trinityboringsolutions.com

Dumas Texas Directional Boring: Sherm Silty Clay Loam, BNSF Railway, US 287

Quick Answer: US 287 is one of the main obstacles for a utility route, and Trinity Boring Solutions handles directional boring, also called horizontal directional drilling (HDD), in Dumas, Texas. The Yukon, Oklahoma main office is 272 road miles from Dumas, near routes that meet US 287 and US 87. Sherm silty clay loam covers much of the city, so sticky cuttings can build on the reamer. We manage that ground with controlled fluid and staged reaming before pulling pipe.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Dumas bores at a glance

  • County seat of Moore County, Texas. Population 14,834 (Census Bureau 2024 estimate).
  • Road distance from our Yukon, Oklahoma main office: 272 miles, about 5.6 hours of driving.
  • Ground: Sherm soil is mapped on 74 percent of the area, with clay loam about 40 inches down.
  • Rock: no bedrock is mapped in the top 60 inches.
  • Highways inside the boundary: US 287, US 87, FM 2203, Texas State Highway 152 and FM 722. State permit office: TxDOT Amarillo District.
  • Railroad track inside the boundary: BNSF Railway, with 2 mapped street and rail crossings.
  • Public water: City of Dumas, groundwater wells.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who can I call for directional boring near BNSF Railway in Dumas?

Trinity Boring Solutions takes directional boring work in Dumas, Moore County, including water, sewer, gas, electric conduit and fiber routes near US 287 or local streets. The Census Bureau Vintage 2024 estimate puts the city population at 14,834. We plan each installation to suit the route, access and existing lines rather than assume one layout fits every address.

Our main office is in Yukon, Oklahoma, and Dumas work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our family business began in 1965, and we have done directional boring since 1982, experience we bring to planning work in Dumas. The roughly 4,100 foot, 48 inch casing bore under the Arkansas River in Tulsa shows our reach; a Dumas route near BNSF Railway is typically a smaller local crossing.

Trinity Boring Solutions Ditch Witch JT922 HDD rig and vacuum excavation truck on a commercial bore in Oklahoma City
Our Ditch Witch JT922 drill and vacuum excavation truck on a commercial bore in Oklahoma City. Photos on this page are from our jobs in Oklahoma and Texas.

How does Sherm soil affect drilling in Dumas?

Sherm silty clay loam is the main mapped ground condition in Dumas, covering 74 percent of the city area in the USDA soil survey. At about 40 inches below the surface, the survey maps clay loam across 93 percent of the area and an average clay content of 34 percent. Heavy clay is mapped across 87 percent at that depth. For Dumas planning, we treat these mapped patterns as planning context, not test borings or verified subsurface conditions. Sticky clay can cling to a reamer and grip the pipe, so the drilling plan needs careful fluid control and staged enlargement.

USDA soil survey, inside the Dumas city limitsWhat is mapped
Soil series mappedSherm 74 percent, Sunray 8 percent, Gruver 5 percent and Mobeetie 3 percent
Texture at the surfacesilty clay loam 74 percent, loam 14 percent and clay loam 6 percent
Texture about 40 inches downclay loam 93 percent and fine sandy loam 3 percent
Engineering class about 40 inches downlean clay (CL) 93 percent and silty clayey sand (SC SM) 3 percent
Average clay content about 40 inches down34 percent
Bedrock mapped within 60 inchesNone mapped
Seasonal water table within 60 inches0 percent of the area
Flood prone soils0 percent of the area
High corrosion risk for uncoated steel79 percent of the area

The USDA soil survey does not map bedrock in the top five feet of Dumas, and it shows no seasonal water table or flood prone soils. That supports planning pits without a mapped shallow water issue, but it does not rule out deeper rock. High steel corrosion risk is mapped across 79 percent of the area, so casing and tracer wire material choices need attention from the line owner. The Eolian Sheet Sand unit is Pleistocene age and includes silty to clayey fine sand, which can change the ground mix along a bore.

How do crews handle Dumas clay loam?

For Dumas clay loam, we keep the hole stable without overworking sticky soil, then pull pipe while the bore is ready. Sherm soil and the route near US 287 shape the setup.

  1. Sherm soil can stick to the reamer, so we use controlled fluid and staged enlargement before pulling the line through the Dumas bore.
  2. With clay loam mapped at about 40 inches across most of Dumas, we watch fluid returns and avoid pressure that could lift pavement near US 287.
  3. Before the drill approaches any marked utility, we hydrovac pothole it; near Maddox Avenue, that exposes the actual line depth instead of relying on paint.
  4. We follow the drill head from the surface with a walkover locator and log depth and pitch as the route advances past Dumas streets.
Bore pit with a 6 inch PVC sleeve, traffic cones and blue water line flags at NE 24th Street in Oklahoma City
A bore pit with a 6 inch PVC sleeve, traffic cones and blue water line flags at NE 24th Street in Oklahoma City.

Where does a line have to go under Maddox Avenue in Dumas?

A route beneath US 287 or US 87 in Dumas calls for a planned bore rather than cutting existing highway pavement. FM 2203, Texas State Highway 152 and FM 722 also run within city limits, so the road owner and right of way matter. Maddox Avenue is the longest named street at 3.59 miles in the city, followed by 5th Street at 3.09 miles and 8th Street at 2.71 miles. Dumas Avenue also carries US 87 and US 287, making utility location and access key parts of the crossing plan.

CrossingTypeMapped extentWho has a say
US 287US highway3.6 roadway miles insideState highway office
US 87US highway3.1 roadway miles insideState highway office
FM 2203State highway2 roadway miles insideState highway office
Texas State Highway 152State highway1.5 roadway miles insideState highway office
FM 722State highway1 roadway miles insideState highway office
BNSF RailwayRailroad2.2 track miles insideThe railroad
Swipe the table sideways to see every column.

BNSF Railway has 2.2 track miles in Dumas on the Boise City Subdivision, so a route crossing its track needs railroad coordination. Public mapping records two street and rail crossing locations in the city. No named streams or lakes and ponds are mapped within the stated local areas; the map does show 0.18 miles of unnamed drainage inside the limits. That drainage still needs to be considered when laying out pits and the bore path.

Whose permission does a Dumas bore in Moore County need?

For work in the right of way of US 287, US 87, FM 2203, Texas State Highway 152 or FM 722, the line owner needs a TxDOT utility permit reviewed by the Amarillo District. The utility owner files through TxDOT RULIS; we prepare the bore plan and profile for that application and work under the owner’s permit. TxDOT requires boring or tunneling beneath existing highway pavement, with crossings encased and rural bores extending beneath all travel lanes. Dumas city streets belong to the city. A crossing of BNSF Railway track also needs an agreement with the railroad, which sets crossing conditions.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Who owns the water lines near the City of Dumas system?

The City of Dumas owns the public water system, which draws from groundwater wells and reports 5,884 service connections for 14,935 people. That network is a useful starting point when planning a water route near Dumas Avenue, but the address and line owner still need to be confirmed. Southwestern Public Service and Rita Blanca Electric Cooperative report electric service in Moore County. We confirm the owner for the specific route before planning an electric conduit bore.

Line ownerWhat it isSourceSize
City of DumasPublic water systemGroundwater wells5,884 connections, 14,935 people served
Southwestern Public Service and Rita Blanca Electric CooperativeElectric utilities reporting service in Moore CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

The American Community Survey 2019 to 2023 five year estimates put Dumas housing’s median year built at 1972; 29 percent was built before 1960, while 14 percent dates to 2000 or later. A replacement line near 5th Street may meet older buried services, while a newer service still has to avoid existing utilities. We hydrovac expose each marked utility on the bore path before drilling near it; paint near Maddox Avenue shows position, not depth.

Yellow polyethylene gas pipe pulled through a directional bore beside a commercial building
Yellow polyethylene gas pipe pulled through a directional bore beside a commercial building.

Do you cover Dumas and Sunray soil routes?

Dumas is the Moore County seat in the TxDOT Amarillo District, with 5.53 square miles of city area and ZIP code 79029. It sits at an elevation of 3,651 feet. Cactus is 12.8 miles north, and Sunray is 13.4 miles northeast; Channing is 24.1 miles southwest and Hartley is 24.3 miles west. Dumas is approximately 40 miles north of Amarillo. From our Yukon yard, the road trip is 272 miles and about 5.6 hours, a distance that can affect crew mobilization for a Dumas job.

Places near Dumas

Which jobs call for a bore near 5th Street in Dumas?

  • Highway crossing: A route under US 287 or US 87 keeps pavement intact while carrying a utility beneath the roadway.
  • Water service: A new or replacement water line near the City of Dumas system needs a path clear of marked services.
  • Fiber route: Fiber conduit along 5th Street can cross under pavement without opening a continuous trench.
  • Rail crossing: A utility under the BNSF Railway track needs an agreed crossing plan and railroad coordination.
  • Street crossing: A bore beneath Maddox Avenue can keep the street surface uncut while connecting utility routes.
  • Drainage crossing: The mapped unnamed drainage in Dumas calls for a route and pit layout that account for the channel.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

How do I get a quote for a Dumas bore under US 287?

For a Dumas route near US 287, send the address or map pin, what will go in the ground, the pipe or conduit size and the footage. A sketch or plans help us see the route around streets such as Maddox Avenue and identify likely crossings before we plan the work.

A straightforward route on Sherm soil with clear access is simpler to plan than one with sticky clay, pavement or several marked utilities. Length, pipe or conduit size, soil, exposed crossings, pits, excavator time and backfill all shape the scope. A bore beneath US 287 or BNSF Railway adds coordination and crossing details. The 272 road miles from Yukon also affect mobilization, while drainage near a route can change pit placement.

Questions people ask about boring in Dumas

Does Trinity take directional boring jobs in Moore County, and who staffs Dumas work?

Yes. We take directional boring work in Dumas and across Moore County, with our own crews and partners from satellite yards. From the first call through the bore log, we keep your work with Trinity consistent, regardless of which crew is on site in Dumas. A route near US 287 is planned around its crossings, access and marked utilities.

What does a Dumas bore under BNSF Railway need?

A crossing under the BNSF Railway track in Dumas needs an agreement with the railroad that owns it. The railroad sets the crossing conditions, including casing, depth and flagging. The BNSF Railway Boise City Subdivision has 2.2 track miles in the city, so its specific route and requirements need to be addressed before drilling.

Who runs Dumas public water, and where does its water come from?

The City of Dumas owns the public water system, and its source is groundwater wells. Public records list 5,884 service connections and 14,935 people served in Dumas, figures we keep in view when planning underground work. For a proposed tie in near Dumas Avenue, the route and the line owner at that address still need to be checked before a bore is laid out.

Who owns electric lines in Moore County near Dumas, and who confirms conduit specs?

Southwestern Public Service and Rita Blanca Electric Cooperative report electric service in Moore County. Those records do not identify the provider for every Dumas address. The line owner confirms conduit specifications for the particular route, including one near US 87, before we plan an electric conduit bore.

Who is responsible for Dumas streets such as 8th Street, and must the pavement be cut?

The city is incorporated, so Dumas city streets such as 8th Street belong to the city itself. A directional bore can pass below the pavement without an open cut across the street. We still plan pits, access and marked utility exposure around the specific route and surface conditions.

What does Dumas housing age near 5th Street mean for replacement bores?

Dumas housing has a median year built of 1972 in American Community Survey 2019 to 2023 estimates, and 29 percent was built before 1960. Replacement work near 5th Street may encounter older buried services, so we expose marked utilities before drilling close to them and plan the new route around what is found.

What bore sizes and lengths can Trinity handle for a Dumas Avenue job?

For a Dumas Avenue project, we handle bores from 3/4 inch service lines up to 48 inch casing, with lengths from 10 feet to 5,000 feet. The size and length affect the equipment and bore plan, and a route under US 287 or across several utilities may need additional planning.

How much notice does Texas811 need for a Dumas bore near Maddox Avenue?

For a bore near Maddox Avenue, make the Texas811 locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before work. Texas811 describes this as at least two working days. If the start slips more than 14 days past the original notice, submit a new request; refresh worn or moved marks before continuing.

What affects the cost of directional boring in Dumas under US 287?

The Dumas bore details determine the price, not a single standard rate. Length, pipe size, Sherm soil, pavement, utilities that need exposure, pits, backfill and equipment time all matter. A US 287 crossing can add permit and casing requirements, and the 272 road miles from Yukon affect mobilization.

Where the Dumas facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Dumas

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Dumas, Texas

Type the address of your job in Dumas. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Dumas

All counties: Texas county list.