Robert Lee Texas Directional Boring: Sagerton Clay Loam, Texas State Highway 158, Mountain Creek
Quick Answer: We take directional boring, also called horizontal directional drilling (HDD), for work under Texas State Highway 158 in Robert Lee, Texas. Robert Lee is 359 road miles from our Yukon, Oklahoma main office, and our own crews or vetted partner crews handle work near Austin Street. The USDA soil survey maps Sagerton clay loam across 27 percent of the city, so sticky cuttings call for managed drilling fluid and staged reaming. Mountain Creek and the Colorado River make route and depth checks part of a crossing plan.
Robert Lee bores at a glance
- County seat of Coke County, Texas. Population 1,063 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 359 miles, about 7.1 hours of driving.
- Ground: Miles soil is mapped on 32 percent of the area, with clay loam about 40 inches down.
- Rock: bedrock is mapped within 60 inches on 13 percent of the area.
- Highways inside the boundary: Texas State Highway 158, FM 229 and FM 1904. State permit office: TxDOT San Angelo District.
- Railroad track inside the boundary: none mapped.
- Named streams inside the boundary: Mountain Creek and Colorado River.
- Public water: City of Robert Lee, surface water bought from another system.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Who can I call for directional boring near Texas State Highway 158 in Robert Lee?
Robert Lee is 359 road miles from our Yukon, Oklahoma main office; our own crews and vetted partner crews staff jobs along Texas State Highway 158. The Census Bureau Vintage 2024 estimate puts the city at 1,063 people. Near Austin Street or FM 229, we can install water, sewer, gas, electric conduit or fiber, with the line and route set by the project.
Our main office is in Yukon, Oklahoma, and Robert Lee work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our family business started in 1965, and we have done directional boring since 1982. Our longest bore was roughly 4,100 feet of 48 inch pipe under the Arkansas River in Tulsa; a proposed bore near FM 229 gets its own plan for its line and route.

What does the USDA soil survey show for Robert Lee and Miles soil?
The USDA soil survey maps Miles soil across 32 percent of Robert Lee and Sagerton soil across 29 percent. Sagerton clay loam, on 0 to 1 percent slopes, covers 27 percent of the mapped area. About 40 inches down, clay loam is mapped under 42 percent and sandy clay loam under 32 percent. Average clay content at that depth is 29 percent. These are mapped soil patterns, not test borings. Clay loam can cling to a reamer, so the actual bore route needs to guide fluid and reaming choices.
| USDA soil survey, inside the Robert Lee city limits | What is mapped |
|---|---|
| Soil series mapped | Miles 32 percent, Sagerton 29 percent, Cho 18 percent, Weymouth 13 percent and Colorado 7 percent |
| Texture at the surface | loam 37 percent, fine sandy loam 32 percent and clay loam 29 percent |
| Texture about 40 inches down | clay loam 42 percent, sandy clay loam 32 percent and cemented material 18 percent |
| Engineering class about 40 inches down | lean clay (CL) 49 percent and clayey sand (SC) 32 percent |
| Average clay content about 40 inches down | 29 percent |
| Bedrock mapped within 60 inches | 13 percent of the area (1 percent hard rock, 13 percent weathered rock) |
| Seasonal water table within 60 inches | 0 percent of the area |
| Flood prone soils | 7 percent of the area |
| High corrosion risk for uncoated steel | 0 percent of the area |
The USDA soil survey maps bedrock within five feet in 13 percent of Robert Lee; weathered bedrock is mapped in 13 percent, while hard bedrock is mapped in 1 percent. That means some routes may slow at rock, but the map does not settle conditions at a specific address. Seasonal water tables are not mapped within 60 inches, and flood prone soils cover 7 percent. High steel corrosion risk is not mapped. Quaternary terrace deposits include sand, silt, clay and gravel; Permian Guadalupian sedimentary rock is also mapped, so a route may need a different tool where rock is encountered.
How do we drill Robert Lee routes with clay loam?
Sagerton clay loam is common in Robert Lee, but a soil map is not a reading from the bore path. We use the route and field conditions to set the drilling approach.
- Sagerton clay loam can cling to the reamer, so we manage fluid and open the hole in stages before pulling pipe on a planned route.
- Miles fine sandy loam is mapped in Robert Lee; where loose sand is present, staged reaming and ready pipe help limit collapse behind the drill.
- With weathered bedrock mapped in parts of the city, we check depth and pitch as the head advances and adjust if the route meets rock.
- Near Mountain Creek, we plan the bore below the channel and check the crossing for federal waterway jurisdiction before setting the route.

Which roads, tracks or creeks could a Robert Lee bore cross near Mountain Creek?
Texas State Highway 158 has 0.8 mapped roadway miles inside Robert Lee; FM 229 has 0.7 and FM 1904 has 0.2. A line under a state road calls for a bore plan that accounts for its right of way. Among named city streets, 10 Street runs 1.66 miles, Austin Street 1.29 miles and Chadbourne Street 1.16 miles. Those routes help locate a job, but the specific crossing and existing lines determine the bore path.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| Texas State Highway 158 | State highway | 0.8 roadway miles inside | State highway office |
| FM 229 | State highway | 0.7 roadway miles inside | State highway office |
| FM 1904 | State highway | 0.2 roadway miles inside | State highway office |
| Mountain Creek | Stream | 0.9 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Colorado River | Stream | 0.49 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Messbox Creek | Stream nearby | 0.4 miles outside | Checked for Corps of Engineers jurisdiction |
| Antelope Creek | Stream nearby | 0.6 miles outside | Checked for Corps of Engineers jurisdiction |
| Mountain Creek Reservoir | Lake or pond | 23 acres, nearby | Checked for Corps of Engineers jurisdiction |
| Old City Lake | Lake or pond | 7 acres, nearby | Checked for Corps of Engineers jurisdiction |
No railroad is mapped inside Robert Lee or within one mile outside the limits, and no street and rail crossings are mapped in the city. Mountain Creek runs 0.9 channel miles inside the limits, and the Colorado River runs 0.49. One mapped street crossing of a named stream is present. Mountain Creek Reservoir and Old City Lake are both within one mile but outside the city limits. A water crossing needs its own route and depth review.
Do I need a permit for a Robert Lee bore in Coke County?
For work in the right of way of Texas State Highway 158, FM 229 or FM 1904, the utility owner applies for a TxDOT utility permit through RULIS; the TxDOT San Angelo District reviews it. We prepare the bore plan and profile and work under the permit issued to the utility owner. TxDOT cover requirements depend on the line: electric and communication crossings need 60 inches, while a line along the right of way needs 48 inches. Water and pressurized sewer have their own crossing depths. Robert Lee city streets belong to the city. A Mountain Creek crossing is checked for federal waterway jurisdiction during planning.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Which utilities serve Robert Lee, including City of Robert Lee water?
The City of Robert Lee public water system uses purchased surface water and serves 1,025 people through 846 service connections. That can make nearby water infrastructure relevant when planning a new service or replacement bore. Utilities reporting electric service in Coke County are AEP Texas North, Oncor Electric Delivery Company, Concho Valley Electric Cooperative and Taylor Electric Cooperative. We confirm the line owner for a conduit route near Austin Street rather than assume one provider serves every address.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| City of Robert Lee | Public water system | Surface water bought from another system | 846 connections, 1,025 people served |
| AEP Texas North, Oncor Electric Delivery Company, Concho Valley Electric Cooperative and Taylor Electric Cooperative | Electric utilities reporting service in Coke County | EIA Form 861 | Confirm the line owner by address |
The American Community Survey 2019 to 2023 five year estimates put Robert Lee’s median housing year at 1973; 29 percent of homes were built before 1960, 69 percent from 1960 to 1999 and 2 percent in 2000 or later. A replacement bore near 10 Street may need to work around older buried lines as well as newer services. We hydrovac pothole marked utilities on the route before drilling near them, since surface marks do not show depth.

Do you cover Robert Lee, Bronte and nearby rural sites?
Robert Lee is the Coke County seat, at an elevation of 1,830 feet and with 1.14 square miles of land area. Its ZIP code is 76945. Bronte is 11.2 miles east; Blackwell is 16.3 miles northeast. San Angelo, the nearest larger city, is 31.5 miles south. From our Yukon, Oklahoma main office, the road trip is 359 miles and about 7.1 hours. We take work in Robert Lee, Bronte and rural areas, with the route and mobilization considered for each job.
Places near Robert Lee
- Directional boring in Bronte: 11.2 miles east
- Directional boring in Blackwell: 16.3 miles northeast
- Directional boring in Carlsbad: 21.7 miles southwest
- Directional boring in Grape Creek: 22 miles south
- Directional boring in Wingate: 24.6 miles northeast
- Directional boring in San Angelo: 31.5 miles south
Which jobs call for a bore near 10 Street in Robert Lee?
- Highway crossing: A bore under Texas State Highway 158 needs a route and cover plan for the state right of way.
- Water service: A connection near the City of Robert Lee system needs potholing to find existing lines before the drill approaches.
- Fiber conduit: A route along Austin Street can avoid cutting pavement when the line path and utility marks allow a bore.
- Creek crossing: A proposed line below Mountain Creek needs channel depth planning and a jurisdiction check during preparation.
- Street replacement: A bore near 10 Street can route around existing services while limiting cuts through paved access.
- Rural service: A line toward Bronte can be scoped from its map pin, footage, pipe size and ground conditions.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What should I send for a Robert Lee quote near Texas State Highway 158?
For a bore near Texas State Highway 158, send the address or map pin, what will go in the ground, the pipe or conduit size and the footage; a sketch or plans help. A map showing the route toward Austin Street or FM 229 can clarify access and nearby crossings. That gives us a starting scope to review.
A straightforward service route near Austin Street may be simpler to plan than a bore under Texas State Highway 158 or across Mountain Creek. The answer depends on footage, pipe or conduit size, Miles or Sagerton ground, utilities to expose, pavement, creek or drainage crossings, pits and equipment time. A route farther from Yukon also changes mobilization. The map pin and plans help show which of those details apply.
Questions people ask about boring in Robert Lee
Does Trinity Boring Solutions take directional boring jobs in Coke County near Robert Lee?
Yes. We take directional boring work in Robert Lee and across Texas. The job is staffed by our own crews or by crews at satellite yards run by drilling partners we have vetted. For a route near Texas State Highway 158, we stay involved from the first call through the bore log.
How old are buried lines near Austin Street in Robert Lee, and can a replacement line be bored?
A replacement bore is possible if the route and clearances work. The American Community Survey 2019 to 2023 five year estimates give Robert Lee a median housing year of 1973, with 29 percent of homes built before 1960. Near Austin Street, we expose marked utilities with hydrovac before drilling close to them.
What ground might a bore cross in Robert Lee, including Miles soil?
The mapped ground varies by route. The USDA soil survey shows Miles soil across 32 percent of Robert Lee, and about 40 inches down it maps clay loam under 42 percent and sandy clay loam under 32 percent. Clay may stick to tooling, while sandy material may need support to keep the hole open.
Could a Robert Lee bore run into bedrock?
It could, depending on the route. Bedrock is mapped within five feet across 13 percent of Robert Lee, with weathered bedrock mapped over 13 percent and hard bedrock over 1 percent. Those survey patterns do not establish what is at a specific address, so the bore plan allows for field conditions.
Who approves a bore under Texas State Highway 158 in Robert Lee?
TxDOT reviews the utility permit through its San Angelo District. The utility owner files the application in TxDOT’s RULIS system, while we prepare the bore plan and profile and work under the issued permit. A crossing under Texas State Highway 158 must follow the cover and installation conditions in that permit.
Can a line be bored under Mountain Creek in Robert Lee?
A bore can be planned for a Mountain Creek crossing, subject to the route, ground and required reviews. The creek runs 0.9 channel miles inside Robert Lee. During planning, the crossing is checked for U.S. Army Corps of Engineers jurisdiction, and the bore path is set to pass beneath the channel.
Does Trinity cover Bronte and rural areas around Robert Lee?
Yes. We take work in Bronte and rural sites around Robert Lee as well as in town. Bronte is 11.2 miles east of Robert Lee. The address or map pin, route length and ground conditions help us plan the crew and mobilization for a job outside the city limits.
How much Texas811 notice do I need for a bore near 10 Street in Robert Lee?
Request a locate at least two working days before starting a bore near 10 Street, and no earlier than 14 days before the planned start. If work slips more than 14 days past the original notice, make a new request. Have worn or moved marks refreshed through Texas811 before work continues.
What affects the cost of directional boring near Texas State Highway 158 in Robert Lee?
The route and scope set the cost. Near Texas State Highway 158, right of way and pavement affect planning; Miles and Sagerton soils can change drilling time. Footage, pipe size, utilities to expose, creek crossings, pits, equipment time and mobilization from Yukon also matter. A Mountain Creek crossing can add route planning.
Where the Robert Lee facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Robert Lee
- U.S. Census Bureau, TIGER/Line 2024: Robert Lee boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Robert Lee
- U.S. Census Bureau, American Community Survey 2019 to 2023: Robert Lee housing units and year built
- Macrostrat geologic map compilation: map units under Robert Lee
- U.S. EPA Safe Drinking Water Information System: public water systems serving Robert Lee
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Coke County
- U.S. Geological Survey, Elevation Point Query Service: Robert Lee elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Robert Lee
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Robert Lee
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Robert Lee, Texas
Type the address of your job in Robert Lee. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Robert Lee
All counties: Texas county list.
