trinityboringsolutions.com

Muleshoe Texas Directional Boring: Midessa Soil, US 70 and BNSF Railway

Quick Answer: The Muleshoe Municipal Water System uses groundwater, while Southwestern Public Service and two electric cooperatives report service in Bailey County, so we identify line owners before a bore near BNSF Railway. We take directional boring, also called horizontal directional drilling (HDD), work in Muleshoe where routes may pass beneath US 70. The Yukon office is 354 road miles away, a distance that affects mobilization for work on American Boulevard. Midessa fine sandy loam covers much of the city, so crews plan the hole and fluid for soil that may cling to the reamer.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Muleshoe bores at a glance

  • County seat of Bailey County, Texas. Population 5,218 (Census Bureau 2024 estimate).
  • Road distance from our Yukon, Oklahoma main office: 354 miles, about 6.7 hours of driving.
  • Ground: Midessa soil is mapped on 31 percent of the area, with loam about 40 inches down.
  • Rock: no bedrock is mapped in the top 60 inches.
  • Highways inside the boundary: US 70, US 84 and Texas State Highway 214. State permit office: TxDOT Lubbock District.
  • Railroad track inside the boundary: BNSF Railway, with 7 mapped street and rail crossings.
  • Public water: Muleshoe Municipal Water System, groundwater wells.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who does directional boring in Muleshoe near BNSF Railway?

The Muleshoe Municipal Water System is locally government owned and uses groundwater; Southwestern Public Service and two electric cooperatives report service in Bailey County. We confirm the line owner before planning a conduit bore. The Census Bureau Vintage 2024 estimate puts Muleshoe at 5,218 people. We install water, sewer, gas, electric conduit and fiber along routes such as Avenue D, with the bore plan shaped around the utilities already there.

Our main office is in Yukon, Oklahoma, and Muleshoe work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Since 1982, four decades of directional boring have taught us to match the drilling plan to ground like Muleshoe’s Midessa fine sandy loam. Our family business began in 1965, and we stay involved from the first call through the bore log, whichever crew is on site.

Trinity Boring Solutions Vermeer D24x40 directional drill set up for a bore
Our Vermeer D24x40 directional drill set up for a bore. Photos on this page are from our jobs in Oklahoma and Texas.

What ground does Midessa soil mean for a bore in Muleshoe?

The USDA soil survey maps Midessa as the largest named soil series in Muleshoe, at 31 percent of the city. Midessa fine sandy loam with 0 to 1 percent slopes covers 25 percent. The survey maps surface loam across 51 percent and fine sandy loam across 38 percent. About 40 inches down, loam accounts for 45 percent and sandy clay loam for 44 percent; the mapped average clay content there is 31 percent. These are area patterns, not test borings. For a route under American Boulevard, the actual soil can change how we manage fluid and reaming.

USDA soil survey, inside the Muleshoe city limitsWhat is mapped
Soil series mappedMidessa 31 percent, Drake 23 percent, Portales 20 percent, Arch 8 percent and Lipan 6 percent
Texture at the surfaceloam 51 percent, fine sandy loam 38 percent and clay 8 percent
Texture about 40 inches downloam 45 percent, sandy clay loam 44 percent and clay 8 percent
Engineering class about 40 inches downlean clay (CL) 89 percent, fat clay (CH) 8 percent and silty sand (SM) 3 percent
Average clay content about 40 inches down31 percent
Bedrock mapped within 60 inchesNone mapped
Seasonal water table within 60 inches2 percent of the area
Flood prone soils0 percent of the area
High corrosion risk for uncoated steel8 percent of the area

Bedrock is not mapped in the top five feet of Muleshoe, but that does not rule out rock deeper down. The Blackwater Draw Formation is mapped here with sand, silt and locally clayey material; its age is Cenozoic. Seasonal water table conditions occur in 2 percent of mapped area, so pits may need pumping. Flood prone soils are not mapped. High steel corrosion risk covers 8 percent of the area, a concern for uncoated casing or tracer wire; the line owner chooses any coating.

How do crews bore Muleshoe’s loam?

Muleshoe’s mapped loam and fine sandy loam call for a plan that controls fluid and keeps the hole stable. We match each pass to the ground along the proposed route, whether it approaches Avenue D or US 70.

  1. We check the Midessa fine sandy loam along the route and adjust fluid and reaming so sticky cuttings do not build up on the tool.
  2. Where loam and sandy clay loam are mapped around Muleshoe, we stage the reaming and have pipe ready before opening the final hole.
  3. We hydrovac expose marked lines before drilling near the Muleshoe Municipal Water System or an electric line reported in Bailey County.
  4. At Avenue D or a route near US 70, we track the drill head from the surface and record depth and pitch as the bore advances.
Bore pit with a 6 inch PVC sleeve, traffic cones and blue water line flags at NE 24th Street in Oklahoma City
A bore pit with a 6 inch PVC sleeve, traffic cones and blue water line flags at NE 24th Street in Oklahoma City.

Where might a Muleshoe bore go under US 70?

US 70, US 84 and Texas State Highway 214 run within Muleshoe, so a route can involve state highway right of way as well as local streets. American Boulevard is the longest named street in the city at 2.32 miles; Avenue D runs 2.1 miles and Avenue B runs 2.06 miles. A bore beneath one of these streets can keep pavement intact, but its alignment and depth still depend on the line being installed and the utilities found along the path.

CrossingTypeMapped extentWho has a say
US 70US highway4.9 roadway miles insideState highway office
US 84US highway3.7 roadway miles insideState highway office
Texas State Highway 214State highway1.8 roadway miles insideState highway office
BNSF RailwayRailroad4.64 track miles insideThe railroad
Swipe the table sideways to see every column.

BNSF Railway owns 4.64 track miles within Muleshoe on the Slaton Subdivision. Public records map 7 street and rail crossings in the city, so a route near a track needs coordination with the railroad. No named streams or lakes are mapped within the city or nearby survey area. The map shows 0.6 miles of unnamed drainage, so a proposed route near that drainage needs its own crossing review.

Who approves a Muleshoe bore in Bailey County?

For a bore in US 70, US 84 or Texas State Highway 214 right of way, the cover depth sets the profile: electric and communication lines need 60 inches below the lowest crossed grade, while water needs 60 inches and pressurized sewer needs 60 inches at a crossing. A line running along highway right of way has different cover requirements, and the permit can set another depth. The utility owner files through TxDOT’s online RULIS system; TxDOT’s Lubbock District reviews it. Trinity prepares the bore plan and profile for the utility owner’s application. Muleshoe’s incorporated city streets belong to the city. A crossing of BNSF Railway needs an agreement with the railroad, which sets casing, depth and flagging.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Whose lines are buried in Muleshoe near Muleshoe Municipal Water System?

The local government owns the Muleshoe Municipal Water System, which draws from groundwater wells and serves 5,158 people through 2,012 connections. Electric providers reporting service in Bailey County are Southwestern Public Service, Bailey County Electric Cooperative Association and Lamb County Electric Cooperative. Those county reports do not identify the provider at every address, so we confirm the actual line owner before laying out an electric conduit bore near Avenue D.

Line ownerWhat it isSourceSize
Muleshoe Municipal Water SystemPublic water systemGroundwater wells2,012 connections, 5,158 people served
Southwestern Public Service, Bailey County Electric Cooperative Association and Lamb County Electric CooperativeElectric utilities reporting service in Bailey CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

The American Community Survey 2019 to 2023 five year estimates put Muleshoe’s median housing year at 1968. The survey reports 28 percent of homes built before 1960, 61 percent from 1960 to 1999 and 11 percent from 2000 onward. That mix can mean a project involves replacement of an older service or a new connection. Before drilling near the water system or an electric line, we use hydrovac potholing to expose marked utilities and check their depth.

Hydrovac truck and boring equipment staged beside an airport taxiway for utility daylighting in Oklahoma City
Our hydrovac truck and boring equipment beside an airport taxiway in Oklahoma City, set up to expose a utility crossing.

How far is Muleshoe from Sudan and our Yukon office?

Muleshoe is the Bailey County seat, at an elevation of 3,796 feet, with 3.43 square miles of land and ZIP code 79347. Sudan is 16.2 miles southeast; Earth is 18.2 miles east, and Farwell is 20.7 miles northwest. The Yukon, Oklahoma main office is 354 road miles away, a 6.7 hour drive. That distance is part of mobilization planning for a bore on US 70 or a service route toward Sudan. Muleshoe’s county seat location and compact land area make the address and route important starting points for a scope.

Places near Muleshoe

Which Muleshoe jobs call for a bore near Avenue D?

  • Highway crossing: A route under US 70 needs a bore profile set to the line type and the crossed grade, with right of way access planned.
  • Water service: A connection near Avenue D can tie into the Muleshoe Municipal Water System, whose wells supply local connections.
  • Fiber conduit: A route along American Boulevard can place conduit below pavement without cutting the street surface.
  • Rail crossing: A route beneath BNSF Railway needs railroad agreement details for casing, depth and flagging before the bore plan is set.
  • Drainage crossing: A proposed route near Muleshoe’s 0.6 miles of unnamed drainage needs its location checked during planning.
  • Street utility: Work on Avenue B can use potholing to expose marked utilities before a water, sewer or electric conduit bore proceeds.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

How do I get a Muleshoe quote for work near American Boulevard?

For a Muleshoe quote, send the address or map pin, what will go in the ground, pipe or conduit size and footage in one message. A sketch or plans help us follow the route around American Boulevard and show nearby crossings or access limits. Those details let us assess the proposed bore before choosing equipment and crew timing.

The job scope sets the price, with the ground, crossings and logistics each affecting the plan. Midessa fine sandy loam and the clay mapped below the surface can change fluid use and reaming. A crossing under US 70 or BNSF Railway adds coordination and may change casing or depth requirements. Pavement, exposed utilities, pits, excavator time and sand backfill also count. At 354 road miles from Yukon, mobilization is another part of planning, especially for high profile or emergency work.

Questions people ask about boring in Muleshoe

Does Trinity Boring Solutions take directional boring jobs in Bailey County and how are Muleshoe crews staffed?

Yes. We take directional boring work in Muleshoe and staff it with our own crews and vetted partner contractors working from satellite yards. Our Yukon office remains the main office, and Trinity stays responsible from the first call through the bore log. For a route near BNSF Railway, the crew plan follows the scope and crossing requirements.

Will a Muleshoe bore hit rock beneath Midessa soil?

The soil survey does not map bedrock in Muleshoe’s top five feet, though that does not rule out rock below that depth. The geologic map shows the Blackwater Draw Formation, with sand, silt and locally clayey material. A route near Midessa soil still needs planning for the actual conditions encountered as drilling proceeds.

Who approves a Muleshoe bore under US 70, and which TxDOT office reviews it?

For work in US 70 right of way, the utility owner applies through TxDOT’s online RULIS system, and the TxDOT Lubbock District reviews the application. The bore plan and profile set out the proposed route and cover. The required depth depends on the line type and crossing, with the permit able to specify a different depth.

What does a Muleshoe bore under BNSF Railway require?

A bore under BNSF Railway needs an agreement with the railroad that owns the track. The agreement sets casing, depth and flagging for the crossing. BNSF Railway has 4.64 track miles within Muleshoe, so the railroad’s requirements need to be part of the crossing plan before the bore is laid out.

Who runs Muleshoe’s public water system, and where does the water come from?

The local government owns the Muleshoe Municipal Water System, and its source is groundwater wells. The system serves 5,158 people through 2,012 service connections. For nearby drilling, we locate and expose marked lines before the drill approaches, rather than treating the map paint as proof of line depth.

Which electric company owns a conduit route in Bailey County near Muleshoe?

Southwestern Public Service, Bailey County Electric Cooperative Association and Lamb County Electric Cooperative report service in Bailey County. The reports do not establish which provider owns a line at a particular Muleshoe address. We confirm the line owner and conduit specifications before planning a route near US 84 or another street.

How does the 354 road mile trip from Yukon affect a Muleshoe bore?

Muleshoe is 354 road miles from Trinity’s Yukon, Oklahoma main office, with a listed drive of 6.7 hours. That distance enters mobilization planning, along with the work scope and access. An address near American Boulevard, the footage and the type of line help us plan the right crew and equipment.

How much Texas811 notice do I need for work near American Boulevard in Muleshoe?

A Texas811 request for an American Boulevard bore must be made at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no more than 14 days ahead. Texas811 describes that as at least two working days. If the start slips more than 14 days past the original notice, make a new request; worn or moved marks must be refreshed before work continues.

What affects the cost of a directional bore under US 70 in Muleshoe?

The route and scope determine the cost, not one item alone. For US 70, line size, bore length, required cover and highway coordination matter. Midessa soil conditions, other utilities to expose, pavement, pits, excavator time, backfill and drainage crossings can add work. Mobilization from Yukon is also part of the job plan.

Where the Muleshoe facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Muleshoe

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Muleshoe, Texas

Type the address of your job in Muleshoe. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Muleshoe

All counties: Texas county list.