trinityboringsolutions.com

Sonora Texas Directional Boring: Angelo Silty Clay, Interstate 10 and Dry Devils River

Quick Answer: Sonora is a small incorporated city whose streets belong to the city; we take directional boring and horizontal directional drilling (HDD) work in Texas for Dry Devils River crossings such as those on 2nd Street. The Yukon main office is 446 road miles from Sonora, and 2nd Street access is part of mobilization planning. Angelo silty clay covers 43% of mapped area, so sticky cuttings can load the reamer and grip pipe. Sonora’s 47.05 miles of public road centerlines include routes where a bore can avoid opening pavement.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Sonora bores at a glance

  • County seat of Sutton County, Texas. Population 2,420 (Census Bureau 2024 estimate).
  • Road distance from our Yukon, Oklahoma main office: 446 miles, about 8.9 hours of driving.
  • Ground: Angelo soil is mapped on 43 percent of the area, with silty clay about 40 inches down.
  • Rock: bedrock is mapped within 60 inches on 35 percent of the area.
  • Highways inside the boundary: Interstate 10, US 277, Loop 467 and RM 1691. State permit office: TxDOT San Angelo District.
  • Railroad track inside the boundary: none mapped.
  • Named streams inside the boundary: Dry Devils River.
  • Public water: City of Sonora, groundwater wells.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Which contractor handles directional boring near Dry Devils River in Sonora?

Sonora is an incorporated city, so streets such as Crockett Avenue belong to the city, and Trinity takes directional boring work in Sutton County. We consider Sonora’s Census Bureau Vintage 2024 population estimate of 2,420 when planning underground work across the incorporated city. Along 2nd Street and Dry Devils River crossings, we install water, sewer, gas, electric conduit and fiber by bore to avoid opening the surface.

Our main office is in Yukon, Oklahoma, and Sonora work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. For a 3/4 inch service line near Access Road or a 48 inch casing route under Interstate 10, our work ranges from 10 feet to 5,000 feet. This family business began in 1965, and we have done directional boring since 1982, including planning around Dry Devils River crossings.

Horizontal directional drill rig set up on an open grass field with support trucks and a vacuum excavation truck
Our horizontal directional drill set up in an open field with the support trucks and the vacuum excavation truck. Photos on this page are from our jobs in Oklahoma and Texas.

What does the soil survey show about Angelo soil in Sonora?

The USDA soil survey maps Angelo soil across 43% of Sonora, with silty clay mapped as the surface texture across 44%. Angelo silty clay has 0 to 2 percent slopes, while Tarrant soil accounts for 34% and Rioconcho for 22%. At about 40 inches below the surface, the survey maps silty clay across 43% and silty clay loam across 22%; bedrock is mapped there across 35%. Average clay content at that depth is 41%. These are mapped patterns, not test borings, so the actual route still needs evaluation.

USDA soil survey, inside the Sonora city limitsWhat is mapped
Soil series mappedAngelo 43 percent, Tarrant 34 percent and Rioconcho 22 percent
Texture at the surfacesilty clay 44 percent, silty clay loam 22 percent and very flaggy clay 20 percent
Texture about 40 inches downsilty clay 43 percent, bedrock 35 percent and silty clay loam 22 percent
Engineering class about 40 inches downlean clay (CL) 43 percent and fat clay (CH) 22 percent
Average clay content about 40 inches down41 percent
Bedrock mapped within 60 inches35 percent of the area (35 percent hard rock, 0 percent weathered rock)
Seasonal water table within 60 inches0 percent of the area
Flood prone soils22 percent of the area
High corrosion risk for uncoated steel100 percent of the area

The USDA soil survey maps bedrock within 60 inches across 35% of Sonora, all of it recorded as hard bedrock; weathered bedrock is not mapped in that depth range. Seasonal water table is not mapped within 60 inches, but flood prone soils cover 22%, a concern near Dry Devils River. High steel corrosion risk is mapped across 100%, so the line owner should weigh casing and tracer wire materials; HDPE has no steel corrosion concern. The geologic map includes Pleistocene Cemented Alluvial Gravelly Sand and Early Cretaceous sedimentary rock, which can mean changing conditions along a bore.

How do we bore Sonora’s silty clay along 2nd Street?

In Sonora’s silty clay, we control the fluid and ream in stages so sticky cuttings do not build up on the tool or hold the pipe near 2nd Street.

  1. Angelo silty clay can stick to the reamer, so we use a thinner fluid mix, add polymer and open the hole in stages before pulling pipe.
  2. Because heavy clay is mapped in Sonora, we watch fluid returns near 2nd Street and keep pressure down to limit the chance of lifting pavement.
  3. Near the 35% of Sonora where bedrock is mapped within 60 inches, we account for hard rock and check depth and pitch as the ground changes.
  4. For a Dry Devils River route, we plan depth below the channel and use a walkover locator to track the drill head while logging depth and pitch.
Trinity Boring Solutions crew in hard hats at the exit pit with rock tooling on a sandstone bore in Guthrie, OK
Our crew at the exit pit with rock tooling on a sandstone bore in Guthrie, Oklahoma.

What is in the way of a new line in Sonora near 2nd Street?

Interstate 10, US 277, Loop 467 and RM 1691 run within Sonora, so a route may need to cross or follow state highway right of way. The longest named streets include 2nd Street at 2.62 miles, Crockett Avenue at 2.13 miles and 3rd Street at 1.28 miles. Access Road and North Svc Road each measure 1.05 miles. A bore can keep pavement and driveways intact, but the road owner and route determine the plan.

CrossingTypeMapped extentWho has a say
Interstate 10Interstate1.6 roadway miles insideState highway office
US 277US highway2.3 roadway miles insideState highway office
Loop 467State highway3.6 roadway miles insideState highway office
RM 1691State highway0.2 roadway miles insideState highway office
Dry Devils RiverStream2.52 channel miles insideChecked for Corps of Engineers jurisdiction
Site No 8Lake or pond31 acres, nearbyChecked for Corps of Engineers jurisdiction
Scs 13Lake or pond6 acres, nearbyChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

Public records map no railroad within Sonora or within one mile outside its limits, and no street and rail crossings are mapped. Dry Devils River runs 2.52 channel miles through the city, with 17 mapped street crossings of named streams. Site No 8 and Scs 13 are lakes or ponds within one mile, both outside city limits. A creek route needs careful depth planning, and the crossing is checked for U.S. Army Corps of Engineers jurisdiction during planning.

Who has to sign off on a Sonora bore near Interstate 10?

The line owner, not our drilling crew, submits a utility permit application in TxDOT’s RULIS system for work in Interstate 10, US 277, Loop 467 or RM 1691 right of way; the TxDOT San Angelo District reviews it. We prepare the bore plan and profile for the owner’s application and work under the permit issued to that owner. TxDOT cover rules call for 60 inches at highway crossings for electric, communication and water lines, and 60 inches for pressurized sewer. Existing highway pavement is bored or tunneled, with the bore extending beneath all travel lanes on rural highways. Sonora owns its city streets, including 2nd Street. Dry Devils River crossings are checked for federal jurisdiction during planning.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Which utilities may be along Sonora routes in Sutton County?

The City of Sonora public water system uses groundwater wells and reports 1,476 service connections serving 2,766 people. That makes the water system a key line owner to identify before a bore near 2nd Street or Dry Devils River. AEP Texas North, Pedernales Electric Cooperative and Southwest Texas Electric Cooperative report electric service in Sutton County. Those reports do not identify the provider at every address, so we confirm the line owner before planning a conduit bore.

Line ownerWhat it isSourceSize
City of SonoraPublic water systemGroundwater wells1,476 connections, 2,766 people served
AEP Texas North, Pedernales Electric Cooperative and Southwest Texas Electric CooperativeElectric utilities reporting service in Sutton CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

The American Community Survey 2019 to 2023 five year estimates put Sonora’s median housing year at 1977; 29% of homes were built before 1960, and 10% in 2000 or later. A bore along Crockett Avenue may serve a replacement line for older housing or a new connection. Before drilling near marked lines, we hydrovac pothole them to establish depth, including near City of Sonora water connections and lines whose electric owner is confirmed for the address.

Large HDPE conduit reels staged on a Rotate A Reel trailer for a fiber and utility installation in Oklahoma
HDPE conduit reels on a reel trailer for a fiber and utility installation in Oklahoma.

Where is Sonora in relation to Eldorado and the Yukon yard?

Sonora is the county seat of Sutton County, at an elevation of 2,122 feet, with 2.23 square miles of land and ZIP code 76950. Eldorado is 20.3 miles north, Ozona is 34.9 miles west and Christoval is 44.2 miles north. Interstate 10 and US 277 provide local highway routes. The Yukon, Oklahoma main office is 446 road miles away, a drive of 8.9 hours, so distance is part of mobilization planning for work near Access Road or Dry Devils River.

Places near Sonora

Which jobs call for a bore near Dry Devils River in Sonora?

  • Highway crossing: A new line beneath Interstate 10 is bored or tunneled, with the route extending below all rural highway travel lanes.
  • Water service: A service near 2nd Street can connect to the City of Sonora groundwater system without opening the street surface.
  • Fiber conduit: A route along Crockett Avenue can carry conduit while hydrovac potholing checks marked utilities before drilling near them.
  • Creek crossing: A bore at Dry Devils River is planned below the channel, with the route checked for federal jurisdiction.
  • Street connection: Work near 3rd Street can use pits in the dirt on each side to leave pavement and driveways uncut.
  • Access route: A service near Access Road can be planned around mapped Angelo silty clay and any marked line crossings.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

How do I get a quote for directional boring near Access Road in Sonora?

For a quote near Access Road or 2nd Street, send the address or map pin, what will go underground, the pipe or conduit size and the footage. A sketch or plans help show whether the route approaches Interstate 10, a driveway or Dry Devils River. Those details let us assess the route before choosing a bore plan.

Sonora pricing starts with the ground: Angelo silty clay can load the reamer and grip pipe, while mapped bedrock may change the tooling and pace. Next are the number of utilities to expose and any Interstate 10 or Dry Devils River crossing. Pavement, pits, excavator time and sand backfill also affect the work. A route 446 road miles from Yukon adds mobilization, and high profile or emergency work can require a different plan.

Questions people ask about boring in Sonora

Does Trinity Boring Solutions take jobs in Sonora, Sutton County, and who staffs them?

Yes. Trinity takes directional boring work in Sonora, and the job is staffed with our own crews or through satellite yards run by partner drilling contractors we have vetted. We coordinate with Trinity through the bore log for crossings on Interstate 10, regardless of which crew is on site. For a route near Dry Devils River, the specific crew is coordinated for the project.

How old are Sonora’s buried lines near Crockett Avenue, and does that affect replacement bores?

The American Community Survey 2019 to 2023 five year estimates put the median housing year at 1977, with 29% of homes built before 1960. That does not establish the age of a buried line, but a replacement bore near Crockett Avenue can avoid cutting pavement while connecting to existing service. We expose marked utilities near US 277 before drilling in their vicinity.

Are groundwater or flood prone soils a problem for bore pits near Dry Devils River in Sonora?

The soil survey does not map a seasonal water table within 60 inches, but it maps flood prone soils across 22% of Sonora, including areas relevant to Dry Devils River planning. We account for the channel when setting bore depth and pit locations. The City of Sonora water system uses groundwater wells, but that fact does not establish groundwater conditions at a jobsite.

Does Angelo soil in Sonora corrode steel, and what pipe can be used?

The USDA soil survey maps high steel corrosion risk across 100% of Sonora, including Angelo soil areas. The line owner should consider the materials for steel casing and tracer wire. In Rioconcho soil, HDPE is not subject to that soil corrosion concern, so we can consider it for buried runs. The owner selects materials for a route near 2nd Street based on the line and project requirements.

What ground will a bore go through in Sonora’s Angelo soil?

The USDA soil survey maps Angelo across 43% of Sonora. At about 40 inches below the surface, it maps silty clay across 43% and silty clay loam across 22%, with bedrock in 35% of the area. Angelo, Tarrant, and Rioconcho show mapped soil patterns, not test borings, so we verify conditions before boring. Near Crockett Avenue, actual conditions along the proposed route still need to guide the bore plan.

Is rock present in Sonora, and how much has bedrock mapped within five feet?

The USDA soil survey maps bedrock within 60 inches across 35% of Sonora, and all of that mapped bedrock is recorded as hard. Weathered bedrock is not mapped within that depth. This is a survey pattern, not a test at a particular address, so a route near Interstate 10 may still need adjustment if the drill meets rock.

Can I reach Trinity after hours about an urgent bore near 3rd Street in Sonora?

Yes. A person answers the Trinity phone 24 hours a day at (405) 409-7423. For an urgent job near 3rd Street or Dry Devils River, call with the location and what line is involved so we can discuss the work and response needed.

How much Texas811 notice is needed for a Sonora bore near 2nd Street, and what if marks move?

For a bore near 2nd Street, submit the locate request through Texas811 at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before work. For a TxDOT San Angelo District request, if the start slips more than 14 days past the original notice, we submit a new request. On Crockett Avenue, we have worn or moved marks refreshed through Texas811 before work continues.

What affects the cost of a directional bore near Interstate 10 in Sonora?

The route and scope determine the price. Angelo silty clay and any hard bedrock affect drilling time; the number of marked utilities, Interstate 10 crossings, pavement and Dry Devils River work affect planning and equipment. Pits, excavator time, sand backfill, emergency timing and mobilization from Yukon also matter. A map pin, size and footage help define the route.

Where the Sonora facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Sonora

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Sonora, Texas

Type the address of your job in Sonora. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Sonora

All counties: Texas county list.