Lovelady Texas Directional Boring: Herty Loam, Clay At Depth And Union Pacific

Quick Answer: What does the top five feet look like in Lovelady? The USDA soil survey maps Herty loam near the surface and weathered bedrock within 60 inches in parts of town. Trinity Boring Solutions does directional boring, also called horizontal directional drilling (HDD), beneath local roads such as Texas State Highway 19. From our Yukon, Oklahoma main office, Lovelady is 393 road miles away, and Union Pacific track is another route constraint. Clay mapped at about 40 inches can grip a reamer, so we plan staged passes.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Lovelady bores at a glance

  • Incorporated city in Houston County, Texas. Population 590 (Census Bureau 2024 estimate).
  • Road distance from our Yukon, Oklahoma main office: 393 miles, about 7.8 hours of driving.
  • Ground: Herty soil is mapped on 30 percent of the area, with clay about 40 inches down.
  • Rock: bedrock is mapped within 60 inches on 47 percent of the area.
  • Highways inside the boundary: Texas State Highway 19, FM 1280 and FM 230. State permit office: TxDOT Lufkin District.
  • Railroad track inside the boundary: Union Pacific, with 3 mapped street and rail crossings.
  • Public water: City of Lovelady, surface water bought from another system.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Which contractor handles Lovelady bores near Union Pacific track?

Lovelady is in Houston County, where the Census Bureau Vintage 2024 estimate puts the population at 590. We take directional boring work here for water, sewer, gas, electric conduit and fiber, routing lines beneath streets such as Commerce Street or toward the City of Lovelady water system. A map pin helps us see whether a route meets road pavement or the Union Pacific corridor.

Our main office is in Yukon, Oklahoma, and Lovelady work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our family business started in 1965, and we have done directional boring since 1982; Lovelady clay shapes our crossing plans. That experience supports Lovelady work ranging from 3/4 inch service lines near Barbee Street to 48 inch casing, with bore lengths from 10 feet to 5,000 feet.

Trinity Boring Solutions directional boring crew, drill rig and hydrovac trailer staged along an airport service road at Will Rogers World Airport in Oklahoma City
Our boring crew, drill and hydrovac trailer staged along a service road at Will Rogers World Airport in Oklahoma City. Photos on this page are from our jobs in Oklahoma and Texas.

What kind of ground does Lovelady have around Herty soil?

The USDA soil survey maps Herty soil across 30 percent of Lovelady, with Fuller fine sandy loam across 24 percent and Moswell loam across 15 percent. At the surface, fine sandy loam covers 51 percent of the mapped area and loam covers 47 percent. At about 40 inches below the surface, clay accounts for 47 percent of mapped texture, loam for 38 percent and sandy clay loam for 13 percent. Average clay content at that depth is 40 percent. These are mapped patterns, not results from a test boring at a particular address.

USDA soil survey, inside the Lovelady city limitsWhat is mapped
Soil series mappedHerty 30 percent, Fuller 24 percent, Moswell 17 percent, Kurth 13 percent and Keltys 11 percent
Texture at the surfacefine sandy loam 51 percent and loam 47 percent
Texture about 40 inches downclay 47 percent, loam 38 percent and sandy clay loam 13 percent
Engineering class about 40 inches downfat clay (CH) 47 percent, lean clay (CL) 38 percent and clayey sand (SC) 13 percent
Average clay content about 40 inches down40 percent
Bedrock mapped within 60 inches47 percent of the area (0 percent hard rock, 47 percent weathered rock)
Seasonal water table within 60 inches81 percent of the area
Flood prone soils1 percent of the area
High corrosion risk for uncoated steel95 percent of the area

The USDA soil survey maps weathered bedrock within 60 inches across 47 percent of Lovelady, with a typical depth of 47 inches; it does not map bedrock within 40 inches. A seasonal water table is mapped within 60 inches across 81 percent and within 40 inches across 78 percent, so pits near Houston Street may need pumping. Flood prone soils cover 1 percent of the mapped area. The survey flags high steel corrosion risk across 95 percent, which matters for steel casing and tracer wire. The geologic map names Quartz Sand Decomposition Residuum, Cenozoic sand, and Yegua Formation, Bartonian clay with sandstone. The clay can cling to a reamer, while sand calls for support to keep an open hole from sloughing.

What does it take to bore Lovelady clay while planning a suitable underground crossing?

Lovelady has fine sandy loam near the surface and clay mapped deeper down. Along Commerce Street, we match the fluid and reaming plan to the ground, then track the drill head from the surface.

  1. In Lovelady’s clay mapped at about 40 inches, we use controlled fluid and staged reaming to limit sticky buildup on the reamer.
  2. Where Herty soil overlies clay, we watch fluid returns near Commerce Street so pressure does not lift pavement or slabs.
  3. With a seasonal water table mapped within 40 inches across 78 percent of Lovelady, we keep pits small and pump water as needed.
  4. Before a bore near Houston Street, we hydrovac marked utilities on the path and track the drill head from the surface, logging depth and pitch.
Rod box on the Vermeer D24x40 S3 Navigator with the bore path heading toward the trees on a rock bore in Guthrie, OK
Rod box on our Vermeer D24x40 with the bore path heading toward the trees on a rock bore in Guthrie, Oklahoma.

What is in the way of a new line in Lovelady near Commerce Street?

Texas State Highway 19 runs 1.4 mapped roadway miles inside Lovelady. FM 1280 accounts for 1.3 miles and FM 230 for 0.7 miles inside city limits. Commerce Street is the longest named street at 1.68 miles, followed by Houston Street at 1.32 miles and Cox Street at 0.7 miles. A route under existing highway pavement is bored or tunneled rather than trenched through the pavement. These road lengths help identify where a crossing or a run along the right of way may shape the bore plan.

CrossingTypeMapped extentWho has a say
Texas State Highway 19State highway1.4 roadway miles insideState highway office
FM 1280State highway1.3 roadway miles insideState highway office
FM 230State highway0.7 roadway miles insideState highway office
Union PacificRailroad1.75 track miles insideThe railroad
Swipe the table sideways to see every column.

Union Pacific has 1.75 track miles in Lovelady on its Palestine Subdivision, and public mapping shows three street and rail crossings. A bore that meets the Union Pacific track needs an agreement with the railroad owner covering casing, depth and flagging. No named streams are mapped inside the city or within one mile, and no lakes or ponds are mapped within one mile. The survey does show 1.74 miles of unnamed drainage inside Lovelady, so a route near that drainage needs attention to its path and pits.

Who has to sign off on Lovelady work near Union Pacific?

Lovelady is incorporated, so its city streets, including Cox Street, belong to the city. Work in the right of way of Texas State Highway 19, FM 1280 or FM 230 needs a TxDOT utility permit reviewed by the Lufkin District. The utility owner files through RULIS, and we prepare the bore plan and profile for that filing. TxDOT cover rules depend on the line: electric and communication crossings need 60 inches, while water crossings need 60 inches and water running along the right of way needs 36 inches. A Union Pacific track crossing follows an agreement with its owner. No named stream crossing is mapped in Lovelady.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

What is already in the ground in Houston County near Lovelady?

The City of Lovelady public water system uses purchased surface water and lists 401 service connections serving 990 people. For electric service in Houston County, utilities reporting to EIA include Entergy Texas, Oncor Electric Delivery Company and Houston County Electric Cooperative. Those county reports do not identify the provider at every Lovelady address, so we confirm the line owner before planning an electric conduit bore near the city water system.

Line ownerWhat it isSourceSize
City of LoveladyPublic water systemSurface water bought from another system401 connections, 990 people served
Entergy Texas, Oncor Electric Delivery Company and Houston County Electric CooperativeElectric utilities reporting service in Houston CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

The American Community Survey 2019 to 2023 five year estimates put Lovelady’s median housing year at 1979, guiding us to assess each underground route on site. The estimates place 14 percent of housing before 1960, 70 percent from 1960 to 1999 and 16 percent in 2000 or later. On Houston Street, those ages make replacement routes as relevant as new service runs, but house age alone does not establish the age of a buried line. We hydrovac pothole marked utilities on the bore path before drilling near them, since paint shows position rather than depth.

Large HDPE conduit reels staged on a Rotate A Reel trailer for a fiber and utility installation in Oklahoma
HDPE conduit reels on a reel trailer for a fiber and utility installation in Oklahoma.

What is near Lovelady for Trinity crews serving the area?

Lovelady is an incorporated city in Houston County, with 1.32 square miles of land and an elevation of 296 feet. The city is in ZIP code 75851. Crockett, the county seat and nearest larger city, is 13.1 miles north; Trinity is 13.4 miles south, and Westwood Shores is 15.0 miles southeast. Latexo is 18.3 miles north and Groveton is 19.5 miles east. Lovelady is 393 road miles and a 7.8 hour drive from our Yukon, Oklahoma main office, so mobilization is part of planning for a job on Commerce Street or Texas State Highway 19.

Places near Lovelady

Which jobs call for a bore near Cox Street in Lovelady?

  • Highway crossing: A bore beneath Texas State Highway 19 avoids cutting its pavement, with the crossing planned to meet TxDOT requirements.
  • Water service: A service route near the City of Lovelady water system can connect a property while leaving Houston Street pavement uncut.
  • Fiber conduit: A conduit run along Commerce Street can pass below the roadway rather than opening a trench through it.
  • Rail crossing: A route that meets Union Pacific track in Lovelady needs the railroad owner’s crossing agreement and its conditions for casing and depth.
  • Utility replacement: A replacement bore near Cox Street can route a new line around marked utilities exposed before the drill approaches.
  • Drainage crossing: A bore near Lovelady’s 1.74 miles of unnamed drainage needs a route and pit plan suited to the channel.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

What should I send for a Lovelady quote near Texas State Highway 19?

A map pin matters on Texas State Highway 19 because the exact route can put a bore on pavement, a right of way or near the Union Pacific track. For a Lovelady clay crossing, send the address or pin, what will go underground, the pipe or conduit size and the footage. A sketch or plans help us check the route near Commerce Street before we set the work scope.

The drive from Yukon is 393 road miles, so Lovelady mobilization is one part of the job. Length and pipe size matter, as do the clay mapped near 40 inches and the weathered bedrock mapped in parts of town. We also account for utility crossings to expose, pavement on Texas State Highway 19, Union Pacific track requirements, pits, excavator time and sand backfill. Drainage near the route, high profile work or emergency timing can add planning and equipment needs.

Questions people ask about boring in Lovelady

Does Trinity Boring Solutions take jobs in Lovelady and Houston County, and how are crews assigned?

Yes. We take directional boring work in Lovelady and elsewhere in Texas. Our crews work from the Yukon main office and from satellite yards operated by drilling contractor partners we have vetted. You work with Trinity from the first call through the bore log, whether the job is near Commerce Street or elsewhere in Houston County.

Which electric company should I ask about a conduit bore in Lovelady and Houston County?

Utilities reporting electric service in Houston County include Entergy Texas, Oncor Electric Delivery Company and Houston County Electric Cooperative. Those reports do not identify the provider at every address, including one on Cox Street. We confirm the line owner for the specific route, then check conduit specifications with that owner before planning the bore.

Who controls Lovelady streets such as Cox Street, and can a bore avoid cutting one?

Lovelady is incorporated, so Cox Street is a city street. A directional bore can place a line beneath pavement instead of cutting an open trench through the street. The route still needs to account for marked utilities and any applicable right of way approvals, particularly where Cox Street meets a state highway.

How old are Lovelady homes and buried lines near Houston Street, and does that favor replacement bores?

The American Community Survey 2019 to 2023 five year estimates give Lovelady a median housing year of 1979, with 70 percent of housing built from 1960 to 1999. That can make replacement work relevant near Houston Street, but housing age does not tell us the age or depth of a particular buried line. Near marked utilities on Lovelady clay crossings, we expose them before drilling to protect the planned underground route.

Can groundwater or flood prone ground affect bore pits in Lovelady’s Herty soil?

It can. The USDA soil survey maps a seasonal water table within 40 inches across 78 percent of Lovelady, while flood prone soils cover 1 percent. Where Herty soil is mapped, we plan pit placement for wet ground and can pump water from pits. The route and drainage conditions at the actual site still matter.

Does Lovelady’s Herty soil corrode steel, and what pipe can a bore use?

The USDA soil survey maps high steel corrosion risk across 95 percent of Lovelady. That is a material concern for uncoated steel casing and tracer wire. HDPE does not share that soil corrosion concern, but the line owner selects suitable materials and any coating for a route near Herty soil.

What bore sizes and lengths can Trinity handle for work near Barbee Street in Lovelady?

We handle lines from 3/4 inch service size up to 48 inch casing, with bore lengths from 10 feet to 5,000 feet. A job near Barbee Street still depends on the route, soil and crossings, including any marked utilities. The address, line size and footage help us choose an appropriate plan.

How much 811 notice does a Lovelady bore near Commerce Street need, and what if marks move?

Texas811 needs a locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before work. If a Commerce Street start slips more than 14 days beyond the original notice, make a new request. For Lovelady work, we have worn or moved marks refreshed through Texas811 before drilling continues.

What affects the cost of a Lovelady bore near Texas State Highway 19?

The job details set the price, with no single route feature deciding it. Length, pipe or conduit size, Lovelady’s clay and weathered bedrock, the number of utilities to expose, and pavement on Texas State Highway 19 all affect the scope. Union Pacific crossings, pits, excavator time, backfill, emergency timing and the 393 road miles from Yukon can also change what the work requires.

Where the Lovelady facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Lovelady

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Lovelady, Texas

Type the address of your job in Lovelady. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.