Quick Answer: Cuero is an incorporated small city, so Esplanade Street and other city streets belong to the city; we do directional boring, also called horizontal directional drilling (HDD), for lines crossing them. The Yukon main office is 494 road miles away, with US 77 Alternate among the routes a job may need to cross. Mabank soil is widespread, and clay at about 40 inches can hold and grip the hole, so reaming and fluid control matter.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Cuero bores at a glance

  • County seat of DeWitt County, Texas. Population 8,215 (Census Bureau 2024 estimate).
  • Road distance from our Yukon, Oklahoma main office: 494 miles, about 9.4 hours of driving.
  • Ground: Mabank soil is mapped on 26 percent of the area, with clay about 40 inches down.
  • Rock: no bedrock is mapped in the top 60 inches.
  • Highways inside the boundary: US 77 Alternate, US 183, US 87, FM 236 and FM 1447. State permit office: TxDOT Yoakum District.
  • Railroad track inside the boundary: Union Pacific, with 14 mapped street and rail crossings.
  • Named streams inside the boundary: Gohlke Creek.
  • Public water: City of Cuero, groundwater wells.
  • Electric: City of Cuero municipal electric system.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who handles directional boring near Esplanade Street in Cuero?

Cuero is a small incorporated city and the seat of DeWitt County. The Census Bureau Vintage 2024 estimate puts its population at 8,215. We install water, sewer, gas, electric conduit and fiber lines, including service runs along Esplanade Street or connections near US 183. The city street setting helps determine access for the entry and exit pits.

Our main office is in Yukon, Oklahoma, and Cuero work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Jobs can range from a 3/4 inch service line near Henry Street to a 48 inch casing for a larger crossing. Our family business started in 1965, and we have done directional boring since 1982.

Aerial view of a bore pit with drill rig and conduit alongside a directional drill rig and conduit on a concrete lot
Our crew at a bore pit beside the directional drill on a conduit job, seen from above. Photos on this page are from our jobs in Oklahoma and Texas.

What is Mabank soil like to bore in Cuero?

The USDA soil survey maps Mabank soil across 26 percent of Cuero, with Mabank fine sandy loam, 0 to 1 percent slopes, covering 24 percent. At about 40 inches below the surface, clay is mapped across 45 percent of the area, while very gravelly loamy sand is mapped across 23 percent. The average clay content at that depth is 29 percent. These are mapped soil patterns, not test borings, so the exact route still needs to be assessed before choosing a drilling fluid and reaming sequence.

USDA soil survey, inside the Cuero city limitsWhat is mapped
Soil series mappedMabank 26 percent, Silvern 23 percent, Cuero 14 percent, Wilson 11 percent and Crockett 10 percent
Texture at the surfacefine sandy loam 40 percent, very gravelly loamy sand 23 percent and sandy clay loam 14 percent
Texture about 40 inches downclay 45 percent, very gravelly loamy sand 23 percent and clay loam 14 percent
Engineering class about 40 inches downlean clay (CL) 56 percent, graded gravel with silt (GW GM) 23 percent and clayey sand (SC) 18 percent
Average clay content about 40 inches down29 percent
Bedrock mapped within 60 inchesNone mapped
Seasonal water table within 60 inches8 percent of the area
Flood prone soils2 percent of the area
High corrosion risk for uncoated steel57 percent of the area

Bedrock is not mapped in the top five feet of Cuero, but the geologic map shows Cenozoic terrace deposits of sand, silt, clay and gravel. That mix can change along a bore. Seasonal water tables are mapped within 60 inches across 8 percent of the area, and flood prone soils across 2 percent, so pits near Gohlke Creek need attention to water and channel depth. High steel corrosion risk is mapped across 57 percent; the line owner selects any coating for steel casing or tracer wire, while HDPE avoids that steel corrosion issue.

What does it take to bore Cuero clay?

Cuero’s mapped ground includes clay, sandy clay loam and gravelly material. We adjust the drilling fluid and reaming approach to the route instead of treating a bore near Gohlke Creek like one along Esplanade Street.

  1. Clay control: Where Cuero’s mapped clay is present, we manage fluid returns and ream in stages so sticky cuttings do not load the reamer.
  2. Sandy ground: Mabank fine sandy loam can sit above gravelly material, so the hole may need staged reaming and fluid support to limit sloughing.
  3. Wet pits: With seasonal water tables mapped in parts of Cuero, pits near Gohlke Creek may need pumping and a compact layout.
  4. Utility exposure: Before drilling near marked lines on Henry Street, we pothole each crossing and track the drill head from the surface.
6 inch PVC sleeve coming out of the bore pit wall in red sandy soil with the Trinity water trailer behind, northeast Oklahoma City
A 6 inch PVC sleeve coming out of the bore pit wall in red sandy soil in northeast Oklahoma City.

What is in the way of a new line in Cuero near Union Pacific?

US 77 Alternate and US 183 each have 5.2 mapped roadway miles inside Cuero. US 87 has 3.3 miles, with FM 236, FM 1447 and Texas State Highway 72 also inside the limits. A bore near those routes needs to account for the road owner and right of way. Esplanade Street is the longest named street at 2.81 miles, followed by Broadway Street at 2.34 miles and Henry Street at 2.25 miles, giving several possible street corridors for service work.

CrossingTypeMapped extentWho has a say
US 77 AlternateUS highway5.2 roadway miles insideState highway office
US 183US highway5.2 roadway miles insideState highway office
US 87US highway3.3 roadway miles insideState highway office
FM 236State highway1.2 roadway miles insideState highway office
FM 1447State highway1.1 roadway miles insideState highway office
Texas State Highway 72State highway0.9 roadway miles insideState highway office
Union PacificRailroad5 track miles insideThe railroad
Gohlke CreekStream2.25 channel miles insideChecked for Corps of Engineers jurisdiction
Oaxley BranchStream nearby0.1 miles outsideChecked for Corps of Engineers jurisdiction
Guadalupe RiverStream nearby0.4 miles outsideChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

Union Pacific has 5.0 track miles in Cuero, on the Union Pacific Cuero Subdivision. Public mapping shows 14 street and rail crossings in the city, so a route near the tracks needs to identify whether it crosses railroad property. Gohlke Creek runs 2.25 channel miles inside the limits, and 9 mapped street crossings intersect named streams. The Guadalupe River is 0.4 miles outside the limits. Those water features make channel depth and access relevant to route planning.

Who approves a bore near US 77 Alternate in Cuero?

Cuero’s city streets, including Broadway Street, belong to the city, while work on US 77 Alternate, US 183, US 87 or another state highway right of way needs a TxDOT utility permit. The line owner, not the drilling contractor, files in TxDOT’s online RULIS system with the TxDOT Yoakum District; we prepare the bore plan and profile for the utility owner. TxDOT cover rules include 60 inches at highway crossings for electric and communication lines, 60 inches for water crossings, and 60 inches for pressurized sewer crossings. A crossing of Union Pacific track needs that railroad’s agreement. Gohlke Creek is checked for U.S. Army Corps of Engineers jurisdiction during planning.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Which utilities serve DeWitt County and Cuero?

The City of Cuero owns its municipal electric system, which reports 3,769 customers to EIA. AEP Texas Central, Guadalupe Valley Electric Cooperative, Karnes Electric Cooperative and Victoria Electric Cooperative also report electric service in DeWitt County, but the line owner for a specific address needs to be established before planning a conduit bore. The City of Cuero public water system uses groundwater wells and serves 9,807 people through 3,066 service connections. That network matters when laying out a new connection near city water lines.

Line ownerWhat it isSourceSize
City of CueroPublic water systemGroundwater wells3,066 connections, 9,807 people served
City of Cuero municipal electric systemCity owned electric systemReports to the U.S. Energy Information Administration3,769 customers reported
AEP Texas Central, Guadalupe Valley Electric Cooperative, Karnes Electric Cooperative and Victoria Electric CooperativeElectric utilities reporting service in DeWitt CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

The American Community Survey 2019 to 2023 five year estimates put Cuero’s median housing year at 1972; 33 percent of homes were built before 1960 and 16 percent in 2000 or later. A replacement bore along Broadway Street may be serving older buried lines, while a newer service can follow different access needs. Before drilling near either, we hydrovac pothole marked utilities on the path because paint shows position, not depth.

Trinity Boring Solutions crew running a 2 inch conduit directional bore with airport hangars and a parked jet in the background in Oklahoma City
Our crew running a 2 inch conduit bore near the hangars at an Oklahoma City airport.

Where is Cuero in relation to Yoakum and our Yukon office?

Cuero is in DeWitt County, whose seat is Cuero. The city covers 6.56 square miles, sits at 196 feet elevation and uses ZIP code 77954. Yorktown is 15.6 miles southwest; Yoakum is 15.6 miles northeast. Cuero is also the county seat, and Victoria, the nearest larger city listed, is 26.3 miles southeast. From our Yukon, Oklahoma yard, the road trip is 494 miles and 9.4 hours. That distance is part of planning mobilization for work around US 77 Alternate.

Places near Cuero

What kinds of bores come up near Henry Street in Cuero?

  • Highway crossing: A line beneath US 77 Alternate is planned as a bore, with the route and cover coordinated through the TxDOT Yoakum District.
  • Water service: A connection near the City of Cuero water system can be bored to avoid opening a paved street between the pits.
  • Fiber conduit: A fiber route along Esplanade Street can pass under driveways and pavement without cutting the surface.
  • Creek crossing: A bore at Gohlke Creek needs depth planning below the channel and a check for federal water jurisdiction.
  • Rail crossing: A route across Union Pacific track needs an agreement from the railroad before the crossing is built.
  • Street replacement: A service under Broadway Street can replace a buried line while leaving the street surface intact.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

How do I get a quote for a Cuero bore near Gohlke Creek?

For a bore near Gohlke Creek or Henry Street, send the address or map pin, what is going in the ground, the pipe or conduit size and the footage; a sketch or plans help. That gives us a starting route and shows whether the work is near a creek, track or paved street.

The mapped clay and gravel around Cuero can set the drilling and reaming effort, so ground conditions lead the price factors. We also account for the number of utilities that need exposure, concrete or pavement, pits and excavator time, and sand backfill. A Union Pacific crossing or work under US 77 Alternate adds crossing and permit coordination. Creek access near Gohlke Creek and mobilization from the Yukon office also affect the job scope.

Questions people ask about boring in Cuero

Does Trinity Boring Solutions take jobs in Cuero and DeWitt County, and who staffs them?

Yes, we take directional boring work in Cuero and DeWitt County. Our main office is in Yukon, and the work is handled by our crews or vetted partner contractor crews working from satellite yards. You deal with Trinity from the first call through the bore log, including work near US 183.

Who controls Henry Street in Cuero, and can a bore avoid cutting it?

Henry Street is a city street because Cuero is incorporated. A directional bore can pass beneath the pavement rather than opening a trench across it, with entry and exit pits placed in the dirt where the site allows. The route and access still need to be planned for the specific Henry Street address.

What do Cuero’s Broadway Street homes and older buried lines mean for replacement bores?

Cuero’s median housing year is 1972, and 33 percent of housing units were built before 1960, according to the American Community Survey 2019 to 2023 five year estimates. A replacement route near Broadway Street may need to connect to older lines or avoid other utilities. We expose marked crossings before drilling close to them.

Can Mabank soil in Cuero corrode steel, and what pipe can be used?

The USDA soil survey maps high steel corrosion risk across 57 percent of Cuero, including areas with Mabank soil. The line owner chooses any coating needed for steel casing or tracer wire. HDPE is not subject to the same soil corrosion concern, but the pipe choice depends on the line and project requirements.

What ground should I expect in Cuero near Mabank soil?

The USDA soil survey maps Mabank soil across 26 percent of Cuero. At about 40 inches down, clay is mapped across 45 percent of the area, while very gravelly loamy sand covers 23 percent. Clay can grip the reamer and pipe; sandy or gravelly ground may need support to keep the bore open.

Will a directional bore in Cuero hit rock?

Bedrock is not mapped in Cuero’s top five feet, which does not establish what lies deeper on a particular route. The geologic map identifies Cenozoic terrace deposits with sand, silt, clay and gravel. A bore near Gohlke Creek still needs a site specific plan because ground materials can vary along the route.

How far is Cuero from the Yukon office, and does Victoria change the job plan?

Cuero is 494 road miles and 9.4 drive hours from our Yukon, Oklahoma yard. Victoria is 26.3 miles southeast of Cuero, but it does not change the Yukon distance. Mobilization is considered along with the bore length, soil, crossings and access around US 77 Alternate.

How much notice does Texas811 need for a Cuero bore near Esplanade Street?

For a bore near Esplanade Street, Texas law requires a locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before it. If the start slips more than 14 days past the original notice, submit a new request. Worn or moved marks must be refreshed through Texas811 before work continues.

What affects the cost of directional boring in Cuero near US 77 Alternate?

The job scope sets the price, not a single local rate. Mabank clay and gravel can affect drilling effort; the number of utilities to expose, pavement, pit work and backfill also matter. A crossing at US 77 Alternate or Union Pacific track adds coordination, while Gohlke Creek and the 494 road miles from Yukon can affect planning and mobilization.

Where the Cuero facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Cuero

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Cuero, Texas

Type the address of your job in Cuero. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Cuero

All counties: Texas county list.