Concepcion Texas Directional Boring: Gertrudis Soil, FM 716 and Concepcion Creek
Quick Answer: Concepcion is an unincorporated community, so Duval County and the state control roads; we do directional boring, also called horizontal directional drilling (HDD), for lines crossing FM 716. The Yukon main office is 634 road miles away, and a bore on Main Street needs mobilization planned around that distance. Gertrudis soil covers 72 percent of the mapped area, with clay that can hold an open hole and grip pipe. Concepcion Creek touches the community boundary, so a crossing needs site specific planning.
Concepcion bores at a glance
- Unincorporated community in Duval County, Texas. Population 42 (2020 Census count).
- Road distance from our Yukon, Oklahoma main office: 634 miles, about 12.5 hours of driving.
- Ground: Gertrudis soil is mapped on 72 percent of the area, with sandy clay loam about 40 inches down.
- Rock: no bedrock is mapped in the top 60 inches.
- Highways inside the boundary: FM 716. State permit office: TxDOT Laredo District.
- Railroad track inside the boundary: none mapped.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Which contractor handles directional boring near Concepcion Creek in Concepcion?
Concepcion is an unincorporated community in Duval County, with 42 people in the 2020 Census count. We take directional boring work for water, sewer, gas, electric conduit and fiber lines. In Concepcion, those lines could run beneath Main Street, Church Street or a service route that meets FM 716, depending on the address and project.
Our main office is in Yukon, Oklahoma, and Concepcion work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. We have done directional boring since 1982. Four decades of boring gives us a basis for planning in the Gertrudis fine sandy loam mapped across much of Concepcion, while checking the actual route before selecting a method.

What is Concepcion soil like to bore through near Gertrudis?
The USDA soil survey maps Gertrudis soil across 72 percent of the mapped community area, Premont across 18 percent and Colmena across 10 percent. All three map units are fine sandy loam at the surface. About 40 inches down, the mapped texture is sandy clay loam, with an average clay content of 28 percent. These are mapped soil patterns, not test borings. The clay can help a bore hole stay open, but it can also stick to the reamer and tighten around pipe during a pull.
| USDA soil survey, inside the Concepcion mapped community boundary | What is mapped |
|---|---|
| Soil series mapped | Gertrudis 72 percent, Premont 18 percent and Colmena 10 percent |
| Texture at the surface | fine sandy loam 100 percent |
| Texture about 40 inches down | sandy clay loam 100 percent |
| Engineering class about 40 inches down | lean clay (CL) 100 percent |
| Average clay content about 40 inches down | 28 percent |
| Bedrock mapped within 60 inches | None mapped |
| Seasonal water table within 60 inches | 0 percent of the area |
| Flood prone soils | 0 percent of the area |
| High corrosion risk for uncoated steel | 0 percent of the area |
Bedrock is not mapped in the top five feet, and seasonal water table, flood prone soils and high steel corrosion risk are not mapped in the community. The geology map includes Holocene sand sheet and Chibanian alluvium, a mix of sand, silt and clay that can include cemented calcium carbonate. Those mapped units do not confirm conditions at a particular address. At Concepcion Creek, we would plan the crossing depth against the channel and check whether federal review applies.
How is a bore run through Concepcion sandy clay loam?
The USDA survey maps sandy clay loam about 40 inches down in Concepcion. We plan the bore around that clay content, the marked utilities and the route beneath a named street such as Main Street.
- In Gertrudis soil, we use a drilling fluid plan suited to clay and ream in stages so sticky material does not build up on the cutting tools.
- Before a bore near Main Street, we expose marked utilities with hydrovac potholing; surface marks show where lines run, not how deep they are.
- As the drill advances through Concepcion’s sandy clay loam, a walkover locator tracks the head and we log its depth and pitch.
- For a route near Concepcion Creek, we plan the bore depth below the channel and check the crossing for possible federal jurisdiction.

What is in the way of a new line in Concepcion near FM 716?
FM 716 is the state highway mapped inside the Concepcion community, with 0.8 roadway miles there. Main Street is the longest named street at 0.86 miles, followed by Church Street at 0.22 miles and Ramirez Street at 0.14 miles. Water Tank Street runs 0.13 miles. These routes may shape a bore plan, but the actual path depends on the address and the lines that must be crossed. A bore can pass below pavement without opening a trench across the roadway.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| FM 716 | State highway | 0.8 roadway miles inside | State highway office |
| Concepcion Creek | Stream nearby | Along the boundary | Checked for Corps of Engineers jurisdiction |
| Macho Creek | Stream nearby | 0.5 miles outside | Checked for Corps of Engineers jurisdiction |
No railroad is mapped inside the community or within one mile outside it, so no local track crossing is identified. Concepcion Creek runs along or touches the mapped community boundary, while Macho Creek is 0.5 miles away. No named stream crossing by a street is mapped inside the community, and no lakes or ponds are mapped within one mile. A proposed creek bore still needs its own route and water crossing review.
Who has to sign off on Concepcion work in Duval County?
Concepcion has no city government. Duval County controls local public streets such as Main Street and Ramirez Street, while FM 716 is under state jurisdiction. For work in the FM 716 right of way, the line owner, not our drilling crew, submits the utility application through TxDOT’s RULIS system. The TxDOT Laredo District reviews it. We provide the bore plan and profile and work under the utility owner’s permit. TxDOT cover rules vary by line type, and the district can set different depths in the permit.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Which utilities need confirming before a Concepcion bore in Duval County?
The water provider for a specific Concepcion address has to be confirmed with the county or local water district before a bore is planned. EPA drinking water records do not match a provider to this place. AEP Texas Central, Medina Electric Cooperative and Nueces Electric Cooperative report electric service in Duval County, but that does not identify the owner at every address. We confirm the line owner before planning an electric conduit bore beneath Main Street or another route.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| AEP Texas Central, Medina Electric Cooperative and Nueces Electric Cooperative | Electric utilities reporting service in Duval County | EIA Form 861 | Confirm the line owner by address |
Housing figures are not published for Concepcion because the survey sample is too small to rely on. In a community with only 2.51 public road centerline miles, a project may involve a service run along Church Street or a longer connection to FM 716. September averages 4.3 inches of rain, the wettest month in Duval County, so ground conditions and access can change with weather. We hydrovac pothole marked utilities on the bore path before drilling near them; marks show position, not depth.

Where is Concepcion in relation to Benavides?
Concepcion is in Duval County, Texas, at an elevation of 301 feet and covers 0.08 square miles. Its ZIP code is 78349. Realitos is 11.3 miles west, Benavides is 14.4 miles north and Premont is 14.4 miles east. San Diego, the county seat, is 26.3 miles north; Alice is the nearest larger city at 30.6 miles northeast. The Yukon yard is 634 road miles away, a 12.5 hour drive, which is part of planning mobilization for work near FM 716.
Places near Concepcion
- Directional boring in Realitos: 11.3 miles west
- Directional boring in Benavides: 14.4 miles north
- Directional boring in Premont: 14.4 miles east
- Directional boring in Falfurrias: 17.5 miles southeast
- Directional boring in Cantu Addition: 18.1 miles southeast
- Directional boring in Alice: 30.6 miles northeast
Which jobs call for a bore near Church Street in Concepcion?
- Highway crossing: A line beneath FM 716 needs a bore plan for the state right of way, with cover and casing addressed in the TxDOT permit.
- Water service: A service near Main Street can be bored beneath pavement, with the address specific water provider confirmed before planning.
- Creek crossing: A proposed bore at Concepcion Creek needs a route that stays below the channel and a check for federal jurisdiction.
- Fiber conduit: A conduit run along Church Street can avoid opening the street, after marked utilities on its path are exposed.
- Sewer line: A replacement route near Ramirez Street can be drilled beneath the road, with utility crossings located before the bore begins.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
How do I get a quote for Concepcion work near Main Street?
For a bore near Main Street, give us the address or map pin, what will go underground, the pipe or conduit size and the footage. A sketch or plans help show whether the route meets FM 716, Church Street or Concepcion Creek. Those details let us review access, crossing points and the likely bore setup before pricing the work.
The Gertrudis soil and its sandy clay loam at about 40 inches matter because clay can load the reamer and grip the pipe. Next are the number of utilities to expose, the pipe size and bore length, then pavement, pits and excavator time. A crossing under FM 716 or near Concepcion Creek changes the work plan. Mobilization also reflects the 634 road miles from Yukon.
Questions people ask about boring in Concepcion
Does Trinity Boring Solutions take jobs in Concepcion, Duval County, and how are crews assigned?
Yes. We take directional boring work in Concepcion, Duval County, and manage the job from the first call through the bore log. Our own crews or partner contractor crews we have vetted may do the field work. The staffing arrangement does not change who you contact about a bore near FM 716.
Can a line be bored under Concepcion Creek at Concepcion?
A crossing can be planned, but the route, depth and site conditions need review first. Concepcion Creek touches the mapped community boundary. During planning, we check whether the proposed water crossing falls under U.S. Army Corps of Engineers jurisdiction, then match the bore plan to the channel and access.
Who owns the electric lines in Concepcion, Duval County, and who confirms conduit specs?
The address specific line owner must be confirmed before conduit planning. AEP Texas Central, Medina Electric Cooperative and Nueces Electric Cooperative report service in Duval County, but that does not establish which one serves a location on Main Street. The line owner confirms the conduit requirements for that route.
Does Duval County control Ramirez Street in Concepcion, and must it be cut for a bore?
Concepcion has no city government, so Duval County is responsible for local public streets such as Ramirez Street; FM 716 is a state road. A bore can pass beneath a street without cutting the pavement. The route still needs to account for buried utilities and any applicable road approval.
What do Concepcion housing records say about buried lines near Church Street?
Housing figures are not published for Concepcion because the survey sample is too small to rely on. That means a replacement bore near Church Street cannot be planned from a townwide housing age estimate. We use the project plans and expose marked lines along the proposed route before drilling close to them.
What ground does a Concepcion bore meet in Gertrudis soil?
The USDA soil survey maps Gertrudis across 72 percent of the community, with fine sandy loam at the surface and sandy clay loam about 40 inches down. The mapped clay content averages 28 percent at that depth. Clay can hold the hole open but may stick to tools and grip the pipe.
What bore sizes and lengths can Trinity handle near Water Tank Street in Concepcion?
We handle lines from 3/4 inch service lines up to 48 inch casing, with bore lengths from 10 feet to 5,000 feet. A job near Water Tank Street still depends on the route, ground and access. Send the size and footage so we can consider the right equipment and plan.
How much notice does Texas811 need for a Concepcion bore near Main Street?
Count back at least two working days from the planned start near Main Street, excluding Saturdays, Sundays and legal holidays. The request cannot be made earlier than 14 days before work. If the start slips more than 14 days past the original notice, submit a new request. Worn or moved marks must be refreshed through Texas811 before work continues.
What affects the cost of directional boring near FM 716 in Concepcion?
The price reflects the length and size of the line, Gertrudis soil conditions, utilities to expose, pavement, pits and equipment time. A route under FM 716 or near Concepcion Creek can add crossing work. Mobilization also matters because the Yukon yard is 634 road miles from Concepcion.
Where the Concepcion facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Concepcion
- U.S. Census Bureau, TIGER/Line 2024: Concepcion boundary, roads, rail lines and streams
- U.S. Census Bureau, 2020 Census: Concepcion population count
- U.S. Census Bureau, American Community Survey 2019 to 2023: Concepcion housing units and year built
- Macrostrat geologic map compilation: map units under Concepcion
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Duval County
- U.S. Geological Survey, Elevation Point Query Service: Concepcion elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Concepcion
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Concepcion
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Concepcion, Texas
Type the address of your job in Concepcion. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Concepcion
Same county: San Diego · Freer. All counties: Texas county list.
