Directional Boring Contractors in Burnet County, TX
Trinity Boring Solutions is a directional boring contractor serving Burnet County, Texas, installing water, sewer, gas, electric and fiber lines without an open trench in Marble Falls, Burnet, Granite Shoals, Bertram, Meadowlakes and Cottonwood Shores. Burnet, the county seat, is about 389 road miles south of the Trinity main office in Yukon, Oklahoma. Bores here most often pass under US 281 and US 183 and the Colorado River. Call (405) 409-7423 any time.
Free Bore Planner
Plan Your Bore in Burnet County, Texas
Type the address of your job in Burnet County. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
What Should You Know Before Boring in Burnet County?
Burnet County covers 995 square miles, has about 55,722 residents and sits in the TxDOT Austin District.
| County seat | Burnet |
|---|---|
| Population | 55,722 (2024 Census estimate), up 13.4% since 2020 |
| Land area | 995 square miles |
| Largest cities and towns | Marble Falls (9,413), Burnet (6,869), Granite Shoals (5,417), Bertram (2,020) and Meadowlakes (1,843) |
| TxDOT district | TxDOT Austin District |
| 811 center | Texas811 (call 811), two working days of notice |
| Electric utilities | Oncor Electric Delivery Company and Pedernales Electric Cooperative |
| Interstate and US highways | US 281 and US 183 |
| State Highways | 29 and 71 |
| State loops and spurs | Spur 191 |
| Rivers | Colorado River, North Fork San Gabriel River, Russell Fork San Gabriel River, South Fork San Gabriel River and Lampasas River |
| Creeks and other streams | Hamilton Creek, South Rocky Creek, Mill Creek, Sycamore Creek, North Rocky Creek, Backbone Creek, Deer Creek and Dry Creek |
| Lakes | Lake Buchanan, Lake Lyndon B Johnson, Lake Travis and Lake Marble Fls |
| Railroads | short line railroads, about 33 main line miles |
| Average precipitation | 32.1 inches a year (1991 to 2020) |
| New housing units permitted | 736 in 2025 |
| Road distance from Trinity main office | About 389 miles from Yukon, Oklahoma to Burnet |
| Trinity insurance | General liability of $1,000,000 per occurrence and $4,000,000 aggregate, plus $5,000,000 excess liability |
Sources: Census Bureau (2024 population, 2025 building permits, TIGER/Line roads and water), EIA Form 861 (2025), NOAA 1991 to 2020 precipitation, federal rail network map, TxDOT districts, OpenStreetMap routing. Checked November 2026.
What Does a Bore Have to Cross in Burnet County?
A bore in Burnet County most often has to cross a highway such as US 281, US 183 or State Highway 29, a stream such as the Colorado River, the North Fork San Gabriel River or Hamilton Creek and short line track. State Highways 29 and 71 also run through the county, along with Spur 191. The Census map names 26 larger streams in Burnet County, led by the Colorado River, Hamilton Creek, the North Fork San Gabriel River, the Russell Fork San Gabriel River, South Rocky Creek and Mill Creek. The rest are Sycamore Creek, South Fork San Gabriel River, North Rocky Creek, Lampasas River, Backbone Creek, Deer Creek, Dry Creek, Mesquite Creek, South Mesquite Creek, Clear Creek, South Fork Morgan Creek, North Fork Morgan Creek, Bear Creek, Flatrock Creek, Double Horn Creek, Cow Creek, North Mesquite Creek, Oatmeal Creek, Dry Branch and Hairston Creek. Lake Buchanan, Lake Lyndon B Johnson, Lake Travis and Lake Marble Fls are the main mapped lakes. The federal rail map shows about 33 miles of main line track in Burnet County, owned by short line operators.

What Is the Ground Like for Directional Boring in Burnet County?
Rock is the main thing to plan for in Burnet County: the federal soil survey records bedrock within five feet of the surface on about 84 percent of the county, a mix of hard and soft, weathered rock. Depth to rock in Burnet County is confirmed by potholing before the rig is set, and rock tooling is loaded when the path cannot avoid it. May is the wettest month in Burnet County at 4.3 inches on average and January the driest at 1.9. Burnet County averages 32.1 inches of precipitation a year, so rain delays are occasional.
- Most common soils: Brackett (20%), Purves (11%) and Eckrant (8%).
- Surface texture: most often clay loam (20%) or clay (14%).
- Bedrock within 5 feet: about 84% of the county. It is a mix of hard rock and softer weathered rock. Rock outcrop is mapped on about 5%.
- Clay rich layer (35% clay or more) in the top 5 feet: about 42% of the county.
- Sandy layer (70% sand or more) in the top 5 feet: about 6% of the county.
- Gravelly, cobbly or stony surface soil: about 30% of the county.
Source: USDA Natural Resources Conservation Service, Soil Survey Geographic Database, Blanco and Burnet Counties, Texas (survey area TX601, version 23, September 8, 2026), through Web Soil Survey. Percentages are shares of mapped county area.
Who Permits a Bore in Burnet County?
The TxDOT Austin District permits bores under state highways in Burnet County, the Burnet County Commissioners Court handles county roads, and Marble Falls, Burnet and Granite Shoals each handle their own streets.
- State highways. US 281, US 183, the other numbered state routes and the farm to market roads in Burnet County are on the state system. The utility owner files a TxDOT utility permit in RULIS.
- Texas811 locates. Texas811 needs at least two working days of notice before digging (Texas811 FAQ; Texas Utilities Code, Section 251.151).
- Railroads. A bore under short line track in Burnet County needs a crossing agreement from the railroad that owns it, which sets the casing, depth and flagging.
- Water crossings. A bore under the Colorado River, the North Fork San Gabriel River, Hamilton Creek or Lake Buchanan is checked for U.S. Army Corps of Engineers jurisdiction while the path is planned.
Statewide rules are on the Directional Boring Texas page, and Trinity supplies the bore plan and profile for the permit package.
Which Electric Utilities Serve Burnet County?
Oncor Electric Delivery Company and Pedernales Electric Cooperative serve Burnet County, according to 2025 filings with the U.S. Energy Information Administration. Oncor Electric Delivery Company is an investor owned utility; Pedernales Electric Cooperative is a member owned cooperative. Knowing which one holds the territory at the address is the first step on a conduit bore in Burnet County. More on electric line boring for electric cooperatives.
How Much New Construction Is There in Burnet County?
Burnet County permitted 736 new housing units in 2025, 734 of them single family homes, according to the Census Bureau Building Permits Survey. The population of Burnet County went from 49,123 in 2020 to 55,722 in 2024, a gain of 13.4 percent. That pace of building in Burnet County puts new water, gas, electric and fiber services under finished pavement.
Which Cities and Towns in Burnet County Does Trinity Serve?
Trinity takes directional boring work in all 9 incorporated places in Burnet County and at sites outside city limits, and Marble Falls is the largest with about 9,413 residents.
| City or town | 2024 population |
|---|---|
| Marble Falls | 9,413 |
| Burnet | 6,869 |
| Granite Shoals | 5,417 |
| Bertram | 2,020 |
| Meadowlakes | 1,843 |
| Cottonwood Shores | 1,668 |
| Horseshoe Bay | 1,019 |
| Highland Haven | 410 |
| Double Horn | 282 |
Source: U.S. Census Bureau 2024 estimates, counting only the part of each city inside Burnet County.
Burnet County borders Bell County, Blanco County, Lampasas County, Llano County, San Saba County, Travis County and Williamson County; every county is on the Directional Boring in All 254 Texas Counties page. The neighboring county seats are Belton (Bell), Johnson City (Blanco), Lampasas (Lampasas), Llano (Llano), San Saba (San Saba), Austin (Travis) and Georgetown (Williamson).
Which Directional Boring Services Are Available in Burnet County?
Every Trinity service is available in Burnet County: horizontal directional drilling from 3/4 inch service lines to 48 inch casing, auger boring, hydrovac potholing, trenching and 24 hour emergency response, all listed under Underground Utility and Boring Services.
- Road, highway, railroad, creek and river bore crossings, including US 281, US 183 and the Colorado River
- Bores under short line track, built to the railroad boring requirements of the owner
- Drinkable water line boring and sewer force mains in Marble Falls or Burnet and on rural water systems
- Underground conduit in Oncor Electric Delivery Company and Pedernales Electric Cooperative territory, see electric line boring
- Fiber optic boring for ISPs and broadband builders along US 281
- Municipal boring services for cities such as Marble Falls, Burnet and Granite Shoals
The free Bore Planner sizes a Burnet County job before you call.
Burnet County Directional Boring FAQs: What Do Customers Ask?
Does Trinity Boring Solutions work in Burnet, Texas?
Yes. Trinity Boring Solutions takes work in Marble Falls, Burnet, Granite Shoals, Bertram, Meadowlakes and Cottonwood Shores and the rural parts of Burnet County. Trinity works in Texas with its own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted.
Who approves a bore under US 281 in Burnet County?
The TxDOT Austin District. The utility owner files the permit in the TxDOT RULIS system. County roads go through the Burnet County Commissioners Court and city streets through the city.
Is there rock in Burnet County?
Yes, in places. The federal soil survey records bedrock within five feet of the surface on about 84 percent of Burnet County, a mix of hard and soft, weathered rock. Potholing confirms it on the actual bore path.
Can a line be bored under the Colorado River in Burnet County?
Yes. A drill is steered below the bed of the Colorado River from a pit on each bank and the pipe is pulled back through, so the channel is not opened. Federal jurisdiction over the crossing is checked first.
Which railroads have track in Burnet County?
Short line operators, with about 33 miles of main line track on the federal rail map. Each requires its own crossing agreement before a bore goes under the rails.
Is Trinity insured for work in Burnet County?
Yes. Trinity Boring Solutions carries general liability of $1,000,000 per occurrence and $4,000,000 aggregate, plus $5,000,000 excess liability. Ask for a certificate with the quote.
How much does directional boring cost in Burnet County?
Trinity works from a general range based on length and pipe size. Depth, the crossings and the ground set the number, and rock is a factor on many Burnet County jobs.
How Do You Get a Bore Quote in Burnet County?
Call (405) 409-7423 any time or send the address in Burnet County, the utility, the length and what it crosses. Trinity has bored since 1965 and is family owned.