Bandera Texas Directional Boring: Nuvalde Soil, Medina River, Texas State Highway 16
Quick Answer: Texas State Highway 16 and the Medina River are the main places a Bandera bore may need to pass, and Trinity Boring Solutions handles directional boring, also called horizontal directional drilling (HDD), in Texas. Bandera is 517 road miles from our Yukon, Oklahoma main office, so a route along Hackberry Street affects mobilization planning. Nuvalde silty clay is mapped across 37 percent of the city and can cling to the reamer. A Medina River crossing also calls for a planned path that stays below the channel.
Bandera bores at a glance
- County seat of Bandera County, Texas. Population 891 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 517 miles, about 10 hours of driving.
- Ground: Nuvalde soil is mapped on 37 percent of the area, with clay about 40 inches down.
- Rock: bedrock is mapped within 60 inches on 32 percent of the area.
- Highways inside the boundary: Texas State Highway 16 and Texas State Highway 173. State permit office: TxDOT San Antonio District.
- Railroad track inside the boundary: none mapped.
- Named streams inside the boundary: Medina River and Mud Creek.
- Public water: City of Bandera, groundwater wells.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Which contractor handles boring under Texas State Highway 16 in Bandera?
We take directional boring work in Bandera, the Bandera County seat, where the Census Bureau Vintage 2024 estimate puts the population at 891. Along Texas State Highway 16, Hackberry Street or Cypress Street, a bore can carry water, sewer, gas, electric conduit or fiber while leaving the surface route uncut. We size the method to the line and the ground along its path.
Our main office is in Yukon, Oklahoma, and Bandera work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. We are a family business that started in 1965 and has bored directionally since 1982. The 3/4 inch service line to 48 inch casing range gives us options for routes near the Medina River or Texas State Highway 16.

What ground does Nuvalde soil mean for a bore in Bandera?
The USDA soil survey maps Nuvalde soil across 37 percent of Bandera, with Nuvalde silty clay on 1 to 3 percent slopes. Anhalt clay covers another 27 percent, so clay ground is a major part of the mapped area. At about 40 inches below the surface, clay is mapped across 37 percent and bedrock across 31 percent; the average clay content there is 30 percent. Sandy ground is mapped across 11 percent at that depth. These are mapped patterns, not test borings, so the route still needs field checks.
| USDA soil survey, inside the Bandera city limits | What is mapped |
|---|---|
| Soil series mapped | Nuvalde 37 percent, Anhalt 27 percent, Orif 11 percent, Boerne 11 percent and Oakalla 9 percent |
| Texture at the surface | silty clay 37 percent, clay 28 percent and gravelly sandy loam 11 percent |
| Texture about 40 inches down | clay 37 percent, bedrock 31 percent and extremely gravelly loamy sand 11 percent |
| Engineering class about 40 inches down | lean clay (CL) 57 percent and clean gravel (GP) 11 percent |
| Average clay content about 40 inches down | 30 percent |
| Bedrock mapped within 60 inches | 32 percent of the area (4 percent hard rock, 28 percent weathered rock) |
| Seasonal water table within 60 inches | 0 percent of the area |
| Flood prone soils | 31 percent of the area |
| High corrosion risk for uncoated steel | 65 percent of the area |
Bedrock is mapped within five feet across 32 percent of Bandera, including hard bedrock across 4 percent and weathered bedrock across 28 percent. The Glen Rose Formation, of Albian age, includes limestone, dolostone and marl, so a route can shift from soil into rock and need slower drilling or a rock tool. Seasonal water tables are not mapped within five feet, but flood prone soils cover 31 percent. High steel corrosion risk is mapped across 65 percent, so the line owner should consider protection for steel casing or tracer wire; HDPE avoids that steel corrosion concern.
How do we drill Bandera clay and Nuvalde soil?
Nuvalde silty clay and Anhalt clay call for control of the drilling fluid and careful reaming. On a Bandera route, we match the setup to the mapped ground and keep the proposed line clear of marked utilities.
- Nuvalde silty clay can stick to the reamer, so we use a controlled fluid mix, open the hole in stages and have the pipe ready for the pull.
- Where Anhalt clay makes up part of the route, we watch fluid returns closely so pressure does not lift pavement on streets such as Cypress Street.
- With bedrock mapped in parts of Bandera, including Glen Rose Formation ground, we adjust the tooling and drilling pace as the route moves from soil into rock.
- For a Medina River route, we plan depth below the channel and check whether the crossing falls under U.S. Army Corps of Engineers jurisdiction.

Which roads and creeks could a Bandera bore cross near the Medina River?
Texas State Highway 16 and Texas State Highway 173 run through Bandera, so a route beneath either highway needs a planned bore rather than an open cut through the pavement. Hackberry Street is the longest named street in the city at 1.13 miles, followed by Cypress Street at 1.11 miles and Pecan Street at 1.1 miles. Those streets can also shape a local service route. A bore under a roadway keeps its pavement intact, with entry and exit pits set in the dirt beside the route.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| Texas State Highway 16 | State highway | 1.7 roadway miles inside | State highway office |
| Texas State Highway 173 | State highway | 1.3 roadway miles inside | State highway office |
| Medina River | Stream | 1.97 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Mud Creek | Stream | 0.53 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Doe Creek | Stream nearby | Along the boundary | Checked for Corps of Engineers jurisdiction |
| Bandera Creek | Stream nearby | 0.2 miles outside | Checked for Corps of Engineers jurisdiction |
| Mason Creek | Stream nearby | 0.9 miles outside | Checked for Corps of Engineers jurisdiction |
| Lake Hiawatha | Lake or pond | 5 acres, nearby | Checked for Corps of Engineers jurisdiction |
No railroad tracks are mapped inside Bandera or within 1 mile outside its limits, so the mapped street and rail crossing count is none. The Medina River runs 1.97 channel miles through the city, while Mud Creek runs 0.53 channel miles. Public records map 6 street crossings of named streams in Bandera. Lake Hiawatha is a 5 acre lake outside the city limits and within one mile; a proposed route near water needs its crossing conditions checked during planning.
Who approves a bore under Texas State Highway 16 in Bandera?
For a bore in the Texas State Highway 16 right of way, the utility that owns the line applies through TxDOT’s online RULIS system, and the TxDOT San Antonio District reviews it. We prepare the bore plan and profile and work under the permit issued to the utility owner. Cover depends on the line: electric and communication crossings need 60 inches below the lowest crossed grade, water crossings need 60 inches, and pressurized sewer crossings need 60 inches. The district may set another depth. Bandera streets such as Cypress Street are city streets, while Medina River crossings are checked for U.S. Army Corps of Engineers jurisdiction during planning.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Which utilities and water lines serve Bandera County?
The City of Bandera public water system draws from groundwater wells and lists 1,077 service connections serving 3,231 people. That system is a useful reference when planning a water line near Hackberry Street, but the exact line owner still needs confirmation for each proposed route. Utilities reporting electric service in Bandera County to the EIA are the City of San Antonio and Bandera Electric Cooperative. We confirm which owner is involved before planning an electric conduit bore.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| City of Bandera | Public water system | Groundwater wells | 1,077 connections, 3,231 people served |
| City of San Antonio and Bandera Electric Cooperative | Electric utilities reporting service in Bandera County | EIA Form 861 | Confirm the line owner by address |
The American Community Survey 2019 to 2023 five year estimates put Bandera’s median housing year at 1980; 31 percent of homes were built before 1960, and 32 percent in 2000 or later. A route along Cypress Street may serve an older replacement or a newer connection, and the existing line location matters either way. Before the drill approaches a marked utility, we expose it with hydrovac potholing; for a proposed line under Hackberry Street, that means checking the marked crossings before drilling near them.

Do you cover Bandera and nearby Lakehills?
Bandera is an incorporated city and the seat of Bandera County, with 1.14 square miles of land at an elevation of 1,250 feet and ZIP code 78003. Lake Medina Shores is 7.8 miles southeast, and Lakehills is 10.4 miles southeast; Center Point is 14.6 miles north. Lakehills is the nearest larger city listed for the area. Our Yukon, Oklahoma main office is 517 road miles away, a 10.0 hour drive, which matters when planning crew and equipment mobilization for a Bandera route.
Places near Bandera
- Directional boring in Lake Medina Shores: 7.8 miles southeast
- Directional boring in Lakehills: 10.4 miles southeast
- Directional boring in Center Point: 14.6 miles north
- Directional boring in Comfort: 19.9 miles northeast
- Directional boring in Boerne: 21.2 miles east
What could we bore near Cypress Street in Bandera?
- Highway crossing: A water or communication line beneath Texas State Highway 16 needs a bore plan, the required cover and the utility owner’s TxDOT permit.
- Water service: A new service near the City of Bandera groundwater system can be routed under Hackberry Street without cutting the street surface.
- Fiber route: A conduit bore along Cypress Street can connect a route while keeping the pavement and adjoining access intact.
- Creek crossing: A proposed line at the Medina River needs a path planned beneath the channel and a jurisdiction check during planning.
- Electric conduit: Near Pecan Street, we first confirm the line owner and expose marked utilities before the drill approaches the route.
- Sewer line: A pressurized sewer crossing beneath Texas State Highway 173 needs the state cover depth and a bore planned through the right of way.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
How do I get a quote for a Bandera bore near Hackberry Street?
For a Bandera quote, send the address or map pin, what will go in the ground, the pipe or conduit size and the footage; a sketch or plans help. A proposed route under Hackberry Street or near the Medina River gives us a local feature to check against the line path, access and likely crossing conditions.
The job scope sets the price, not a single feature on the map. Nuvalde and Anhalt clay can affect drilling fluid and reaming; a Texas State Highway 16 crossing adds permit planning and cover requirements. Length, pipe size, exposed utilities, pavement, creek crossings, pits, excavator time and sand backfill all matter. Bandera’s 517 road miles from Yukon also affect mobilization, and emergency or high profile work can change the scope.
Questions people ask about boring in Bandera
Does Trinity take directional boring work in Bandera County, and how is it staffed?
Yes. We take directional boring work in Bandera County, with the job staffed by our own crews or from satellite yards run by partner drilling contractors we have vetted. You work with Trinity from the first call through the bore log, whether the route is near Hackberry Street or Texas State Highway 16.
Could groundwater or flood prone soil near the Medina River affect a Bandera bore pit?
It can affect the plan. Seasonal water tables are not mapped within five feet in Bandera, but flood prone soils cover 31 percent of the city. A Medina River route needs pit placement and bore depth planned for the site conditions, and the crossing is checked for U.S. Army Corps of Engineers jurisdiction during planning.
Does Nuvalde soil in Bandera pose a corrosion concern for steel, and what pipe can we use?
The concern is mapped by area, not determined by the soil name alone: high steel corrosion risk covers 65 percent of Bandera. HDPE avoids that steel corrosion issue. The line owner selects any coating for steel casing or tracer wire, so the proposed route and material near Hackberry Street should be reviewed together.
What ground is likely along a Bandera bore through Nuvalde soil?
The USDA soil survey maps Nuvalde across 37 percent of Bandera, with silty clay as its mapped texture. At about 40 inches deep, clay is mapped across 37 percent of the city, while bedrock is mapped across 31 percent. Those figures describe survey patterns, not a test at a particular spot along Cypress Street.
Is there rock along a Bandera bore, and how much bedrock is mapped?
Bedrock is mapped within five feet across 32 percent of Bandera. The survey maps hard bedrock across 4 percent and weathered bedrock across 28 percent. The Glen Rose Formation includes limestone, dolostone and marl, so a route near the Medina River or a city street may call for a change in drilling pace or tooling.
Who approves a Bandera bore under Texas State Highway 16?
The utility that owns the line submits the application in TxDOT’s RULIS system, and the TxDOT San Antonio District reviews it. For Texas State Highway 16, we supply the bore plan and profile and work under the utility owner’s permit. Required cover depends on whether the line is electric, communication, water or pressurized sewer.
How early should I call Texas811 for a Bandera bore along Hackberry Street?
Texas law requires the locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days ahead. If the start slips more than 14 days past the original notice for Hackberry Street, make a new request. Worn or moved marks must be refreshed through Texas811 before work continues.
How far is Bandera from Yukon, and does Lakehills change mobilization?
Bandera is 517 road miles and a 10.0 hour drive from our Yukon, Oklahoma main office. Lakehills is 10.4 miles southeast of Bandera, but the job’s location and access still shape mobilization planning. The route, equipment needed and whether the work is near Texas State Highway 16 all help define the schedule.
What affects the cost of directional boring in Bandera under Texas State Highway 16?
Length, pipe or conduit size, ground, exposed utilities, pavement, creek crossings, pits and excavator time all affect the job. A Texas State Highway 16 crossing brings permit and cover planning, while Nuvalde clay can change the reaming approach. Bandera’s distance from Yukon also affects mobilization; the final scope depends on the proposed route and work conditions.
Where the Bandera facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Bandera
- U.S. Census Bureau, TIGER/Line 2024: Bandera boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Bandera
- U.S. Census Bureau, American Community Survey 2019 to 2023: Bandera housing units and year built
- Macrostrat geologic map compilation: map units under Bandera
- U.S. EPA Safe Drinking Water Information System: public water systems serving Bandera
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Bandera County
- U.S. Geological Survey, Elevation Point Query Service: Bandera elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Bandera
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Bandera
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Bandera, Texas
Type the address of your job in Bandera. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Bandera
All counties: Texas county list.