Crane Texas Directional Boring: Tencee Soil, US 385 and McElroy Street
Quick Answer: Crane is an incorporated county seat, so its streets belong to the city; we take directional boring, also called horizontal directional drilling (HDD), for lines beneath US 385. The Yukon main office is 480 road miles away, and McElroy Street is part of Crane’s city street network. USDA maps Tencee soil across 61% of the city. Its gravelly ground can shift a drill head, so we track depth and pitch as a bore advances.
Crane bores at a glance
- County seat of Crane County, Texas. Population 3,375 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 480 miles, about 9.4 hours of driving.
- Ground: Tencee soil is mapped on 61 percent of the area, with very gravelly loam about 40 inches down.
- Rock: no bedrock is mapped in the top 60 inches.
- Highways inside the boundary: US 385 and Texas State Highway 329. State permit office: TxDOT Odessa District.
- Railroad track inside the boundary: none mapped.
- Public water: City of Crane, groundwater wells.
- Electric: City of Crane municipal electric system.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Which contractor handles directional boring under US 385 in Crane?
Crane is an incorporated city and the county seat of Crane County, so its city streets are under city ownership. Crane’s Census Bureau Vintage 2024 population estimate is 3,375; we plan underground work around each route’s conditions, not a population figure. We install water, sewer, gas, electric conduit and fiber, including service lines along Main Street or conduit planned beneath US 385. The line route and size determine the equipment and bore plan.
Our main office is in Yukon, Oklahoma, and Crane work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. For Crane County work, our range runs from 3/4 inch service lines to 48 inch casing, with lengths from 10 feet to 5,000 feet. A short service connection near Katherine Street is at the small end; a long casing bore beneath US 385 is at the large end. When planning near US 385 in Crane, we draw on a family business begun in 1965 and directional boring experience dating to 1982.

What does the soil survey show about Tencee soil in Crane?
The USDA soil survey maps Tencee association, undulating, across 61% of Crane and Wickett association, gently undulating, across 39%. At the surface, 61% is very gravelly loam and 39% is loamy fine sand. About 40 inches down, the survey maps very gravelly loam across 61% and cemented material across 39%. Tencee and Wickett are mapped soil patterns, with very gravelly loam at the surface; we treat them as context, not test borings. The survey reports an average clay content of 22% at that depth, but gravelly material is the main planning concern for the drill.
| USDA soil survey, inside the Crane city limits | What is mapped |
|---|---|
| Soil series mapped | Tencee 61 percent and Wickett 39 percent |
| Texture at the surface | very gravelly loam 61 percent and loamy fine sand 39 percent |
| Texture about 40 inches down | very gravelly loam 61 percent and cemented material 39 percent |
| Engineering class about 40 inches down | clayey gravel (GC) 61 percent |
| Average clay content about 40 inches down | 22 percent |
| Bedrock mapped within 60 inches | None mapped |
| Seasonal water table within 60 inches | 0 percent of the area |
| Flood prone soils | 0 percent of the area |
| High corrosion risk for uncoated steel | 0 percent of the area |
Bedrock is not mapped in the top five feet of Crane, and the mapped soils show no seasonal water table, flood prone ground or high steel corrosion risk. That does not rule out rock at greater depth. The geologic map includes Cenozoic caliche deposits, described as reaching thicknesses of up to 35 feet, as well as Triassic sedimentary rock. Those deeper layers can change the drilling conditions, so the bore plan for a McElroy Street route needs to account for what the route encounters. Where the gravelly soil is present, we monitor the drill head closely.
What does it take to bore Crane’s very gravelly loam?
The USDA maps very gravelly loam across 61% of Crane, including at about 40 inches. Gravel can push the drill head off line, so our crews check the bore path and keep the pipe ready for pullback.
- On a Tencee route, we check the planned line and utility marks before drilling, since mapped gravelly ground can push a drill head off its intended path.
- At marked utilities near McElroy Street, we use hydrovac potholing to expose the line; paint indicates where it is, not how deep it lies.
- As a bore advances through Crane’s gravelly soil, a walkover locator tracks the drill head and our crew logs its depth and pitch.
- We stage reaming and have the pipe ready for pullback on a very gravelly loam route, limiting the time an open bore is left in the ground.

What does a bore have to cross on McElroy Street in Crane?
US 385 runs 1.7 mapped roadway miles inside Crane, and Texas State Highway 329 runs 0.8 miles. Both can bring a state right of way into the bore plan. McElroy Street is the longest named street in the city at 1.71 miles, followed by Gaston Street at 1.57 miles and Main Street at 1.12 miles. Katherine Street measures 1.1 miles. A route beneath one of these streets can often be planned as a bore rather than an open cut, subject to the road owner’s requirements.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| US 385 | US highway | 1.7 roadway miles inside | State highway office |
| Texas State Highway 329 | State highway | 0.8 roadway miles inside | State highway office |
No railroad is mapped inside Crane or within one mile outside the city limits, so there is no mapped track crossing to plan around. No streams are mapped inside or within one mile of the city, and no lakes or ponds are mapped within one mile. The city’s mapped street and rail crossing count is none, as is the mapped count of streets crossing named streams. A McElroy Street bore still needs utility locations checked along its actual route.
Who has to sign off on a bore in Crane County?
For work in the right of way of US 385 or Texas State Highway 329, the utility owner applies for a TxDOT utility permit through RULIS, and the TxDOT Odessa District reviews it. Electric and communication lines crossing either highway need at least 60 inches of cover below the lowest point of the crossed grade; water lines need the same cover, and pressurized sewer lines need 60 inches. TxDOT requires boring or tunneling beneath an existing highway. The utility owner files the application, while we prepare the bore plan and profile and work under its permit. Crane’s city streets belong to the city, and no railroad or water crossing is mapped nearby.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Who owns the City of Crane water and electric systems?
The City of Crane owns the public water system, which gets its water from groundwater wells and serves 3,996 people through 1,818 service connections. A bore on Main Street may need to pass near a water line, so the route and utility marks matter. On Main Street, we account for Crane’s city owned municipal electric system when planning underground boring routes. AEP Texas North and Oncor Electric Delivery Company report service in Crane County, but the line owner for a particular route needs to be established before conduit plans are set.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| City of Crane | Public water system | Groundwater wells | 1,818 connections, 3,996 people served |
| City of Crane municipal electric system | City owned electric system | Reports to the U.S. Energy Information Administration | 104 customers reported |
| AEP Texas North and Oncor Electric Delivery Company | Electric utilities reporting service in Crane County | EIA Form 861 | Confirm the line owner by address |
The American Community Survey 2019 to 2023 five year estimates give Crane a median housing year of 1970. The survey says 32% of housing was built before 1960, 53% from 1960 to 1999, and 15% in 2000 or later. That mix can mean a project on Katherine Street involves replacing older service lines or adding a connection for newer housing. Before the drill approaches a marked line, we use hydrovac potholing to expose it; paint shows position, not depth.

Where is Crane in relation to Imperial?
Crane is in Crane County, Texas, and is the county seat. Its elevation is 2,595 feet, and the city covers 1.05 square miles. ZIP code 79731 serves Crane, and we use McElroy Street as a local reference when discussing underground routes. McCamey is 19.5 miles southeast, Imperial is 22.1 miles southwest, and Rankin is 26.8 miles southeast. West Odessa, the nearest larger city, is 32.1 miles north. The Yukon, Oklahoma main office is 480 road miles away, a drive of 9.4 hours. That distance is part of planning mobilization for work near US 385 or the city streets.
Places near Crane
- Directional boring in McCamey: 19.5 miles southeast
- Directional boring in Imperial: 22.1 miles southwest
- Directional boring in Rankin: 26.8 miles southeast
- Directional boring in Grandfalls: 30 miles west
- Directional boring in West Odessa: 32.1 miles north
What kinds of bores come up on Main Street in Crane?
- Highway crossing: A bore beneath US 385 needs a route and profile that fit the TxDOT right of way and the utility owner’s permit.
- Water service: A connection near Main Street may meet lines tied to the City of Crane groundwater system, so marked utilities need exposure before drilling.
- Fiber conduit: A route along McElroy Street can use a bore to avoid cutting pavement where the planned path and utility clearances allow.
- Electric conduit: Near Katherine Street, confirm which line owner applies to the route before settling conduit details for a crossing.
- Park connection: A service route near Crane County Park can be scoped by its map pin, footage, and the lines already marked along the path.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What should I send for a Crane bore near Katherine Street?
For a bore near Katherine Street, start with the address or a map pin. Tell us what goes in the ground, such as water pipe or fiber conduit, then give the pipe or conduit size and the footage. A sketch or plans help us check the route against nearby streets and utilities. That information lets us scope the work before setting the bore plan.
In Crane, soil and rock conditions are the first pricing question: Tencee ground is mapped as very gravelly loam across 61%, and caliche deposits may affect what a bore encounters below. The next factors are the number of utilities to expose and any highway or pavement crossings near US 385. Length, pipe size, pits, excavator time and backfill also affect the work. Mobilization matters because the Yukon main office is 480 road miles away.
Questions people ask about boring in Crane
Does Trinity take directional boring work in Crane County, and who staffs it?
Yes. Trinity takes directional boring work in Crane County, with our own crews and partner contractor crews from vetted satellite yards. You work with Trinity through the job and bore log, regardless of which crew is on site. For a route near Main Street, the address and line details help us plan the work.
Will a bore in Crane hit rock below the Tencee soil?
It may encounter rock at depth, but bedrock is not mapped in the top five feet of Crane. The geologic map shows Cenozoic caliche deposits and Triassic sedimentary rock. Those mapped units do not establish what a specific bore will meet, so a route near US 385 still needs a plan suited to its actual conditions.
Who approves a bore under US 385 in Crane, and which TxDOT office reviews it?
The utility owner applies for the right of way permit in TxDOT’s RULIS system, and the TxDOT Odessa District reviews it. A bore under US 385 must follow the permit’s route and cover requirements. We prepare the bore plan and profile for the utility owner’s application and work under the permit it receives.
When planning a bore near Main Street in Crane, who runs the public water system, and where does its water come from?
The City of Crane owns the public water system, supplied by groundwater wells, so we account for water utilities when planning bores near McElroy Street. For underground planning in Crane, the water system’s 3,996 people and 1,818 service connections make utility coordination important. For a bore near Main Street, the route needs to account for marked water lines before the drill approaches them.
Which electric line owner should I check for a Crane County conduit bore?
The City of Crane owns its municipal electric system. AEP Texas North and Oncor Electric Delivery Company also report service in Crane County, but that does not identify the owner at every address. Confirm the line owner for the planned route before setting conduit specifications near Katherine Street.
Does the city or county control Main Street in Crane, and must it be cut?
Crane is incorporated, so Main Street is a city street. A directional bore can pass beneath pavement without an open cut when the route and required approvals allow it. The exact path still needs utility locations checked, especially where older services may be present along the street.
What bore sizes and lengths can Trinity handle for work near Katherine Street in Crane?
Trinity handles lines from 3/4 inch service size up to 48 inch casing, and bore lengths from 10 feet to 5,000 feet. A short connection near Katherine Street and a longer casing route call for different equipment and planning. Send the size and footage with the location so we can scope it.
How early should I call Texas811 for a Crane bore near McElroy Street?
Request a Texas811 locate at least 48 hours before excavation starts, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days ahead. If a McElroy Street start slips more than 14 days past the original notice, submit a new request. Worn or moved marks need refreshing through Texas811 before work continues.
How do mapped Tencee and Wickett soils and TxDOT Odessa District permitting affect the cost of directional boring under US 385 in Crane?
The main factors are the length and size of the bore, Tencee gravelly ground, utilities that need exposure, and any pavement or highway work near US 385. Pits, excavator time, sand backfill, schedule demands and mobilization also shape the scope. The Yukon main office is 480 road miles away, which is relevant to mobilization.
Where the Crane facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Crane
- U.S. Census Bureau, TIGER/Line 2024: Crane boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Crane
- U.S. Census Bureau, American Community Survey 2019 to 2023: Crane housing units and year built
- Macrostrat geologic map compilation: map units under Crane
- U.S. EPA Safe Drinking Water Information System: public water systems serving Crane
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Crane County
- U.S. Geological Survey, Elevation Point Query Service: Crane elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Crane
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Crane
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Crane, Texas
Type the address of your job in Crane. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Crane
All counties: Texas county list.
