trinityboringsolutions.com

Farwell Texas Directional Boring: Amarillo Fine Sandy Loam, US 84, BNSF Railway

Quick Answer: Trinity Boring Solutions handles directional boring, also called horizontal directional drilling (HDD), beneath Farwell streets and US 84 without opening the pavement. Farwell’s Avenue F and 9th Street are among its longest streets, and the Yukon office is 350 road miles away. Amarillo fine sandy loam covers 71 percent of mapped ground; sandy clay loam at about 40 inches can hold the bore but may grip pipe. We stage the reaming and plan the pull around that soil and nearby BNSF Railway tracks.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Farwell bores at a glance

  • County seat of Parmer County, Texas. Population 1,379 (Census Bureau 2024 estimate).
  • Road distance from our Yukon, Oklahoma main office: 350 miles, about 6.6 hours of driving.
  • Ground: Amarillo soil is mapped on 71 percent of the area, with sandy clay loam about 40 inches down.
  • Rock: no bedrock is mapped in the top 60 inches.
  • Highways inside the boundary: US 84, US 70, US 60, FM 292 and FM 348. State permit office: TxDOT Lubbock District.
  • Railroad track inside the boundary: BNSF Railway, with 3 mapped street and rail crossings.
  • Public water: City of Farwell, groundwater wells.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Does anyone do directional boring near US 84 in Farwell?

We take directional boring work in Farwell, Parmer County, including routes along US 84 and the city streets. The Census Bureau Vintage 2024 estimate puts the population at 1,379. Our crews install water, sewer, gas, electric conduit and fiber lines, with routes planned beneath streets such as Avenue F or near the BNSF Railway tracks.

Our main office is in Yukon, Oklahoma, and Farwell work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our longest bore is roughly 4,100 feet under the Arkansas River in Tulsa, proof of the reach we can bring to a Farwell route. For a shorter bore near Avenue A, we stay involved from the first call through the bore log; our family business started in 1965 and has done directional boring since 1982.

Horizontal directional drill rig set up on an open grass field with support trucks and a vacuum excavation truck
Our horizontal directional drill set up in an open field with the support trucks and the vacuum excavation truck. Photos on this page are from our jobs in Oklahoma and Texas.

What is Amarillo soil like to bore in Farwell?

Farwell is mapped mostly as Amarillo fine sandy loam, with Acuff loam making up the remainder. The USDA soil survey maps Amarillo soils across 71 percent of the city and Acuff across 29 percent. At about 40 inches below the surface, the mapped texture is sandy clay loam throughout, with an average clay content of 27 percent. These are mapped soil patterns, not test borings; the local mix suggests a bore should be planned for clay that can cling to tooling and pipe.

USDA soil survey, inside the Farwell city limitsWhat is mapped
Soil series mappedAmarillo 71 percent and Acuff 29 percent
Texture at the surfacefine sandy loam 71 percent and loam 29 percent
Texture about 40 inches downsandy clay loam 100 percent
Engineering class about 40 inches downlean clay (CL) 100 percent
Average clay content about 40 inches down27 percent
Bedrock mapped within 60 inchesNone mapped
Seasonal water table within 60 inches0 percent of the area
Flood prone soils0 percent of the area
High corrosion risk for uncoated steel0 percent of the area

Bedrock is not mapped in Farwell’s top five feet, though deeper rock is not ruled out. The USDA soil survey maps no seasonal water table, flood prone soils or high steel corrosion risk in the city, which reduces those mapped concerns but does not replace site checks. The geologic map shows the Blackwater Draw Formation, a Cenozoic unit of sand with silty and locally clayey material, as much as 25 feet thick. That mix can call for staged reaming and controlled drilling fluid near pavement.

How do we drill Farwell’s sandy clay loam?

We adapt the bore to Farwell’s mapped sandy clay loam, rather than treating every route as loose sand. Avenue F and nearby paved streets also shape where we place pits and control drilling fluid.

  1. In Farwell’s sandy clay loam, we use a controlled fluid mix and ream in stages so clay does not build up on the tooling or grip the pipe.
  2. On a route near Avenue F, we track the drill head from the surface and record its depth and pitch as each rod advances.
  3. Before drilling near marked lines along 9th Street, we hydrovac pothole each utility on the bore path; surface paint does not show its depth.
  4. For a crossing near BNSF Railway tracks, we plan entry and exit pits in the dirt so the bore can pass beneath the route without cutting pavement or trackside ground.
Trinity Boring Solutions water trailer supplying water for bentonite drilling fluid on a sleeve bore in northeast OKC
Our water trailer feeding the bentonite drilling fluid mix on a sleeve bore in northeast Oklahoma City.

What is in the way of a new line near Farwell’s Avenue F?

Farwell has US 84, US 70 and US 60 inside the city limits, along with FM 292 and FM 348. A bore crossing one of those highways needs its route and right of way considered before drilling. Avenue F is the city’s longest named street at 1.18 miles, followed by 9th Street at 1.16 miles and Avenue A at 0.98 miles. Those paved street routes can be crossed with a bore rather than an open cut, subject to the needed approvals.

CrossingTypeMapped extentWho has a say
US 84US highway1 roadway miles insideState highway office
US 70US highway1 roadway miles insideState highway office
US 60US highway0.8 roadway miles insideState highway office
FM 292State highway3.3 roadway miles insideState highway office
FM 348State highway0.6 roadway miles insideState highway office
BNSF RailwayRailroad3.58 track miles insideThe railroad
Swipe the table sideways to see every column.

BNSF Railway has 3.58 track miles inside Farwell, and public mapping shows 3 street and rail crossings in the city. A route near those tracks needs railroad coordination as well as utility checks. No streams or lakes and ponds are mapped in or within one mile of the city, so the mapped route does not include a local water crossing. The railroad remains a distinct crossing constraint even where there is no mapped creek.

Whose permission does a Farwell bore near BNSF Railway need?

A bore affecting US 84, US 70, US 60, FM 292 or FM 348 right of way needs a TxDOT utility permit, reviewed by the TxDOT Lubbock District. The utility that owns the line files through TxDOT’s RULIS system; we prepare the bore plan and profile and work under the owner’s permit. Beneath existing highway pavement, TxDOT rules call for boring or tunneling, and the permit sets the required depth and other conditions. At BNSF Railway tracks, the line owner needs a crossing agreement with the railroad; no mapped stream crossing is present in Farwell.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Whose lines are already buried in Farwell, Parmer County?

The City of Farwell public water system draws from groundwater wells and reports 678 service connections serving 1,360 people. Electric service reporting in Parmer County includes Southwestern Public Service, Bailey County Electric Cooperative Association, Deaf Smith Electric Cooperative and Farmers Electric Cooperative. Those records do not identify the provider at every Farwell address, so we confirm the electric line owner before planning a conduit bore near Avenue F.

Line ownerWhat it isSourceSize
City of FarwellPublic water systemGroundwater wells678 connections, 1,360 people served
Southwestern Public Service, Bailey County Electric Cooperative Association, Deaf Smith Electric Cooperative and Farmers Electric CooperativeElectric utilities reporting service in Parmer CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

The American Community Survey 2019 to 2023 five year estimates put Farwell’s median housing year at 1970; 28 percent of homes were built before 1960, while 9 percent date to 2000 or later. That age mix can mean a replacement bore near 9th Street has older buried lines to locate, while a new service has a different route to plan. We hydrovac expose marked utilities along the bore path because paint shows position, not depth.

Coiled black HDPE conduit fitted with a pulling grip staged on a lawn along a completed bore path
Coiled HDPE conduit fitted with a pulling grip, staged on a lawn along a finished bore path.

How far is Farwell from Muleshoe and our Yukon office?

Farwell is the Parmer County seat in Texas, on the Texas New Mexico border, at an elevation of 4,141 feet. The incorporated city covers 0.82 square miles and uses ZIP code 79325. Bovina is 12.5 miles northeast, Muleshoe is 20.7 miles southeast, and Friona is 25.1 miles northeast. Muleshoe is the nearest larger city. From our Yukon, Oklahoma yard, Farwell is 350 road miles and a 6.6 hour drive, which is part of planning crew mobilization for a bore near US 84.

Places near Farwell

What kinds of bores come up near Farwell’s Avenue A?

  • Highway crossing: A bore beneath US 84 follows TxDOT requirements for highway right of way, pavement and the road’s travel lanes.
  • Street crossing: A line beneath Avenue F can avoid an open cut across the city street, with the route checked for marked utilities first.
  • Water service: A connection near the City of Farwell groundwater system needs a route matched to the specific service and existing lines.
  • Rail crossing: A bore beneath BNSF Railway tracks needs the railroad’s crossing agreement and its conditions for the planned line.
  • Electric conduit: Near Avenue A, we confirm the line owner and conduit details before laying out the route and potholing marked utilities.
  • Fiber route: A fiber bore along 4th Street can pass beneath pavement, with pits set in the dirt on either side.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

What should I send for a Farwell bore near 4th Street?

A map pin matters near Farwell’s 4th Street because the exact route can change how a bore meets nearby pavement or utilities. Send the address or pin, what will go underground, the pipe or conduit size and the footage. A sketch or plans can show the route and help us identify crossings near US 84 or BNSF Railway tracks.

The route and scope set the price, not footage alone. Ground conditions matter: Farwell’s sandy clay loam may affect fluid and reaming choices. Crossings matter too, including BNSF Railway tracks, highway pavement, marked utilities and concrete. Logistics include pit work, excavator time, sand backfill and mobilization from Yukon, 350 road miles away. Pipe size, bore length and emergency or high profile requirements also change the work involved.

Questions people ask about boring in Farwell

Does Trinity take directional boring work in Farwell, Parmer County, and who staffs it?

Yes, Trinity Boring Solutions takes directional boring work in Farwell, Parmer County. We manage the job with our own crews and vetted partner contractor yards, while you work with Trinity from the first call through the bore log. That keeps planning connected for a route near US 84, whichever crew is on site.

Who owns electric lines in Farwell, Parmer County, and who confirms conduit specs?

The electric line owner depends on the Farwell address. Southwestern Public Service, Bailey County Electric Cooperative Association, Deaf Smith Electric Cooperative and Farmers Electric Cooperative report service in Parmer County. We confirm the specific owner before planning conduit near Avenue F, and the owner can verify the required conduit specifications.

Does the city control Avenue A in Farwell, and can we bore beneath it without cutting?

Farwell is incorporated, so its city streets, including Avenue A, belong to the city itself. Directional boring can pass beneath pavement without an open cut, subject to the route and required approvals. We check marked utilities and plan entry and exit pits off the paved portion of the street.

Could older buried lines near 9th Street affect a replacement bore in Farwell?

They could affect the route and potholing plan. The American Community Survey 2019 to 2023 estimates put Farwell’s median housing year at 1970, with 28 percent of homes built before 1960. That does not date each buried line, so we expose marked utilities near 9th Street before drilling close to them.

What is Amarillo soil like for a directional bore in Farwell?

Farwell is mapped mostly as Amarillo fine sandy loam, and the USDA soil survey maps sandy clay loam at about 40 inches below the surface. Clay can cling to tooling or grip pipe, so we may use staged reaming and manage drilling fluid carefully on a route near Avenue F.

Will a bore in Farwell hit rock below the mapped soil?

Bedrock is not mapped in Farwell’s top five feet, but that does not rule out deeper rock. The geologic map shows the Blackwater Draw Formation, a Cenozoic deposit of sand that can be locally clayey. We plan from the mapped information and adjust the drilling approach to conditions found on a route such as US 60.

How far is Farwell from Muleshoe, and does Yukon distance affect a bore?

Farwell is 20.7 miles northwest of Muleshoe and 350 road miles from our Yukon, Oklahoma yard. That distance can affect mobilization planning for work near BNSF Railway or Avenue F. We consider crew travel alongside bore length, pipe size, ground and crossing requirements.

How much notice does Texas811 need for a bore near Avenue F in Farwell?

For a bore near Avenue F, submit a Texas811 locate request at least two working days before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days ahead. The ticket has a 20 day life. If the start slips more than 14 days past the original notice, request a new ticket; refresh worn or moved marks before work continues.

What affects the cost of directional boring near US 84 in Farwell?

The job’s length and pipe size, Farwell’s sandy clay loam, marked utility crossings, pavement, pit work and mobilization all affect the price. A US 84 route or BNSF Railway crossing can add planning and approval needs. Distance from the Yukon yard also matters, as does emergency or high profile work.

Where the Farwell facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Farwell

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Farwell, Texas

Type the address of your job in Farwell. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Farwell

All counties: Texas county list.