Sarita Texas Directional Boring: Palobia Loamy Fine Sand, US 77, Union Pacific Track
Quick Answer: US 77 and the Union Pacific track are key route conflicts; Trinity Boring Solutions takes directional boring, also called horizontal directional drilling (HDD), work in Sarita, Texas. The Yukon main office is 633 road miles away, so work near Turcotte Street needs mobilization in the plan. Palobia soil covers 67 percent of mapped ground, and its loose surface sand can cave behind the bit. Staged reaming and drilling fluid help hold a bore open beneath Garcia Street.
Sarita bores at a glance
- County seat of Kenedy County, Texas. Population 205 (2020 Census count).
- Road distance from our Yukon, Oklahoma main office: 633 miles, about 12.3 hours of driving.
- Ground: Palobia soil is mapped on 67 percent of the area, with sandy clay loam about 40 inches down.
- Rock: no bedrock is mapped in the top 60 inches.
- Highways inside the boundary: US 77. State permit office: TxDOT Pharr District.
- Railroad track inside the boundary: Union Pacific, with 1 mapped street and rail crossings.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Who handles directional boring near Union Pacific in Sarita?
US 77 and the Union Pacific track are places where buried service routes may need to pass under transportation corridors. Sarita is an unincorporated community in Kenedy County, with 205 residents in the 2020 Census count; the Census Bureau does not publish yearly estimates for unincorporated places. Water, sewer, gas, electric conduit and fiber can run beneath Garcia Street or connect properties along US 77.
Our main office is in Yukon, Oklahoma, and Sarita work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. A 3/4 inch service line near Garcia Street and a 48 inch casing for a route under US 77 show the range we handle. Our family business began in 1965, and we have provided directional boring since 1982 for Sarita projects.

How does Palobia soil affect a bore in Sarita?
The USDA soil survey maps Palobia across 67 percent of Sarita, with Palobia loamy fine sand the leading map unit. At the surface, loamy fine sand covers 81 percent of mapped area and fine sand another 15 percent. About 40 inches down, sandy clay loam is mapped under 95 percent of the area, with average clay content of 23 percent at that depth. We use Sarita’s mapped soil patterns for planning, not as test borings. The loose sand can cave behind the drill, while the deeper, firmer layer may hold the hole differently.
| USDA soil survey, inside the Sarita mapped community boundary | What is mapped |
|---|---|
| Soil series mapped | Palobia 67 percent, Padrones 7 percent, Quiteria 7 percent, Ramita 7 percent and Bordas 6 percent |
| Texture at the surface | loamy fine sand 81 percent, fine sand 15 percent and fine sandy loam 4 percent |
| Texture about 40 inches down | sandy clay loam 95 percent and fine sandy loam 4 percent |
| Engineering class about 40 inches down | clayey sand (SC) 67 percent, lean clay (CL) 28 percent and silty clayey sand (SC SM) 4 percent |
| Average clay content about 40 inches down | 23 percent |
| Bedrock mapped within 60 inches | None mapped |
| Seasonal water table within 60 inches | 14 percent of the area |
| Flood prone soils | 0 percent of the area |
| High corrosion risk for uncoated steel | 88 percent of the area |
Bedrock is not mapped within the top five feet in Sarita, though that does not rule out deeper rock. The mapped Eolian sheet sand unit is Holocene and describes fine sand and silt grading downward to sandy clay loam. A seasonal water table is mapped within 60 inches across 14 percent of the area, so pits in Sarita may need pumping. In Sarita, we account for the fact that flood prone soils are not mapped when planning boring. High steel corrosion risk covers 88 percent of mapped area, so the line owner should consider casing and tracer wire materials; HDPE avoids that steel corrosion issue.
How do crews bore sandy clay loam in Sarita?
Sarita has loose Palobia surface sand over sandy clay loam farther down. We plan the bore for changing ground, keep the drill head tracked, and have the pipe ready before the final ream.
- Palobia’s loose surface sand can cave behind the bit, so we use drilling fluid to support the bore and ream in stages before pulling pipe.
- At the sandy clay loam mapped about 40 inches down in Sarita, we watch the changing ground and track depth and pitch as each rod advances.
- Where a Sarita pit meets the seasonal water table mapped in 14 percent of the area, we keep pits small and pump water as needed.
- Before a bore near Garcia Street reaches a marked utility, we hydrovac expose it; the surface marks show position but not depth.

Where might a Sarita line pass under US 77?
US 77 runs for 1.9 mapped roadway miles inside Sarita, so a route crossing the highway needs a bore plan that accounts for the road corridor. Garcia Street is the longest named street at 0.48 miles, followed by Turcotte Street and Mallory Street at 0.44 miles each; La Parra Avenue measures 0.42 miles. A bore beneath one of these streets can leave pavement and driveways uncut, with pits placed in dirt beside the route where access allows.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| US 77 | US highway | 1.9 roadway miles inside | State highway office |
| Union Pacific | Railroad | 3.03 track miles inside | The railroad |
Union Pacific owns 3.03 track miles inside Sarita on its Brownsville Subdivision, and one street and rail crossing is mapped in the community. A bore under that track needs an agreement with the railroad owner, which sets crossing details such as casing, depth and flagging. No streams are mapped inside or within one mile of Sarita, and no lakes or ponds are mapped within one mile, so the records show no nearby channel crossing to plan around.
Who approves a Sarita bore in Kenedy County?
Sarita is an unincorporated community, so there is no city government to issue street permits; the mapped community boundary is in Kenedy County. For work in US 77 right of way, the utility owner, not the drilling contractor, files through TxDOT’s online RULIS system. TxDOT’s Pharr District reviews it, and we provide the bore plan and profile for the owner’s application. TxDOT rules require boring or tunneling beneath existing highway pavement. Electric and communication lines need 60 inches of cover at a crossing; water lines need 60 inches, and pressurized sewer lines need 60 inches. Union Pacific track work also requires the railroad’s agreement.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Which utilities may have lines in Sarita, Kenedy County?
EPA drinking water records do not tie a named water system to Sarita, so the provider for a specific Garcia Street address must be confirmed with Kenedy County or the local water district before a bore is planned. AEP Texas Central, Magic Valley Electric Cooperative and Nueces Electric Cooperative report electric service in Kenedy County. Those reports do not identify the provider at every address, so we confirm the line owner before planning an electric conduit bore near US 77.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| AEP Texas Central, Magic Valley Electric Cooperative and Nueces Electric Cooperative | Electric utilities reporting service in Kenedy County | EIA Form 861 | Confirm the line owner by address |
For Garcia Street, the American Community Survey 2019 to 2023 five year estimates put Sarita’s median housing year at 1955; 66 percent of homes were built before 1960, 17 percent from 1960 to 1999 and 17 percent in 2000 or later. That mix calls for checking whether a planned route is replacing an older service or serving newer construction. We hydrovac expose marked utilities along the bore path before drilling near them, since paint shows position, not depth.

Do you cover Sarita and Ricardo?
Sarita is the Kenedy County seat, sits at 36 feet elevation and covers 1.14 square miles inside its mapped community boundary. ZIP code 78385 serves the area. Riviera is 5.3 miles north, Ricardo is 13.9 miles north, and Kingsville, the nearest larger city, is 20.2 miles north. From our Yukon, Oklahoma main office, Sarita is 633 road miles away and a 12.3 hour drive. That distance is part of planning a bore near US 77, including crew and equipment mobilization.
Places near Sarita
- Directional boring in Riviera: 5.3 miles north
- Directional boring in Ricardo: 13.9 miles north
- Directional boring in Flowella: 16.5 miles west
- Directional boring in Airport Road Addition: 18.6 miles west
- Directional boring in Kingsville: 20.2 miles north
What boring work could involve Turcotte Street in Sarita?
- Highway crossing: A route under US 77 needs a bore plan for the highway corridor, with the utility owner handling the TxDOT permit.
- Rail crossing: A route beneath Union Pacific’s Brownsville Subdivision needs the track owner’s agreement and its crossing conditions.
- Water service: A connection near Garcia Street needs the address specific water provider confirmed before the bore is planned.
- Fiber route: A fiber conduit along Turcotte Street can be bored beneath the road surface, with marked utilities exposed first.
- Electric conduit: A proposed line near La Parra Avenue needs its electric line owner identified before conduit specifications are set.
- Street utility: A route beneath Mallory Street can use entry and exit pits beside the pavement instead of cutting across it.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What should I send to price a bore on Garcia Street in Sarita?
For a quote near Garcia Street or US 77, start with the address or map pin. For a Sarita bore, tell us what will go underground, plus the pipe or conduit size and footage. A sketch or plans help show the route and any track or road crossings. Those details let us plan the scope for the specific Sarita location.
A short service route near Garcia Street may be simpler to plan than a long crossing under US 77 or Union Pacific track. Length, pipe size, Palobia sand and deeper sandy clay loam all affect the work. So do marked utilities to expose, pavement, crossing agreements, pits, excavator time and sand backfill. Yukon’s 633 road miles affect our mobilization planning for directional boring work in Sarita. For Sarita projects, high profile or emergency work can add planning needs to the bore schedule.
Questions people ask about boring in Sarita
Does Trinity take boring work in Sarita, Kenedy County, and how is it staffed?
Yes. We take directional boring work in Sarita, and the job is handled by our crews or a vetted partner contractor working from a satellite yard. Our Yukon main office remains your point of contact from the first call through the bore log, whether the route is near Garcia Street or US 77.
What ground should I expect for a Sarita bore through Palobia soil?
The USDA soil survey maps Palobia across 67 percent of Sarita, with loamy fine sand common at the surface. About 40 inches down, sandy clay loam is mapped under 95 percent of the area. Loose sand can fall into the bore, so fluid support and staged reaming help keep the hole open.
Will our bore in Sarita hit rock?
Bedrock is not mapped in Sarita’s top five feet, but deeper rock is not ruled out. The geologic map shows Holocene Eolian sheet sand, described as fine sand and silt that can grade downward to sandy clay loam. A route near US 77 still needs depth and steering checks as the drill advances.
Who approves a bore beneath US 77 in Sarita?
The utility owner applies for work in US 77 right of way through TxDOT’s RULIS system, and the TxDOT Pharr District reviews it. We prepare the bore plan and profile for the owner’s application. The route also has to meet the highway cover and installation conditions set for the permit.
What does a Sarita bore beneath Union Pacific track require?
Union Pacific owns the track in Sarita, including 3.03 track miles on its Brownsville Subdivision. A crossing needs an agreement from the railroad that sets the terms for casing, depth and flagging. The mapped community has one street and rail crossing, so the specific route needs to be checked against the track.
Who owns electric lines in Sarita, Kenedy County, and who confirms conduit specs?
AEP Texas Central, Magic Valley Electric Cooperative and Nueces Electric Cooperative report service in Kenedy County, but that does not identify the provider at every Sarita address. We confirm the actual line owner for the route near La Parra Avenue before setting electric conduit specifications.
What bore sizes and lengths can you handle near Sarita’s La Parra Avenue?
We handle lines from 3/4 inch service lines through 48 inch casing, with bore lengths from 10 feet to 5,000 feet. For a route near La Parra Avenue, the pipe or conduit size, footage and ground conditions help determine the drilling setup.
How much notice does Texas811 need for a Sarita bore near Garcia Street?
For a bore near Garcia Street, request the Texas811 locate at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before the start. If the start slips more than 14 days past the notice, make a new request. In Sarita, we refresh worn or moved marks through Texas811 before work continues.
What affects the price of a directional bore under US 77 in Sarita?
The route length, pipe size, Palobia sand and deeper sandy clay loam all affect the scope, as do utilities to expose, pavement, pits and backfill. A US 77 crossing can add highway planning, and the 633 road miles from Yukon affect mobilization. We price from the specific job details, not one local rate.
Where the Sarita facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Sarita
- U.S. Census Bureau, TIGER/Line 2024: Sarita boundary, roads, rail lines and streams
- U.S. Census Bureau, 2020 Census: Sarita population count
- U.S. Census Bureau, American Community Survey 2019 to 2023: Sarita housing units and year built
- Macrostrat geologic map compilation: map units under Sarita
- U.S. Department of Transportation, North American Rail Network: track owners in Kenedy County
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Kenedy County
- U.S. Geological Survey, Elevation Point Query Service: Sarita elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Sarita
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Sarita
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Sarita, Texas
Type the address of your job in Sarita. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Sarita
All counties: Texas county list.
