Directional Boring Contractors in Culberson County, TX

Trinity Boring Solutions is a directional boring contractor serving Culberson County, Texas, installing water, sewer, gas, electric and fiber lines without an open trench in Van Horn. Van Horn, the county seat, is about 613 road miles southwest of the Trinity main office in Yukon, Oklahoma. Bores here most often pass under Interstate 10 and US 62, the Delaware River and Union Pacific track. Call (405) 409-7423 any time.

Free Bore Planner

Plan Your Bore in Culberson County, Texas

Type the address of your job in Culberson County. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

What Should You Know Before Boring in Culberson County?

Culberson County covers 3,812 square miles, has about 2,254 residents and sits in the TxDOT El Paso District.

County seatVan Horn
Population2,254 (2024 Census estimate), up 3.1% since 2020
Land area3,812 square miles
Largest cities and townsVan Horn (2,011)
TxDOT districtTxDOT El Paso District
811 centerTexas811 (call 811), two working days of notice
Electric utilitiesEl Paso Electric, Oncor Electric Delivery Company and Rio Grande Electric Cooperative
Interstate and US highwaysInterstate 10, US 62, US 180 and US 90
State Highways54
RiversDelaware River
Creeks and other streamsSulphur Creek, Cottonwood Creek, Nickel Creek, Wild Horse Creek, Hackberry Creek, Salt Creek, Eagle Flat Draw and Wild Horse Draw
RailroadsUnion Pacific, about 66 main line miles
Average precipitation11.4 inches a year (1991 to 2020)
New housing units permitted23 in 2025
Road distance from Trinity main officeAbout 613 miles from Yukon, Oklahoma to Van Horn
Trinity insuranceGeneral liability of $1,000,000 per occurrence and $4,000,000 aggregate, plus $5,000,000 excess liability

Sources: Census Bureau (2024 population, 2025 building permits, TIGER/Line roads and water), EIA Form 861 (2025), NOAA 1991 to 2020 precipitation, federal rail network map, TxDOT districts, OpenStreetMap routing. Checked November 2026.

What Does a Bore Have to Cross in Culberson County?

A bore in Culberson County most often has to cross a highway such as Interstate 10, US 62 or US 180, a stream such as the Delaware River, Sulphur Creek or Cottonwood Creek and Union Pacific track. State Highways 54 also run through the county. The Census map names 12 larger streams in Culberson County, led by the Delaware River, Sulphur Creek, Cottonwood Creek, Nickel Creek, Wild Horse Creek and Hackberry Creek. The rest are Salt Creek, Eagle Flat Draw, Wild Horse Draw, Guadalupe Arroyo, Carrizo Creek and Sand Creek. The federal rail map shows about 66 miles of main line track in Culberson County, owned by Union Pacific.

Trinity Boring Solutions horizontal directional drill rig set up on an open grass field with support trucks and a vacuum excavation truck
A Trinity Boring Solutions drill rig, support trucks and vacuum excavation truck on a jobsite.

What Is the Ground Like for Directional Boring in Culberson County?

Rock is the main thing to plan for in Culberson County: the federal soil survey records bedrock within five feet of the surface on about 42 percent of the county, most of it hard rock. In Culberson County the bore path is set around rock where that is possible, and rock tooling goes on the truck where it is not. July is the wettest month in Culberson County at 2.0 inches on average and February the driest at 0.4. Culberson County averages 11.4 inches of precipitation a year, so the ground is usually dry at bore depth.

  • Most common soils: Bissett (12%), Beach (8%) and Culberspeth (7%).
  • Surface texture: most often very gravelly loam (18%) or loam (17%).
  • Bedrock within 5 feet: about 42% of the county. Most of it is hard rock. Rock outcrop is mapped on about 6%.
  • Caliche within 5 feet: about 8% of the county.
  • Clay rich layer (35% clay or more) in the top 5 feet: about 4% of the county.
  • Sandy layer (70% sand or more) in the top 5 feet: about 5% of the county.
  • Gravelly, cobbly or stony surface soil: about 37% of the county.

Source: USDA Natural Resources Conservation Service, Soil Survey Geographic Database, Culberson County, Main Part, Texas (survey area TX626, version 21, September 9, 2026) and Guadalupe Mountains National Park, Texas (survey area TX625, version 18, September 9, 2026), through Web Soil Survey. Percentages are shares of mapped county area.

Who Permits a Bore in Culberson County?

The TxDOT El Paso District permits bores under state highways in Culberson County, the Culberson County Commissioners Court handles county roads, and Van Horn handles its own streets.

  • State highways. Interstate 10, US 62, US 180, US 90, the other numbered state routes and the farm to market roads in Culberson County are on the state system. The utility owner files a TxDOT utility permit in RULIS.
  • Texas811 locates. Texas811 needs at least two working days of notice before digging (Texas811 FAQ; Texas Utilities Code, Section 251.151).
  • Railroads. A bore under Union Pacific track in Culberson County needs a crossing agreement from the railroad that owns it, which sets the casing, depth and flagging.
  • Water crossings. A bore under the Delaware River or Sulphur Creek is checked for U.S. Army Corps of Engineers jurisdiction while the path is planned.

Statewide rules are on the Directional Boring Texas page, and Trinity supplies the bore plan and profile for the permit package.

Which Electric Utilities Serve Culberson County?

El Paso Electric, Oncor Electric Delivery Company and Rio Grande Electric Cooperative serve Culberson County, according to 2025 filings with the U.S. Energy Information Administration. El Paso Electric and Oncor Electric Delivery Company are investor owned utilities; Rio Grande Electric Cooperative is a member owned cooperative. Knowing which one holds the territory at the address is the first step on a conduit bore in Culberson County. More on electric line boring for electric cooperatives.

How Much New Construction Is There in Culberson County?

Culberson County permitted 23 new housing units in 2025, 5 of them single family homes, according to the Census Bureau Building Permits Survey. The population of Culberson County went from 2,187 in 2020 to 2,254 in 2024, a gain of 3.1 percent. Bore work in Culberson County is a mix of new services and replacement of older lines.

Which Cities and Towns in Culberson County Does Trinity Serve?

Trinity takes directional boring work in Van Horn, the only incorporated place in Culberson County with about 2,011 residents, and at sites outside the city limits.

City or town2024 population
Van Horn2,011

Source: U.S. Census Bureau 2024 estimates, counting only the part of each city inside Culberson County.

Culberson County borders Hudspeth County, Jeff Davis County, Reeves County, Eddy County, New Mexico and Otero County, New Mexico; every county is on the Directional Boring in All 254 Texas Counties page. The neighboring county seats are Sierra Blanca (Hudspeth), Fort Davis (Jeff Davis) and Pecos (Reeves).

Which Directional Boring Services Are Available in Culberson County?

Every Trinity service is available in Culberson County: horizontal directional drilling from 3/4 inch service lines to 48 inch casing, auger boring, hydrovac potholing, trenching and 24 hour emergency response, all listed under Underground Utility and Boring Services.

The free Bore Planner sizes a Culberson County job before you call.

Culberson County Directional Boring FAQs: What Do Customers Ask?

Does Trinity Boring Solutions work in Van Horn, Texas?

Yes. Trinity Boring Solutions takes work in Van Horn and the rural parts of Culberson County. Trinity works in Texas with its own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted.

Who approves a bore under Interstate 10 in Culberson County?

The TxDOT El Paso District. The utility owner files the permit in the TxDOT RULIS system. County roads go through the Culberson County Commissioners Court and city streets through the city.

Is there rock in Culberson County?

Yes, in places. The federal soil survey records bedrock within five feet of the surface on about 42 percent of Culberson County, most of it hard rock. Caliche shows up within five feet on about 8 percent. Potholing confirms it on the actual bore path.

Can a line be bored under the Delaware River in Culberson County?

Yes. A drill is steered below the bed of the Delaware River from a pit on each bank and the pipe is pulled back through, so the channel is not opened. Federal jurisdiction over the crossing is checked first.

Which railroads have track in Culberson County?

Union Pacific, with about 66 miles of main line track on the federal rail map. Each requires its own crossing agreement before a bore goes under the rails.

Is Trinity insured for work in Culberson County?

Yes. Trinity Boring Solutions carries general liability of $1,000,000 per occurrence and $4,000,000 aggregate, plus $5,000,000 excess liability. Ask for a certificate with the quote.

How much does directional boring cost in Culberson County?

Footage and pipe size set a general range. Depth, the crossings and the ground set the number, and rock is a factor on many Culberson County jobs.

How Do You Get a Bore Quote in Culberson County?

Call (405) 409-7423 any time or send the address in Culberson County, the utility, the length and what it crosses. Trinity has bored since 1965 and is family owned.