trinityboringsolutions.com

Panhandle Texas Directional Boring: Pantex Soil, US 60 and BNSF Railway

Quick Answer: We do directional boring, also called horizontal directional drilling (HDD), for Panhandle routes where a bore may cross US 60. From our Yukon, Oklahoma main office, Panhandle is 238 road miles away, and our own crews and vetted partner crews handle work near 6th Street. Pantex silty clay loam can cling to the reamer, so we plan staged reaming and a prompt pipe pull. BNSF Railway has 3.56 track miles inside town.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Panhandle bores at a glance

  • County seat of Carson County, Texas. Population 2,315 (Census Bureau 2024 estimate).
  • Road distance from our Yukon, Oklahoma main office: 238 miles, about 4.5 hours of driving.
  • Ground: Pantex soil is mapped on 90 percent of the area, with silty clay loam about 40 inches down.
  • Rock: no bedrock is mapped in the top 60 inches.
  • Highways inside the boundary: US 60, FM 293 and Texas State Highway 207. State permit office: TxDOT Amarillo District.
  • Railroad track inside the boundary: BNSF Railway, with 3 mapped street and rail crossings.
  • Public water: Panhandle Municipal Water System, groundwater wells.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Which contractor handles directional boring near BNSF Railway in Panhandle?

At 238 road miles from our Yukon yard, Panhandle work is staffed by our own crews and partner crews from vetted contractor yards. The Census Bureau Vintage 2024 estimate puts this Carson County seat at 2,315 people. We can bore water, sewer, gas, electric conduit or fiber lines, including routes near US 60 or along 6th Street, depending on the project.

Our main office is in Yukon, Oklahoma, and Panhandle work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Trinity is a family business started in 1965, with directional boring work dating to 1982. Our record of no utility strikes in over 25 years matters around the Panhandle Municipal Water System and Southwestern Public Service lines reported in Carson County.

Ditch Witch JT922 compact directional drill beside the Trinity Boring Solutions truck at NE 24th Street in Oklahoma City
Our Ditch Witch JT922 compact directional drill beside the Trinity truck on a sleeve bore at NE 24th Street in Oklahoma City. Photos on this page are from our jobs in Oklahoma and Texas.

What does the Pantex soil survey show about Panhandle ground?

The USDA soil survey maps Pantex soil across 90 percent of Panhandle, mainly as Pantex silty clay loam on 0 to 1 percent slopes. Lazbuddie clay covers 6 percent of the mapped area. At about 40 inches below the surface, silty clay loam is mapped across 90 percent, and clay across 8 percent. The mapped soil at that depth is heavy clay throughout the town. That sticky ground can build up on a reamer, so the bore may need staged enlargement rather than one large pass.

USDA soil survey, inside the Panhandle city limitsWhat is mapped
Soil series mappedPantex 90 percent and Lazbuddie 6 percent
Texture at the surfacesilty clay loam 90 percent and clay 8 percent
Texture about 40 inches downsilty clay loam 90 percent and clay 8 percent
Engineering class about 40 inches downfat clay (CH) 98 percent
Average clay content about 40 inches down40 percent
Bedrock mapped within 60 inchesNone mapped
Seasonal water table within 60 inches8 percent of the area
Flood prone soils0 percent of the area
High corrosion risk for uncoated steel100 percent of the area

Bedrock is not mapped in the top five feet of Panhandle, though that does not rule out rock below. The geologic map shows the Cenozoic Blackwater Draw Formation, with sand, silt and locally clayey material, and Paleocene Cenozoic sedimentary rocks. A seasonal water table is mapped within 60 inches in 8 percent of the area, so pits there may need pumping. For Panhandle planning, we account for the fact that flood prone soils are not mapped. High steel corrosion risk covers the mapped area, so the line owner should consider protection for steel casing or tracer wire; HDPE avoids that soil corrosion concern.

How do we drill through Panhandle’s silty clay loam on this crossing?

Pantex silty clay loam is the main mapped ground in Panhandle. We choose the fluid and reaming plan to keep sticky clay moving without putting too much pressure under pavement on US 60.

  1. Because Pantex silty clay loam is mapped across most of Panhandle, we use a fluid plan that helps sticky cuttings travel instead of packing onto the reamer.
  2. The heavy clay mapped at about 40 inches can grip the pipe, so we enlarge the hole in stages and arrange the pull promptly.
  3. Near pavement on US 60 or 4th Street, we watch fluid returns and keep pressure controlled to reduce the chance of lifting the surface.
  4. Before drilling near a marked Panhandle Municipal Water System or Southwestern Public Service line, we hydrovac expose it; a walkover locator tracks depth and pitch.
Open bore pit in red Oklahoma dirt with white PVC conduit stub ups and an orange safety barrier
An open bore pit in red Oklahoma dirt with PVC conduit stubbed up and a safety barrier around it.

What does a bore have to cross in Panhandle near US 60?

US 60, FM 293 and Texas State Highway 207 run inside Panhandle, so a route can involve a state highway right of way. A bore under US 60 has to stay below the required cover and travel lanes. Among town streets, 4th Street runs 1.59 miles, 6th Street runs 1.58 miles and 5th Street runs 1.57 miles inside the limits. Those streets help define access and bore length, while pavement and driveways affect where pits can fit.

CrossingTypeMapped extentWho has a say
US 60US highway2.2 roadway miles insideState highway office
FM 293State highway4.3 roadway miles insideState highway office
Texas State Highway 207State highway1.3 roadway miles insideState highway office
BNSF RailwayRailroad3.56 track miles insideThe railroad
Panhandle Northern RailroadRailroad nearby0.6 miles outsideThe railroad
Panhandle Northern Railroad (line shown as out of service)Railroad nearby0.7 miles outsideThe railroad
Swipe the table sideways to see every column.

BNSF Railway owns 3.56 track miles inside Panhandle, and the mapped street and rail crossing count is 3. A crossing there needs an agreement from BNSF Railway, with casing, depth and flagging set by that agreement. No streams or named stream crossings are mapped inside town, and no lakes or ponds are mapped within one mile. The available crossing plan can therefore focus on roads and tracks rather than a mapped creek or lake.

Who permits a Panhandle bore on Carson County roads?

Because Panhandle is incorporated, we understand its city streets belong to the city when planning boring work. Work in the right of way of US 60, FM 293 or Texas State Highway 207 needs a TxDOT utility permit. The utility owner, not the drilling contractor, files through TxDOT’s RULIS system, and the TxDOT Amarillo District reviews the application. We prepare the bore plan and profile and work under the utility owner’s permit. For a crossing of BNSF Railway, the track owner must provide a crossing agreement; no mapped stream crossing in Panhandle adds a creek route to this review.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Which utilities serve Panhandle Municipal Water System routes?

The Panhandle Municipal Water System uses groundwater wells and serves 2,284 people through 1,334 service connections. If a bore near that system needs to cross marked lines, we hydrovac pothole them before drilling close by. Southwestern Public Service is the electric utility reporting service in Carson County, but the line owner is confirmed for the specific address before we plan an electric conduit bore near 4th Street.

Line ownerWhat it isSourceSize
Panhandle Municipal Water SystemPublic water systemGroundwater wells1,334 connections, 2,284 people served
Southwestern Public ServiceElectric utilities reporting service in Carson CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

The American Community Survey 2019 to 2023 five year estimates put Panhandle’s median housing year at 1958; 53 percent of homes were built before 1960, 40 percent from 1960 to 1999, and 7 percent in 2000 or later. That mix can mean replacement work near older homes as well as new services. Along 6th Street, paint shows a marked line’s position, not its depth, so we expose marked utilities with hydrovac before the drill approaches.

Yellow polyethylene gas pipe pulled through a directional bore beside a commercial building
Yellow polyethylene gas pipe pulled through a directional bore beside a commercial building.

Do you cover Panhandle and nearby Borger?

Panhandle is the county seat of Carson County, with 2.12 square miles of land at an elevation of 3,456 feet and ZIP code 79068. White Deer is 13.0 miles northeast, Washburn is 16.3 miles southwest, and Claude is 16.5 miles south. Borger, the nearest larger city, is 21.7 miles north. Our Yukon, Oklahoma yard is 238 road miles away, a drive of 4.5 hours, which can affect mobilization for a bore near US 60.

Places near Panhandle

What kinds of bores come up near Panhandle’s 6th Street?

  • Highway crossing: A bore beneath US 60 stays under the travel lanes, with the TxDOT cover requirement and right of way shaping the profile.
  • Water service: A route near the Panhandle Municipal Water System needs the marked groundwater lines exposed before the drill approaches.
  • Fiber conduit: A run along 6th Street can avoid open cuts across pavement, with potholes placed at marked utility conflicts.
  • Rail crossing: A route beneath BNSF Railway starts with the track owner’s agreement covering casing, depth and flagging.
  • Street replacement: A water or sewer bore near 4th Street can connect a service while leaving the paved street uncut.
  • Electric conduit: For a route near FM 293, we confirm the line owner before planning a bore for Southwestern Public Service infrastructure.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

What do you need to quote a bore near Panhandle’s 4th Street?

For a route near 4th Street, start with the address or a map pin. Tell us what will go underground, such as water service for the Panhandle Municipal Water System or fiber conduit. We also need the pipe or conduit size and footage. A sketch or plans help show nearby US 60 access, pavement and marked crossings.

A short route through Pantex silty clay loam with clear access is simpler to plan than a bore under US 60 or BNSF Railway. Price reflects length, pipe size, the ground, utilities to expose, pavement, pits and excavator time. Creek or drainage crossings can add planning, even though none are mapped inside Panhandle. Mobilization matters at 238 road miles from Yukon, and high profile or emergency work can change the job scope.

Questions people ask about boring in Panhandle

Does Trinity take directional boring work in Panhandle and Carson County, and who handles it?

Yes. We take directional boring work in Panhandle, with our own crews and vetted partner drilling contractors staffing projects from satellite yards. Our Yukon office is 238 road miles away, and you work with Trinity through the bore log regardless of which crew is on site. The Census Bureau estimates Panhandle’s population at 2,315.

What do older homes near Panhandle’s 6th Street mean for replacement bores?

The American Community Survey 2019 to 2023 estimates show a median housing year of 1958 in Panhandle, with 53 percent of homes built before 1960. Older service routes near 6th Street may call for replacement work, while newer construction can need a fresh service. On Panhandle jobs, we expose marked utilities before drilling near them to confirm their locations.

Does Panhandle Pantex soil corrode steel, and what pipe can we use?

The USDA soil survey maps high steel corrosion risk across Panhandle, including the Pantex soil area. The line owner decides whether steel casing or tracer wire needs a coating. HDPE is not affected by that mapped soil corrosion concern, so the right choice depends on the line design and owner requirements.

What ground does a bore pass through in Panhandle’s Pantex soil?

Pantex silty clay loam is mapped across 90 percent of Panhandle. At about 40 inches below the surface, the survey maps silty clay loam across 90 percent and clay across 8 percent. Those are mapped soil patterns, not test borings; sticky heavy clay can collect on a reamer and calls for staged enlargement.

Will a directional bore in Panhandle encounter rock along the planned bore path?

Bedrock is not mapped in the top five feet of Panhandle, but that does not rule out deeper rock. The geologic map shows the Cenozoic Blackwater Draw Formation and Paleocene Cenozoic sedimentary rocks. Site conditions along a route near US 60 still determine the drilling plan.

Who approves a bore under US 60 in Panhandle, and which office reviews it?

The utility owner applies for a TxDOT utility permit through RULIS for work in the US 60 right of way. The TxDOT Amarillo District reviews it. Required cover depends on the line type, and TxDOT can set a different depth in the permit. We provide the bore plan and profile for the utility owner’s filing.

What bore sizes and lengths can Trinity handle for a job near Panhandle’s 3rd Street?

We handle lines from 3/4 inch service lines to 48 inch casing, with bore lengths from 10 feet to 5,000 feet. A route near 3rd Street still needs a plan based on the pipe, ground and utility conflicts. Send the footage and size so we can assess the scope.

How much notice does Texas811 need for a Panhandle bore near 4th Street?

For work near 4th Street, Texas law requires a locate request at least 48 hours before excavation, not counting Saturdays, Sundays and legal holidays, and no earlier than 14 days before. For Panhandle work, if the start slips more than 14 days past the original notice, we submit a new request. When marks wear or move on a Panhandle job, we request refreshed markings through Texas811 before work continues.

What affects the cost of directional boring in Panhandle near US 60?

In Panhandle, we set boring prices according to the defined job scope. Length, pipe size, Pantex heavy clay, utilities to expose, pavement, pits and excavator time all matter. A US 60 crossing or BNSF Railway route brings crossing details into the plan, while mobilization from Yukon matters at 238 road miles. High profile or emergency work can also affect the scope.

Where the Panhandle facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Panhandle

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Panhandle, Texas

Type the address of your job in Panhandle. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Panhandle

All counties: Texas county list.