work in San Augustine. The work can range from 3/4 inch service lines to 48 inch casing, useful for planning different line sizes around San Augustine streets and Ayish Bayou crossings.

Trinity Boring Solutions branded compact directional drilling unit positioned beside a tree on a red dirt jobsite
Our compact directional drill set up beside a tree on a tight site. Photos on this page are from our jobs in Oklahoma and Texas.

What ground does a San Augustine bore meet in Nacogdoches soil?

San Augustine has widespread Nacogdoches soil, which the USDA soil survey maps as 44% of the city. Clay loam covers 64% of the surface, while about 40 inches down the mapped texture is clay across 65% of the area and clay loam across 29%. Average clay content at that depth is 41%. These are mapped soil patterns, not test borings, so a route beneath Columbia Street still needs site specific planning. Sticky clay can build on a reamer, swell around pipe and make fluid returns worth watching.

USDA soil survey, inside the San Augustine city limitsWhat is mapped
Soil series mappedNacogdoches 44 percent, Alto 25 percent, Trawick 13 percent, Mattex 6 percent and Tuscosso 4 percent
Texture at the surfaceclay loam 64 percent, gravelly clay loam 13 percent and loam 13 percent
Texture about 40 inches downclay 65 percent, clay loam 29 percent and sandy clay loam 3 percent
Engineering class about 40 inches downfat clay (CH) 59 percent and lean clay (CL) 38 percent
Average clay content about 40 inches down41 percent
Bedrock mapped within 60 inches13 percent of the area (0 percent hard rock, 13 percent weathered rock)
Seasonal water table within 60 inches35 percent of the area
Flood prone soils13 percent of the area
High corrosion risk for uncoated steel94 percent of the area

The USDA soil survey maps weathered bedrock within five feet across 13% of San Augustine; hard bedrock is not mapped there. Seasonal water tables are mapped within five feet across 35%, and flood prone soils across 13%, so pits near Ayish Bayou need attention to water and channel depth. High steel corrosion risk is mapped across 94%, a consideration for casing and tracer wire materials. The Eocene Weches Formation includes sandstone and claystone, so subsurface conditions can vary beyond the mapped soil patterns.

How do we bore San Augustine clay near Ayish Bayou?

We bore San Augustine clay by managing fluid and reaming in stages, because the USDA soil survey maps clay at about 40 inches across much of the city. Ayish Bayou routes also call for depth and water planning.

  1. Because Nacogdoches soil is common, we use thinner drilling fluid with polymer and ream in stages to limit clay buildup on the reamer.
  2. Clay can grip pipe as it swells, so we keep the line ready and pull it the same day the opened bore is prepared.
  3. With heavy clay mapped at 40 inches, we watch fluid returns and keep pressure controlled so it does not lift pavement along US 96.
  4. Seasonal water tables are mapped within five feet across 35% of the city, so pits near Ayish Bayou may need pumping and careful sizing.
Walkover locator held over a flowing creek while tracking the drill head on a 385 foot rock bore in Guthrie, Oklahoma
Tracking the drill head with a walkover locator over a flowing creek on a 385 foot bore in Guthrie, Oklahoma.

Where might a San Augustine line go under US 96?

A San Augustine bore may need to pass beneath US 96, Texas State Highway 147, Texas State Highway 21 or another road in the city. Columbia Street is the longest named street at 2.17 miles, followed by El Camino Crossing at 1.89 miles and Milam Street at 1.41 miles. Broadway Street adds another named route for planning access and bore pits. Boring can leave pavement and driveways uncut, with pits placed on the dirt at each end.

CrossingTypeMapped extentWho has a say
US 96US highway2.3 roadway miles insideState highway office
Texas State Highway 147State highway4.8 roadway miles insideState highway office
Texas State Highway 21State highway2.5 roadway miles insideState highway office
Loop 547State highway1.2 roadway miles insideState highway office
FM 2213State highway1.1 roadway miles insideState highway office
FM 3230State highway1.1 roadway miles insideState highway office
FM 353State highway0.7 roadway miles insideState highway office
FM 711State highway0.4 roadway miles insideState highway office
FM 1277State highway0.3 roadway miles insideState highway office
FM 3483State highway0.1 roadway miles insideState highway office
BNSF RailwayRailroad3.22 track miles insideThe railroad
Ayish BayouStream3.29 channel miles insideChecked for Corps of Engineers jurisdiction
Carrizo CreekStream0.89 channel miles insideChecked for Corps of Engineers jurisdiction
Caney CreekStream nearby0.1 miles outsideChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

BNSF Railway has 3.22 track miles in San Augustine, and public records map 4 street and rail crossings. A track crossing needs the railroad owner’s agreement, with crossing conditions set for that route. Ayish Bayou has 3.29 channel miles inside the city, and Carrizo Creek has 0.89; 4 street crossings of named streams are mapped. City Lake covers 188 acres, so a route near the water also needs crossing planning.

Who approves San Augustine bores near BNSF Railway?

A bore beneath US 96 or another state route in San Augustine needs a TxDOT utility permit, reviewed by the TxDOT Lufkin District. The utility that owns the line submits the application in TxDOT’s online RULIS system; we prepare the bore plan and profile and work under the owner’s permit. TxDOT rules call for boring or tunneling beneath existing highway pavement, with a crossing extending under all travel lanes on rural highways. Work under BNSF Railway track needs an agreement from the railroad owner. Ayish Bayou crossings are checked for U.S. Army Corps of Engineers jurisdiction during planning.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

What lines are already in the ground in San Augustine County?

The City of San Augustine public water system uses surface water and reports 1,947 service connections serving 1,971 people. The city also owns its municipal electric system, which reports 1,217 customers to EIA. For a conduit bore near the water system or electric lines along Columbia Street, we use hydrovac potholing to expose marked utilities before drilling near them; paint shows position, not depth.

Line ownerWhat it isSourceSize
City of San AugustinePublic water systemSurface water1,947 connections, 1,971 people served
City of San Augustine municipal electric systemCity owned electric systemReports to the U.S. Energy Information Administration1,217 customers reported
Deep East Texas Electric CooperativeElectric utilities reporting service in San Augustine CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

The American Community Survey 2019 to 2023 five year estimates put San Augustine’s median housing year at 1981, which we consider when planning underground work. The survey estimates 24% of homes were built before 1960, 63% from 1960 to 1999 and 13% in 2000 or later. That mix can mean a bore along Broadway Street serves either replacement work or a newer connection. We pothole marked lines on the route before the drill approaches them.

Exposed underground utility line in a hand dug potholing pit before a directional bore in Oklahoma
An existing utility line exposed in a pothole before a directional bore in Oklahoma.

Do you cover San Augustine and nearby Chireno?

We take directional boring work in San Augustine County, where San Augustine sits at 351 feet elevation and covers 4.72 square miles. The city is the county seat, and its ZIP code is 75972. Chireno is 14.0 miles west; Shelbyville is 16.0 miles north, and Center, the nearest larger city, is 18.6 miles north. Our Yukon, Oklahoma yard is 422 road miles away, an 8.3 hour drive, so distance is part of planning a Columbia Street or Ayish Bayou job.

Places near San Augustine

What might we bore near Columbia Street in San Augustine?

  • Highway crossing: A utility route under US 96 is bored beneath the pavement, with the plan accounting for all travel lanes on a rural highway.
  • Water service: A connection near the City of San Augustine water system needs its route checked against marked lines before drilling.
  • Fiber route: Columbia Street offers a named corridor for planning a fiber bore that passes under pavement rather than cutting across it.
  • Creek crossing: An Ayish Bayou route needs depth planning under the channel and a check for U.S. Army Corps of Engineers jurisdiction.
  • Rail crossing: A bore beneath the BNSF Railway track requires the railroad owner’s agreement and its crossing conditions.
  • Electric conduit: The city owns its municipal electric system, so the line owner is confirmed before a conduit route near Broadway Street is planned.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

What do you need to quote a San Augustine bore near Broadway Street?

For a bore near Broadway Street, start with the address or map pin so we can place the route. Tell us what goes in the ground, such as water or electric conduit, then give the pipe or conduit size and the footage. A sketch or plans help show how the proposed path relates to US 96, Ayish Bayou or other crossings.

A short, clear route through Nacogdoches clay is simpler to plan than a longer path with several obstacles. Price depends on length, pipe size, soil and rock, utilities to expose, pavement, creek crossings, pits and equipment time. A route under US 96 or BNSF Railway adds crossing coordination, while Ayish Bayou can affect depth and planning. The 422 road miles from Yukon also affect mobilization for San Augustine work.

Questions people ask about boring in San Augustine

Does Trinity take directional boring work in San Augustine County, and who staffs it?

Yes, Trinity Boring Solutions takes directional boring work in San Augustine County. The project is handled through our Yukon office, with our own crews or crews from satellite yards operated by partner drilling contractors we have vetted. You work with Trinity from the first call through the bore log, including for a route near Ayish Bayou.

What is Nacogdoches soil like for a San Augustine bore?

Nacogdoches soil is common in San Augustine, and the USDA soil survey maps clay across 65% of the area at about 40 inches below the surface. Clay loam is the main surface texture. Sticky clay can load onto a reamer and grip the pipe, so staged reaming and fluid control can matter for a route under Columbia Street.

How much bedrock is mapped within five feet in San Augustine?

The USDA soil survey maps weathered bedrock within five feet across 13% of San Augustine, but hard bedrock is not mapped in that depth range. The Eocene Weches Formation includes sandstone and claystone, so the soil map does not establish what a specific bore will encounter. A route near Ayish Bayou still needs site specific review.

Who approves a San Augustine bore under US 96?

The line owning utility applies for the TxDOT utility permit for a bore under US 96, and the TxDOT Lufkin District reviews it. The application goes through RULIS. We prepare the bore plan and profile for the utility owner and work under its permit, with the route planned to meet the permitted crossing conditions.

What does a San Augustine bore beneath BNSF Railway require?

A bore beneath BNSF Railway track in San Augustine needs an agreement from the railroad that owns it. For San Augustine crossings, we use the agreement to set casing, depth and flagging conditions before planning boring work. Public records map 3.22 track miles in the city, so the route and track location need to be identified before crossing plans are prepared.

Can a San Augustine line be bored under Ayish Bayou?

A line can be planned beneath Ayish Bayou, subject to route and crossing review. The bayou has 3.29 channel miles inside San Augustine, and creek crossings are checked for U.S. Army Corps of Engineers jurisdiction during planning. The bore path also needs depth planning to stay below the channel.

How far is San Augustine from Yukon, and does nearby Center affect the job?

San Augustine is 422 road miles and an 8.3 hour drive from our Yukon, Oklahoma main office. Center is 18.6 miles north and is the nearest larger city, but mobilization is planned around the actual San Augustine job location. A route near US 96 or Ayish Bayou still has its own crossing and access needs.

How much notice does a Columbia Street bore in San Augustine need?

Texas811 needs a locate request at least 48 hours before excavation starts, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before work. If a Columbia Street start slips more than 14 days past the original notice, a new request is needed. Before work continues in San Augustine, we refresh worn or moved marks through Texas811.

What affects the cost of directional boring near US 96 in San Augustine?

The job scope determines the price, including bore length, pipe size, Nacogdoches clay or rock, utilities to expose, pavement and pit work. A US 96 crossing or a route under BNSF Railway can add coordination, while Ayish Bayou adds creek crossing planning. Mobilization from Yukon also matters because San Augustine is 422 road miles away.

Where the San Augustine facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in San Augustine

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in San Augustine, Texas

Type the address of your job in San Augustine. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.