Santa Anna Texas Directional Boring: Nuvalde Clay, US 67 and BNSF Railway
Quick Answer: Nuvalde clay loam and clay shape Santa Anna bores; sticky cuttings can cling to the reamer. We take directional boring, also called horizontal directional drilling (HDD), work under US 67 and other local crossings. Santa Anna is 356 road miles from our Yukon, Oklahoma main office, so distance can affect mobilization for a bore near BNSF Railway. The mapped clay can grip pipe, so we plan the reaming and pullback around it.
Santa Anna bores at a glance
- Incorporated city in Coleman County, Texas. Population 1,052 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 356 miles, about 7 hours of driving.
- Ground: Nuvalde soil is mapped on 20 percent of the area, with bedrock about 40 inches down.
- Rock: bedrock is mapped within 60 inches on 60 percent of the area.
- Highways inside the boundary: US 67, US 84, US 283 and FM 1176. State permit office: TxDOT Brownwood District.
- Railroad track inside the boundary: BNSF Railway, with 7 mapped street and rail crossings.
- Named streams inside the boundary: Horse Creek.
- Public water: City of Santa Anna, surface water bought from another system.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Who can I call for directional boring on Wallis Avenue in Santa Anna?
Nuvalde clay loam and clay can cling to a reamer, so we plan the bore for Santa Anna’s ground. The Census Bureau Vintage 2024 estimate puts the town’s population at 1,052. We install water, sewer, gas, electric conduit and fiber, with routes that can serve homes or connect lines along Wallis Avenue, Avenue B and US 84.
Our main office is in Yukon, Oklahoma, and Santa Anna work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our family business began in 1965 and has drilled directionally since 1982. We have had no utility strike in over 25 years, a record that matters around the City of Santa Anna water lines and electric service reported in Coleman County.

What is Santa Anna ground like around Nuvalde soil?
The USDA soil survey maps Nuvalde clay loam, cool, 1 to 3 percent slopes across 20 percent of Santa Anna. Leeray clay covers 19 percent, Valera clay 15 percent and Lindy clay loam 13 percent. At about 40 inches, the mapped texture is bedrock across 45 percent of the town, silty clay loam across 20 percent and silty clay across 19 percent. The survey maps heavy clay across 49 percent at that depth. For Santa Anna work, we use mapped soil patterns as planning context, not as test borings.
| USDA soil survey, inside the Santa Anna city limits | What is mapped |
|---|---|
| Soil series mapped | Nuvalde 20 percent, Leeray 19 percent, Valera 15 percent, Lindy 13 percent and Kavett 10 percent |
| Texture at the surface | clay loam 36 percent, clay 34 percent and silty clay 10 percent |
| Texture about 40 inches down | bedrock 45 percent, silty clay loam 20 percent and silty clay 19 percent |
| Engineering class about 40 inches down | lean clay (CL) 30 percent and fat clay (CH) 19 percent |
| Average clay content about 40 inches down | 39 percent |
| Bedrock mapped within 60 inches | 60 percent of the area (50 percent hard rock, 10 percent weathered rock) |
| Seasonal water table within 60 inches | 0 percent of the area |
| Flood prone soils | 0 percent of the area |
| High corrosion risk for uncoated steel | 67 percent of the area |
The USDA soil survey puts typical bedrock depth at 31 inches and maps hard bedrock within 60 inches across 50 percent of Santa Anna. Rock close to the surface can slow the cut and make the soil to rock transition harder to steer. In Santa Anna, we account for seasonal water table and flood prone soils that are not mapped. High steel corrosion risk is mapped across 67 percent, so the line owner should consider steel casing and tracer wire materials. The geology map includes Santa Anna Branch Shale and Sedwick and Moran Formations, undivided, of Artinskian age, with mudstone, shale, sandstone and limestone.
How do we bore Santa Anna ground with shallow bedrock?
Nuvalde clay and mapped shallow bedrock call for a bore plan that accounts for changing resistance. Along Santa Anna streets, we track the drill head from the surface and log its depth and pitch.
- Nuvalde clay can ball up on a reamer, so we use thinner drilling fluid, add polymer and enlarge the hole in stages before pulling pipe.
- Because heavy clay is mapped in Santa Anna, we watch fluid returns closely near pavement to keep pressure from lifting the surface.
- With bedrock mapped within 60 inches across parts of town, we adjust the cutting approach and slow down where the bore meets rock.
- At a Wallis Avenue crossing, we expose marked utilities with hydrovac before drilling near them, then track the head and record depth and pitch.

Which roads, tracks or creeks can a Santa Anna bore cross near US 67?
US 67, US 84, US 283 and FM 1176 run inside Santa Anna, so a route may need to pass beneath a highway right of way. Wallis Avenue is the longest named street at 1.61 miles in town; Sante Fe Avenue runs 1.36 miles and Avenue B 1.24 miles. Those streets offer specific corridors to assess for a service or replacement bore. The mapped roadway lengths make early route planning useful, especially where a bore approaches a highway or street crossing.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| US 67 | US highway | 2.7 roadway miles inside | State highway office |
| US 84 | US highway | 2.3 roadway miles inside | State highway office |
| US 283 | US highway | 1.9 roadway miles inside | State highway office |
| FM 1176 | State highway | 1.9 roadway miles inside | State highway office |
| BNSF Railway | Railroad | 1.79 track miles inside | The railroad |
| Horse Creek | Stream | 0.67 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Spring Creek | Stream nearby | Along the boundary | Checked for Corps of Engineers jurisdiction |
| Sweetie Creek | Stream nearby | 0.8 miles outside | Checked for Corps of Engineers jurisdiction |
BNSF Railway has 1.79 track miles inside Santa Anna on the Lampasas Subdivision, and public records map 7 street and rail crossings in town. A crossing needs an agreement with BNSF Railway, which sets its conditions for casing, depth and flagging. Horse Creek has 0.67 channel miles inside town, with 2 mapped street crossings of named streams. Spring Creek touches the boundary, and Sweetie Creek is 0.8 miles from it. Around Santa Anna, our planning reflects that no lakes or ponds are mapped within one mile.
Who approves a Santa Anna bore near BNSF Railway?
A highway crossing sets the bore depth: TxDOT rules call for at least 60 inches of cover below the lowest crossed grade for electric and communication lines, and 60 inches for water lines. TxDOT also requires boring or tunneling beneath existing highway pavement, with a rural crossing extending beneath all travel lanes. For US 67, US 84, US 283 or FM 1176 right of way, the utility owner files through TxDOT’s online RULIS system. The TxDOT Brownwood District reviews it; we prepare the bore plan and profile for work under the utility owner’s permit. A bore under BNSF Railway needs an agreement with the railroad. Horse Creek crossings are checked during planning for U.S. Army Corps of Engineers jurisdiction.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Who owns water and electric lines in Santa Anna near City of Santa Anna?
The City of Santa Anna owns the public water system, which uses purchased surface water and reports 618 service connections serving 1,090 people. For a water bore near Wallis Avenue, that system is a key line owner to identify. AEP Texas North, Oncor Electric Delivery Company and Taylor Electric Cooperative report electric service in Coleman County. The electric line owner must be confirmed for the route before conduit specifications are set.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| City of Santa Anna | Public water system | Surface water bought from another system | 618 connections, 1,090 people served |
| AEP Texas North, Oncor Electric Delivery Company and Taylor Electric Cooperative | Electric utilities reporting service in Coleman County | EIA Form 861 | Confirm the line owner by address |
We use the American Community Survey 2019 to 2023 five year estimates, placing Santa Anna’s median housing year at 1957, to inform underground work around existing properties. The survey estimates 53 percent of housing was built before 1960, 40 percent from 1960 to 1999 and 7 percent in 2000 or later. Replacement work along Sante Fe Avenue may need to meet existing lines whose exact position or depth is unclear. We hydrovac pothole marked utilities before drilling near them; paint shows position, not depth.

How far is Santa Anna from Bangs and nearby towns?
Santa Anna is an incorporated town in Coleman County, with an area of 1.99 square miles and an elevation of 1,724 feet. Its ZIP code is 76878. Coleman, the county seat, is 8.7 miles northwest; Bangs is 11.6 miles east. Brownwood, the nearest larger city, is 20.5 miles east. The Yukon, Oklahoma main office is 356 road miles away, a drive of 7.0 hours. That distance can affect mobilization for a bore in Santa Anna, including work near US 67.
Places near Santa Anna
- Directional boring in Coleman: 8.7 miles northwest
- Directional boring in Bangs: 11.6 miles east
- Directional boring in Valera: 13.2 miles west
- Directional boring in Lake Brownwood: 14 miles northeast
- Directional boring in Brownwood: 20.5 miles east
What bores could serve Sante Fe Avenue in Santa Anna?
- Highway crossing: A bore beneath US 67 can carry water, sewer or conduit without cutting across the existing pavement.
- Water service: A connection near Wallis Avenue can tie into the City of Santa Anna system after the route and existing lines are checked.
- Fiber route: A conduit bore along Sante Fe Avenue can pass beneath driveways and sidewalks without opening a trench through them.
- Rail crossing: A utility route beneath BNSF Railway needs the railroad’s agreement and its conditions for casing, depth and flagging.
- Creek crossing: A bore near Horse Creek can keep the creek bank uncut while the crossing is reviewed for federal jurisdiction.
- Street replacement: A route along Avenue B can replace an aging service while keeping the street surface intact.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What do you need to quote a Santa Anna bore near Horse Creek?
For a route near Horse Creek, start with the address or a map pin. Tell us what is going in the ground, such as water, sewer, electric conduit or fiber, then give the pipe or conduit size and footage. A sketch or plans help show whether the route approaches US 67, BNSF Railway or a creek crossing.
For Santa Anna projects, we set pricing according to the job scope rather than assuming one price fits every underground crossing. Ground conditions matter: Santa Anna’s Nuvalde clay can stick to tooling, while mapped bedrock can add drilling time. Crossings matter too, including US 67 pavement, BNSF Railway tracks and Horse Creek. The route length, pipe size, utilities to expose, pavement, creek work, pits and excavator time all affect the plan. Mobilization also reflects the 356 road miles from Yukon, and high profile or emergency work can change what the job requires.
Questions people ask about boring in Santa Anna
Does Trinity Boring Solutions take directional boring jobs in Santa Anna and Coleman County?
Yes. We take directional boring work in Santa Anna, Coleman County, and across Texas. Our main office is in Yukon, Oklahoma, and our own crews work alongside crews from vetted partner drilling contractors. We stay your point of contact from the first call through the bore log, including a route under US 67.
Who owns electric lines in Santa Anna and Coleman County, and who confirms conduit specs?
AEP Texas North, Oncor Electric Delivery Company and Taylor Electric Cooperative report electric service in Coleman County; that does not identify the provider at every Santa Anna address. The line owner for the planned route should confirm conduit specifications before a bore is designed, including one along Wallis Avenue.
Does the city control Santa Anna streets like Avenue B, and can a bore avoid cutting them?
Because Santa Anna is incorporated, we treat its city streets as belonging to the city when planning street work. A directional bore beneath Avenue B can leave the street uncut, with work pits placed in the dirt on either side of the crossing. The route still needs to account for marked utilities below the street.
How old are homes and buried lines near Sante Fe Avenue in Santa Anna?
The American Community Survey 2019 to 2023 five year estimates put the median housing year at 1957, with 53 percent of housing built before 1960. That can make replacement bores along Sante Fe Avenue relevant, but housing age does not establish the age or depth of a buried line. Before drilling near marked utilities in Santa Anna, we expose them to plan the underground path.
Does Nuvalde soil in Santa Anna corrode steel, and what pipe can a bore use?
The USDA soil survey maps high steel corrosion risk across 67 percent of Santa Anna. For Santa Anna work, we follow the line owner’s choice of coating for steel casing or tracer wire. HDPE is not affected by that soil corrosion concern, so the pipe choice depends on the line owner’s requirements and the planned bore near Nuvalde soil.
What ground does a bore pass through in Santa Anna near Nuvalde soil?
The USDA soil survey maps Nuvalde clay loam across 20 percent of Santa Anna. At about 40 inches, bedrock is mapped across 45 percent, silty clay loam across 20 percent and silty clay across 19 percent. Those are mapped patterns, not test borings, so the exact route still needs a field plan.
How far is Santa Anna from Brownwood and Trinity’s Yukon main office?
Brownwood is 20.5 miles east of Santa Anna. Trinity’s Yukon, Oklahoma main office is 356 road miles away, a drive of 7.0 hours. That distance can affect mobilization for a job near US 84 or elsewhere in town, along with the route length and equipment the bore requires.
How early should I call Texas811 for a bore on Wallis Avenue in Santa Anna?
Make the Texas811 locate request at least 48 hours before starting a Wallis Avenue bore, counting two working days and excluding Saturdays, Sundays and legal holidays. The request cannot be made more than 14 days ahead. If a Santa Anna start slips more than 14 days past the original notice, we make a new request. Have worn or moved marks refreshed through Texas811 before work continues.
What affects the cost of a directional bore in Santa Anna near US 67?
The job scope sets the price, with no single local rate. Nuvalde clay and mapped bedrock affect drilling; a US 67 crossing, pavement and marked utilities add crossing work. Pipe size, bore length, pits, excavator time and backfill also matter. Horse Creek can add crossing planning, while the 356 road miles from Yukon affect mobilization.
Where the Santa Anna facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Santa Anna
- U.S. Census Bureau, TIGER/Line 2024: Santa Anna boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Santa Anna
- U.S. Census Bureau, American Community Survey 2019 to 2023: Santa Anna housing units and year built
- Macrostrat geologic map compilation: map units under Santa Anna
- U.S. EPA Safe Drinking Water Information System: public water systems serving Santa Anna
- U.S. Department of Transportation, North American Rail Network: track owners in Coleman County
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Coleman County
- U.S. Geological Survey, Elevation Point Query Service: Santa Anna elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Santa Anna
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Santa Anna
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Santa Anna, Texas
Type the address of your job in Santa Anna. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Santa Anna
Same county: Novice. All counties: Texas county list.
