Latexo Texas Directional Boring: Latex Loam, US 287 and Union Pacific Track
Quick Answer: Latexo is a small incorporated city, so its city streets belong to the city itself; a bore near Old Latexo Road can pass under pavement without an open cut. Trinity Boring Solutions takes directional boring, also called horizontal directional drilling (HDD), for lines crossing US 287. Latexo is 356 road miles from our Yukon, Oklahoma main office, with Union Pacific track also crossing the city. Latex soil is common, and clay mapped below the surface can grip the reamer and pipe.
Latexo bores at a glance
- Incorporated city in Houston County, Texas. Population 243 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 356 miles, about 7.3 hours of driving.
- Ground: Latex soil is mapped on 37 percent of the area, with clay about 40 inches down.
- Rock: bedrock is mapped within 60 inches on 1 percent of the area.
- Highways inside the boundary: US 287, Texas State Highway 19 and FM 2663. State permit office: TxDOT Lufkin District.
- Railroad track inside the boundary: Union Pacific, with 4 mapped street and rail crossings.
- Named streams inside the boundary: Sims Branch.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Who can I call for directional boring near US 287 in Latexo?
Latexo is a small incorporated city, so its city streets belong to the city itself. The Census Bureau Vintage 2024 estimate puts the population at 243 in Houston County. We install water, sewer, gas, electric conduit and fiber lines, including routes along Cottonwood Street or crossings near US 287 where those lines need to pass beneath pavement.
Our main office is in Yukon, Oklahoma, and Latexo work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our family business began in 1965, and we have done directional boring since 1982, bringing that experience to Latexo. For Latexo routes such as US 287, that experience covers work from 3/4 inch service lines to 48 inch casing and bores from 10 feet to 5,000 feet.

What does the soil survey show beneath Latexo?
The USDA soil survey maps Latex soil across 37 percent of Latexo, with Latex loam on 1 to 3 percent slopes as the largest mapped unit. Surface soils are mostly loam, loamy fine sand and fine sandy loam, but the picture changes lower down. At about 40 inches, clay is mapped across 60 percent of the area and sandy clay loam across 39 percent. The mapped average clay content at that depth is 37 percent. These are soil survey patterns, not test borings, so a route near Old Latexo Road still needs site specific planning.
| USDA soil survey, inside the Latexo city limits | What is mapped |
|---|---|
| Soil series mapped | Latex 37 percent, Rentzel 15 percent, Kirvin 12 percent, Alazan 12 percent and Lilbert 10 percent |
| Texture at the surface | loam 42 percent, loamy fine sand 25 percent and fine sandy loam 19 percent |
| Texture about 40 inches down | clay 60 percent and sandy clay loam 39 percent |
| Engineering class about 40 inches down | fat clay (CH) 60 percent, clayey sand (SC) 25 percent and lean clay (CL) 13 percent |
| Average clay content about 40 inches down | 37 percent |
| Bedrock mapped within 60 inches | 1 percent of the area (0 percent hard rock, 1 percent weathered rock) |
| Seasonal water table within 60 inches | 76 percent of the area |
| Flood prone soils | 0 percent of the area |
| High corrosion risk for uncoated steel | 90 percent of the area |
The soil survey maps a seasonal water table within 60 inches across 76 percent of Latexo and within 40 inches across 38 percent, so excavation pits near Cottonwood Street may need pumping. High steel corrosion risk is mapped across 90 percent of the area; the line owner should weigh casing and tracer wire materials, while HDPE is unaffected. Bedrock is mapped within 60 inches across 1 percent of the area, with typical depth at 38 inches. The Cook Mountain Formation, of Bartonian age, includes clay and marly sand, so the deeper route can differ from surface soil. In Latexo, flood prone soils are not mapped, so we plan boring around the site conditions confirmed for each underground route.
How do we bore Latexo clay without losing control of the line?
Latexo has clay below its loam and sandy surface soils. We plan the hole around the sticky lower layer, then track the drill head and record depth and pitch as it advances near roads such as Cottonwood Street.
- For clay mapped at about 40 inches in Latexo, we use thinner drilling fluid and polymer, ream in stages and aim to pull the pipe the day the hole opens.
- Because heavy clay is mapped across 60 percent of the area at that depth, we watch fluid returns near US 287 so pressure does not lift pavement.
- The seasonal water table mapped near Cottonwood Street can fill pits, so we keep pits small and pump water when site conditions call for it.
- Before drilling near County Road 2124, we expose each marked utility on the route with hydrovac and track the drill head from the surface.

Where might a Latexo line pass under Old Latexo Road?
US 287 has 5.4 mapped roadway miles inside Latexo, Texas State Highway 19 has 3.0 and FM 2663 has 1.4. Those routes create potential utility crossings and right of way work. Old Latexo Road is the longest named street in the city at 1.01 miles; Cottonwood Street has 0.54 miles and County Road 2124 has 0.2 miles. A bore can keep pavement and driveways intact, but the route and the road owner determine the plan.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| US 287 | US highway | 5.4 roadway miles inside | State highway office |
| Texas State Highway 19 | State highway | 3 roadway miles inside | State highway office |
| FM 2663 | State highway | 1.4 roadway miles inside | State highway office |
| Union Pacific | Railroad | 3.41 track miles inside | The railroad |
| Sims Branch | Stream | 0.41 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Sands Branch | Stream nearby | 0.1 miles outside | Checked for Corps of Engineers jurisdiction |
| Hurricane Bayou | Stream nearby | 0.9 miles outside | Checked for Corps of Engineers jurisdiction |
Union Pacific owns 3.41 track miles in Latexo on its Palestine Subdivision, and public records map 4 street and rail crossings. A bore beneath the track needs the railroad’s crossing agreement, which sets the crossing conditions. Sims Branch runs 0.41 channel miles inside the city, with 1 mapped street crossing of a named stream. Sands Branch is 0.1 miles from the city limits and Hurricane Bayou is 0.9 miles away, so nearby drainage may also shape a route.
Who approves a Latexo bore near Union Pacific and US 287?
US 287, Texas State Highway 19 and FM 2663 are state routes, so work in their right of way needs a TxDOT utility permit reviewed by the TxDOT Lufkin District. The utility that owns the line submits the application through TxDOT’s RULIS system; we prepare the bore plan and profile for that filing and work under the owner’s permit. For US 287 crossings in Latexo, we follow TxDOT rules calling for boring or tunneling beneath existing highway pavement. A Union Pacific crossing at one of Latexo’s mapped street and rail crossings needs an agreement from the railroad, and a Sims Branch crossing is checked for U.S. Army Corps of Engineers jurisdiction during planning.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Whose lines are already buried in Houston County near Latexo?
The water provider for a specific Latexo address has to be confirmed with the city, Houston County or the local water district before a bore is planned. Electric service reported in Houston County includes Entergy Texas, Oncor Electric Delivery Company and Houston County Electric Cooperative; those reports do not identify the provider at every address. We confirm the line owner before planning an electric conduit bore near US 287.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| Entergy Texas, Oncor Electric Delivery Company and Houston County Electric Cooperative | Electric utilities reporting service in Houston County | EIA Form 861 | Confirm the line owner by address |
The American Community Survey 2019 to 2023 five year estimates put Latexo’s median housing year at 1969; 30 percent of homes were built before 1960, 54 percent from 1960 to 1999 and 16 percent in 2000 or later. That mix can mean a bore under Cottonwood Street serves either a replacement route or a newer connection. We hydrovac pothole each marked utility on the bore path before drilling near it; for example, a marked line beneath Cottonwood Street must be exposed because paint shows position, not depth.

How far is Latexo from Crockett and our Yukon yard?
Latexo is in Houston County at an elevation of 390 feet and covers 0.98 square miles. Latexo ZIP codes 75835 and 75849 help us distinguish address details when reviewing a directional boring route. Crockett, the county seat and nearest larger city, is 5.3 miles south; Grapeland is 7.1 miles north, Kennard is 17.3 miles east, Elkhart is 17.7 miles north and Lovelady is 18.3 miles south. The Yukon, Oklahoma yard is 356 road miles away, a 7.3 hour drive, which affects mobilization for a bore near Sims Branch or US 287.
Places near Latexo
- Directional boring in Crockett: 5.3 miles south
- Directional boring in Grapeland: 7.1 miles north
- Directional boring in Kennard: 17.3 miles east
- Directional boring in Elkhart: 17.7 miles north
- Directional boring in Lovelady: 18.3 miles south
What kinds of bores come up near Latexo and Sims Branch?
- Highway crossing: A water or communication line beneath US 287 needs a bore plan that accounts for the state right of way and existing pavement.
- Street service: A water service near Cottonwood Street can pass beneath the street, with marked utilities exposed before the drill approaches them.
- Rail crossing: A conduit route beneath Union Pacific track needs the railroad’s agreement and crossing details before the bore is laid out.
- Creek crossing: A line beneath Sims Branch needs route planning that checks whether the crossing falls under U.S. Army Corps of Engineers jurisdiction.
- Fiber drop: A fiber route along Old Latexo Road can use a bore to avoid cutting the street surface.
- Electric conduit: A conduit bore near County Road 2124 starts with confirming the line owner and mapping the existing utilities.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What should I send for a Latexo bore near US 287?
A map pin matters near US 287 because the exact point can put a bore in highway right of way or on a city street. Send the address or pin, what is going in the ground, pipe or conduit size and footage. A sketch or plans help us see whether the route reaches Sims Branch or Union Pacific track.
The job scope sets the price through its ground, crossings and logistics. Clay at about 40 inches can call for staged reaming, while Latex loam at the surface does not describe every layer. Crossings of US 287, Union Pacific track or Sims Branch add planning and exposure work. Pavement, concrete, pits, excavator time and sand backfill also matter. Mobilization reflects the 356 road miles from Yukon, and high profile or emergency work can change the plan.
Questions people ask about boring in Latexo
Does Trinity Boring Solutions take jobs in Latexo and Houston County, and who staffs them?
Yes. We handle directional boring requests in Latexo and across Texas, including planning beneath highway pavement where TxDOT rules apply. Work is handled by our own crews or from satellite yards run by drilling contractors we have vetted. Customers deal with Trinity from the first call through the bore log, whether a crew is working near US 287 or another Houston County route.
What does a directional bore beneath Union Pacific track in Latexo require us to confirm before planning the crossing?
A bore under Union Pacific track needs an agreement from the railroad that owns it. The agreement sets crossing conditions such as casing, depth and flagging. Latexo has 3.41 track miles owned by Union Pacific, so the exact point on the route matters when the crossing is planned.
Can a line be bored under Sims Branch in Latexo?
A bore under Sims Branch can be considered after the route and site conditions are reviewed. The stream runs 0.41 channel miles inside Latexo, and planning checks whether the crossing falls under U.S. Army Corps of Engineers jurisdiction. The entry and exit pits also need suitable ground access.
Who owns electric lines in Latexo and Houston County, and who confirms conduit specs?
Entergy Texas, Oncor Electric Delivery Company and Houston County Electric Cooperative report electric service in Houston County, but that does not establish which one serves a specific Latexo address. The line owner must be confirmed before a conduit bore near US 287, and that owner can confirm the conduit requirements for its line.
Does the city or county control Latexo streets such as County Road 2124, and must we cut them?
Latexo is incorporated, so its city streets belong to the city; County Road 2124 is a named route in the city. A bore can pass beneath pavement without an open cut, subject to the route and applicable owner approvals. The exact location determines whether the work is on a city street or in state right of way.
How do Latexo home ages near Cottonwood Street affect replacement bores?
Latexo’s median housing year is 1969, according to the American Community Survey 2019 to 2023 five year estimates. Older homes and buried lines can make replacement work relevant near Cottonwood Street, while newer connections may need a service bore. We expose marked utilities along the path before drilling near them.
Can I reach Trinity after hours about an urgent Latexo bore near County Road 2124?
Yes. A person answers our phone 24 hours a day at (405) 409-7423, including for an urgent job near County Road 2124. We can discuss the location, the line and what needs to cross, then determine what response the work requires.
How much notice does Texas811 need for a Latexo bore along Old Latexo Road?
For a bore along Old Latexo Road, the locate request must go to Texas811 at least 48 hours before excavation starts, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before it. Texas811 describes this as at least two working days. If the start slips more than 14 days past the original notice, submit a new notice; have worn or moved marks refreshed before work resumes.
How do TxDOT rules for boring or tunneling beneath existing highway pavement affect the cost of a directional bore under US 287 in Latexo?
The price depends on the route and scope near US 287, not just its length. Factors include pipe or conduit size, clay and other ground conditions, utilities to expose, pavement, track or creek crossings, pits, excavator time and sand backfill. Mobilization also reflects the 356 road miles from Yukon, and high profile or emergency work can affect planning.
Where the Latexo facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Latexo
- U.S. Census Bureau, TIGER/Line 2024: Latexo boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Latexo
- U.S. Census Bureau, American Community Survey 2019 to 2023: Latexo housing units and year built
- Macrostrat geologic map compilation: map units under Latexo
- U.S. Department of Transportation, North American Rail Network: track owners in Houston County
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Houston County
- U.S. Geological Survey, Elevation Point Query Service: Latexo elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Latexo
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Latexo
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Latexo, Texas
Type the address of your job in Latexo. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Latexo
All counties: Texas county list.
