trinityboringsolutions.com

Channing Texas Directional Boring: Dallam Soil, US 385 and BNSF Railway

Quick Answer: We take directional boring and horizontal directional drilling (HDD) work in Channing, including routes beneath US 385 and BNSF Railway tracks. The Yukon office is 311 road miles away, and Rock Island Avenue work is staffed by our own crews or vetted partner crews. Dallam soil is fine sandy loam at the surface, with clay loam common about 40 inches down. That clay can grip the pipe, so the ream and pull need to be planned together.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Channing bores at a glance

  • County seat of Hartley County, Texas. Population 259 (Census Bureau 2024 estimate).
  • Road distance from our Yukon, Oklahoma main office: 311 miles, about 5.8 hours of driving.
  • Ground: Dallam soil is mapped on 31 percent of the area, with clay loam about 40 inches down.
  • Rock: no bedrock is mapped in the top 60 inches.
  • Highways inside the boundary: US 385, FM 767 and Texas State Highway 354. State permit office: TxDOT Amarillo District.
  • Railroad track inside the boundary: BNSF Railway, with 2 mapped street and rail crossings.
  • Public water: Channing Water Works, groundwater wells.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Does anyone handle Channing directional boring near BNSF Railway?

Channing is 311 road miles from our Yukon office, so we plan crew travel alongside work near BNSF Railway or US 385. We take jobs across Texas with our own crews and partner contractor crews. The Census Bureau Vintage 2024 estimate puts Channing at 259 residents. A bore along 7th Street could carry water, sewer, gas, electric conduit or fiber, depending on the job.

Our main office is in Yukon, Oklahoma, and Channing work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our longest bore was roughly 4,100 feet with 48 inch pipe under the Arkansas River in Tulsa. Against that reach, a Channing service line or crossing is a shorter, more typical job, planned around local ground and access.

Horizontal directional drill rig set up on an open grass field with support trucks and a vacuum excavation truck
Our horizontal directional drill set up in an open field with the support trucks and the vacuum excavation truck. Photos on this page are from our jobs in Oklahoma and Texas.

How does Dallam soil affect a bore in Channing?

The USDA soil survey maps Dallam soil across 31 percent of Channing, with Dumas soil at 29 percent, Sunray at 25 percent and Gruver at 15 percent. Surface texture is loam across 69 percent and fine sandy loam across 31 percent. About 40 inches down, the mapped texture is clay loam across 69 percent and sandy clay loam across 31 percent. Average clay content at that depth is 32 percent. These are mapped soil patterns, not test borings, but the clay rich profile can make the reamer sticky and hold an open hole.

USDA soil survey, inside the Channing city limitsWhat is mapped
Soil series mappedDallam 31 percent, Dumas 29 percent, Sunray 25 percent and Gruver 15 percent
Texture at the surfaceloam 69 percent and fine sandy loam 31 percent
Texture about 40 inches downclay loam 69 percent and sandy clay loam 31 percent
Engineering class about 40 inches downlean clay (CL) 100 percent
Average clay content about 40 inches down32 percent
Bedrock mapped within 60 inchesNone mapped
Seasonal water table within 60 inches0 percent of the area
Flood prone soils0 percent of the area
High corrosion risk for uncoated steel15 percent of the area

The USDA soil survey does not map bedrock within 60 inches in Channing, so the shallow route is not mapped as a rock bore. It also maps no seasonal water table or flood prone soils in the city limits. High steel corrosion risk is mapped across 15 percent, so the line owner should consider casing and tracer wire materials there; HDPE avoids that steel concern. The Blackwater Draw Formation is Cenozoic and includes sand, silt and locally clayey material. Cenozoic sedimentary rocks are also mapped as Paleocene, so field conditions still need checking along the planned route.

What does it take to bore Channing clay loam?

Channing’s clay loam calls for controlled drilling fluid and staged reaming. Along a route near Rock Island Avenue, we expose marked utilities before drilling close and track the head as the bore advances.

  1. In Dallam soil, clay loam is common about 40 inches down, so we use thinner fluid with polymer and ream in stages to limit sticky buildup.
  2. We plan to pull pipe soon after opening the hole near Rock Island Avenue, because clay can swell around the pipe and make the pull harder.
  3. Before drilling near 7th Street, we hydrovac pothole each marked utility on the route; surface paint does not show its depth.
  4. A walkover locator tracks the drill head along the Channing route, while we log depth and pitch through each rod.
Drilling fluid returns at the entry as the Vermeer D24x40 S3 drills a 385 foot sandstone rock bore in Guthrie, Oklahoma
Drilling fluid coming back to the entry pit as our Vermeer D24x40 drills a 385 foot bore in Guthrie, Oklahoma.

Where might a Channing line go under US 385?

US 385 runs 1.1 mapped roadway miles inside Channing; FM 767 adds 0.6 miles and Texas State Highway 354 adds 0.3 miles. A line crossing existing highway pavement goes beneath it by boring or tunneling, with casing and the required cover set through the permit. Rock Island Avenue is the longest named street at 1.04 miles in the city. 7th Street has 0.96 miles, and Greenwood Avenue has 0.78 miles. The route and marked utilities determine where entry and exit pits can sit without cutting those surfaces.

CrossingTypeMapped extentWho has a say
US 385US highway1.1 roadway miles insideState highway office
FM 767State highway0.6 roadway miles insideState highway office
Texas State Highway 354State highway0.3 roadway miles insideState highway office
BNSF RailwayRailroad1.4 track miles insideThe railroad
Middle Cheyenne CreekStream nearby0.8 miles outsideChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

BNSF Railway owns 1.4 track miles within Channing, on the BNSF Railway Dalhart Subdivision. Public records map 2 street and rail crossings in the city, so a route near the tracks needs careful alignment. Middle Cheyenne Creek is 0.8 miles outside the city limits, and no named stream crossing is mapped inside Channing. Within one mile of Channing, we find no mapped lakes or ponds, so those features are not shown as constraints in our route review. A proposed creek route still needs planning for the channel and a check for federal jurisdiction.

Do I need a permit to bore under a Channing road in Hartley County?

For a bore in Channing city streets, the city controls its streets; we do not assume a permit process beyond the applicable approvals. For US 385, FM 767 or Texas State Highway 354 right of way, the line owner files the utility application through TxDOT’s RULIS system, and the TxDOT Amarillo District reviews it. We give the owner the bore plan and profile and work under its issued permit. TxDOT cover requirements vary by line type, with 60 inches at highway crossings for electric, communication and water lines, and pressurized sewer. A BNSF Railway crossing needs an agreement with BNSF that sets the crossing conditions. Middle Cheyenne Creek is checked for Army Corps jurisdiction during planning.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Whose lines are already buried near Channing Water Works?

Channing Water Works is a local government system that draws from groundwater wells. It serves 265 people through 176 service connections, so a bore near the system needs utility locations checked before the drill approaches. Electric service reported in Hartley County includes Southwestern Public Service, Rita Blanca Electric Cooperative and Southwestern Electric Cooperative. We confirm the electric line owner for the specific route before planning a conduit bore, since countywide reporting does not identify the provider at every Channing address.

Line ownerWhat it isSourceSize
Channing Water WorksPublic water systemGroundwater wells176 connections, 265 people served
Southwestern Public Service, Rita Blanca Electric Cooperative and Southwestern Electric CooperativeElectric utilities reporting service in Hartley CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

Channing’s median housing year is 1966 in the American Community Survey 2019 to 2023 five year estimates, so we assess each bore route separately. The estimates place 43 percent of homes before 1960, 44 percent from 1960 to 1999 and 13 percent in 2000 or later. A replacement bore along 7th Street may need to avoid older buried services as well as newer connections. We hydrovac pothole marked utilities on the path first, since paint shows position but not depth.

Trinity Boring Solutions crew running a 2 inch conduit directional bore with airport hangars and a parked jet in the background in Oklahoma City
Our crew running a 2 inch conduit bore near the hangars at an Oklahoma City airport.

How far is Channing from Dumas and our Yukon office?

Channing is in Hartley County and serves as its county seat. The city covers 0.99 square miles, sits at 3,801 feet and uses ZIP code 79018. Boys Ranch is 11.1 miles southeast, Hartley is 15.4 miles north, and Dumas is 24.1 miles northeast. Dumas is the nearest larger city. Dalhart is 27.8 miles north and Vega is 30.7 miles south. From our Yukon office, Channing is 311 road miles and a 5.8 hour drive, which makes mobilization part of planning for work on Rock Island Avenue or US 385.

Places near Channing

What boring work comes up near Middle Cheyenne Creek in Channing?

  • Highway crossing: A bore under US 385 keeps the travel lanes intact, with the line owner arranging the TxDOT utility permit.
  • Water service: A proposed service near Channing Water Works needs its groundwater system connections located before the drill approaches.
  • Fiber route: A conduit bore along Rock Island Avenue can pass beneath pavement while entry and exit pits stay in the dirt.
  • Rail crossing: A route under BNSF Railway needs the railroad’s agreement to set crossing details for its 1.4 track miles in Channing.
  • Creek crossing: A proposed route near Middle Cheyenne Creek needs channel depth planning and a jurisdiction check during design.
  • Street replacement: A bore along 7th Street can replace a buried line without opening the street surface along the route.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

What should I send for a Channing bore near Rock Island Avenue?

For a proposed bore near Rock Island Avenue, start with the address or a map pin. Tell us what will go in the ground, such as a water line or fiber conduit, then give the pipe or conduit size and footage. A sketch or plans help show whether the route approaches US 385, BNSF Railway or existing services.

The route details drive the estimate. Dallam soil and the clay loam mapped below the surface affect drilling and reaming. Crossings and exposed utilities matter, especially where a route meets US 385 or BNSF Railway. Pavement, concrete, pits, excavator time and sand backfill also change the work. Channing’s 311 road miles from Yukon affect mobilization, while a creek crossing, high profile schedule or emergency response can add planning and crew demands.

Questions people ask about boring in Channing

Does Trinity take directional boring jobs in Channing, Hartley County?

Yes. We take directional boring work in Channing and staff it with our own crews or partner crews from vetted satellite yards. Our Yukon office is 311 road miles away, so travel is planned with the job. A proposed route under US 385 or along Rock Island Avenue can be handled as a Texas project.

How do Channing homes and buried lines near 7th Street affect replacement bores?

Channing’s median housing year is 1966 in the American Community Survey 2019 to 2023 five year estimates. Older homes along 7th Street may have services that need careful locating before a replacement route is drilled. We pothole marked lines on the bore path to check their depth and position.

What ground does a Channing bore pass through in Dallam soil?

The USDA soil survey maps Dallam soil across 31 percent of Channing, and clay loam across 69 percent at about 40 inches down. That clay rich layer can cling to a reamer and grip the pipe. The mapped figures describe soil patterns, not conditions proven by a test boring at a specific address.

Along US 385 in Channing, can we determine whether a directional bore will hit rock only after reviewing site specific subsurface conditions?

Bedrock is not mapped within 60 inches in Channing, but that does not rule out rock at greater depth. The geologic map shows the Cenozoic Blackwater Draw Formation, with sand, silt and locally clayey material, as well as Paleocene Cenozoic sedimentary rocks. The actual route still needs to be assessed.

For a bore under US 385 in Channing, which road authority should we contact to confirm approval requirements before work?

For work in US 385 right of way, the line owner submits the utility permit through TxDOT’s RULIS system, and the TxDOT Amarillo District reviews it. We prepare the bore plan and profile for the owner’s application and work under the permit issued to that owner.

For a crossing beneath BNSF Railway in Channing, what railroad review and authorization should we confirm before planning the bore?

A crossing beneath BNSF Railway needs an agreement with the railroad that owns the track. The agreement sets crossing conditions such as casing, depth and flagging. BNSF Railway has 1.4 track miles within Channing, so the proposed route and crossing location need to be part of the review.

What bore sizes and lengths can you handle for a Channing job near 4th Street?

We handle lines from 3/4 inch service lines up to 48 inch casing, and bore lengths from 10 feet to 5,000 feet. A proposed route near 4th Street still needs its own size and footage review, including marked utilities and the space available for entry and exit pits.

How much 811 notice do I need for Channing work near Rock Island Avenue?

Texas811 requires a locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before it. A Rock Island Avenue ticket has a 20 day life. If the start slips more than 14 days past the original notice, request a new ticket; worn or moved marks must be refreshed through Texas811 before work continues.

Near US 385 in Channing, what crossing requirements and site conditions should we evaluate when estimating directional boring costs?

The price depends on the route and scope, not just its length. Dallam soil conditions, pipe size, footage, exposed utilities, pavement and the number of crossings all matter. Work beneath US 385 or BNSF Railway needs crossing coordination, while Channing’s 311 road miles from Yukon affect mobilization.

Where the Channing facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Channing

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Channing, Texas

Type the address of your job in Channing. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Channing

All counties: Texas county list.