Dimmitt Texas Directional Boring: Pullman Clay Loam, US 385 and Rail Track
Quick Answer: Can we get your line under US 385 without cutting the pavement? We do directional boring, also called horizontal directional drilling (HDD), in Dimmitt for crossings like this. The Yukon, Oklahoma main office is 320 road miles away, with the Lubbock and Western Railway also running through town. Pullman clay loam is common here, and sticky clay can grip pipe, so the reaming and pullback need to be planned together.
Dimmitt bores at a glance
- County seat of Castro County, Texas. Population 4,119 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 320 miles, about 6.2 hours of driving.
- Ground: Pullman soil is mapped on 43 percent of the area, with clay loam about 40 inches down.
- Rock: no bedrock is mapped in the top 60 inches.
- Highways inside the boundary: US 385, Texas State Highway 86, FM 3215, Texas State Highway 194 and FM 2392. State permit office: TxDOT Lubbock District.
- Railroad track inside the boundary: Lubbock and Western Railway, with 5 mapped street and rail crossings.
- Public water: Dimmitt Municipal Water System, groundwater wells.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Which contractor handles Dimmitt bores near the Lubbock and Western Railway?
Can we get your line under a road, track or creek without cutting across it? In Dimmitt, we plan directional boring for routes such as US 385 and the Lubbock and Western Railway. The Census Bureau Vintage 2024 estimate puts this Castro County seat at 4,119 people. We install water, sewer, gas, electric conduit and fiber, including service runs along Bedford Street or 3rd Street.
Our main office is in Yukon, Oklahoma, and Dimmitt work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. For a short 3/4 inch service near Bedford Street or a 48 inch casing job under the Lubbock and Western Railway, our capacity ranges from 10 feet to 5,000 feet. This family business started in 1965 and has done directional boring since 1982.

What kind of ground does Dimmitt’s Pullman soil bring to a bore?
The USDA soil survey maps Pullman across 43 percent of Dimmitt, with Olton at 35 percent and Estacado at 12 percent. Pullman clay loam on 0 to 1 percent slopes covers 42 percent of the mapped area. About 40 inches down, clay loam is mapped across 91 percent, and the average clay content at that depth is 40 percent. We treat Dimmitt’s mapped patterns as planning references, not as test borings for underground work. The heavy clay can cling to a reamer and swell around pipe, so the bore plan should account for sticky returns.
| USDA soil survey, inside the Dimmitt city limits | What is mapped |
|---|---|
| Soil series mapped | Pullman 43 percent, Olton 35 percent, Estacado 12 percent and Randall 5 percent |
| Texture at the surface | clay loam 92 percent and clay 6 percent |
| Texture about 40 inches down | clay loam 91 percent and clay 8 percent |
| Engineering class about 40 inches down | lean clay (CL) 91 percent and fat clay (CH) 8 percent |
| Average clay content about 40 inches down | 40 percent |
| Bedrock mapped within 60 inches | None mapped |
| Seasonal water table within 60 inches | 8 percent of the area |
| Flood prone soils | 0 percent of the area |
| High corrosion risk for uncoated steel | 98 percent of the area |
Bedrock is not mapped in the top five feet of Dimmitt, while the map identifies the Blackwater Draw Formation, a Cenozoic unit of sand, silt and locally clayey material. The survey maps a seasonal water table within 60 inches across 8 percent of the area, so some pits may need pumping. We plan underground work with the understanding that Dimmitt’s flood prone soils are not mapped. High steel corrosion risk covers 98 percent of the mapped area, a consideration for steel casing or tracer wire on a Bedford Street route.
What does it take to bore Dimmitt’s clay loam?
Pullman clay loam and the survey’s 40 percent average clay content call for a measured drilling pace. On a Dimmitt route such as 3rd Street, we watch fluid returns and keep the bore and pipe pullback coordinated.
- Pullman clay loam can cling to the reamer, so we use a thinner drilling fluid and staged reaming to limit buildup before a Bedford Street pipe pull.
- Where Dimmitt’s heavy clay grips pipe, we monitor fluid returns and keep pressure controlled so drilling fluid does not lift pavement near US 385.
- With seasonal water table mapped within 60 inches in parts of Dimmitt, we keep pits small and pump them if water collects near 3rd Street.
- Before the drill approaches a marked line near the Lubbock and Western Railway, we hydrovac expose it, then track depth and pitch from the surface.

Which roads and tracks can a Dimmitt bore cross near US 385?
US 385 has 6.6 mapped roadway miles inside Dimmitt, and Texas State Highway 86 has 3.0. FM 3215, Texas State Highway 194 and FM 2392 also run within the city limits. Bedford Street is the longest named street at 2.36 miles, followed by 3rd Street at 2.17 miles and Andrews Street at 1.77 miles. Boring can keep a route beneath pavement, but each crossing still needs a site specific path and access plan.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| US 385 | US highway | 6.6 roadway miles inside | State highway office |
| Texas State Highway 86 | State highway | 3 roadway miles inside | State highway office |
| FM 3215 | State highway | 1.7 roadway miles inside | State highway office |
| Texas State Highway 194 | State highway | 1.3 roadway miles inside | State highway office |
| FM 2392 | State highway | 0.8 roadway miles inside | State highway office |
| Lubbock and Western Railway | Railroad | 2.05 track miles inside | The railroad |
The Lubbock and Western Railway has 2.05 track miles in Dimmitt, and public mapping shows five street and rail crossings. A track bore needs an agreement from that railroad, with the crossing details set there. No named streams are mapped inside the limits, though 0.04 miles of unnamed drainage is shown. No lakes or ponds are mapped within one mile, so a mapped water crossing is not part of the local picture.
Who approves a Dimmitt bore in Castro County?
For work in the right of way of US 385, Texas State Highway 86, Texas State Highway 194, FM 3215 or FM 2392, the utility owner needs a TxDOT utility permit. The TxDOT Lubbock District reviews it, and the utility owner submits through the online RULIS system. We provide the bore plan and profile and work under the permit issued to that owner. Since Dimmitt is incorporated, we treat its city streets as belonging to the city when planning boring work. A crossing under the Lubbock and Western Railway also needs an agreement with the railroad that owns the track.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Which utilities serve Dimmitt’s Dimmitt Municipal Water System area?
The local government owns the Dimmitt Municipal Water System, which draws from groundwater wells and serves 4,393 people through 1,852 service connections. For electric lines, Southwestern Public Service, Bailey County Electric Cooperative Association, Deaf Smith Electric Cooperative and Lamb County Electric Cooperative report service in Castro County. We confirm which company owns the line along a route such as Bedford Street before planning an electric conduit bore.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| Dimmitt Municipal Water System | Public water system | Groundwater wells | 1,852 connections, 4,393 people served |
| Southwestern Public Service, Bailey County Electric Cooperative Association, Deaf Smith Electric Cooperative and Lamb County Electric Cooperative | Electric utilities reporting service in Castro County | EIA Form 861 | Confirm the line owner by address |
The American Community Survey 2019 to 2023 estimates put Dimmitt’s median home construction year at 1963; 42 percent of units were built before 1960, and 3 percent in 2000 or later. That mix can mean a project is replacing an older line or adding a new service near 5th Street. Before drilling, we hydrovac pothole marked utilities on the path, since locate paint shows position but not depth.

Do you cover Dimmitt, Hart and nearby Castro County?
Dimmitt is the Castro County seat, at an elevation of 3,867 feet, and covers 3.15 square miles. Its ZIP code is 79027. Nazareth is 11.6 miles east, Hart is 15.7 miles southeast, and Hereford is 19.7 miles north; Hereford is the nearest larger city. Our Yukon, Oklahoma main office is 320 road miles away, a 6.2 hour drive, so distance is one factor in planning a Dimmitt mobilization.
Places near Dimmitt
- Directional boring in Nazareth: 11.6 miles east
- Directional boring in Hart: 15.7 miles southeast
- Directional boring in Summerfield: 17.6 miles northwest
- Directional boring in Hereford: 19.7 miles north
- Directional boring in Springlake: 21.9 miles south
What kinds of bores come up on Dimmitt’s 3rd Street?
- Highway crossing: A bore under US 385 can carry water, sewer or conduit beneath pavement, with the route and pits planned for the roadside access.
- Street service: A water or sewer connection along Bedford Street can run beneath the street surface rather than across an open cut.
- Fiber drop: Fiber conduit near 3rd Street can be bored beneath sidewalks or driveways, with marked utilities exposed along the path first.
- Rail crossing: A utility route beneath the Lubbock and Western Railway needs railroad coordination for casing, depth and flagging.
- Water service: A connection near the Dimmitt Municipal Water System can carry a new or replacement line through Pullman clay loam.
- Electric conduit: Before a conduit bore near 5th Street, we identify the line owner and expose marked utilities along the planned route.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What do you need to quote a Dimmitt bore near Bedford Street?
For a Bedford Street service, start with the address or map pin and say what will go underground, such as water line or fiber. Give the pipe or conduit size and the footage, whether the route is a short service or a longer crossing near US 385. A sketch or plans showing the route and pits help us understand the job.
A clear route on level Pullman clay loam can be simpler to plan than a path with several exposed utilities or pavement to cross. Price depends on bore length, pipe size, soil, crossings, concrete or pavement, pits, backfill and excavator time. A US 385 or Lubbock and Western Railway crossing can add coordination, and the 320 road miles from Yukon affect mobilization. Emergency work can also change the scope.
Questions people ask about boring in Dimmitt
Does Trinity Boring Solutions take Dimmitt jobs in Castro County, and who staffs them?
Yes. We take directional boring jobs in Dimmitt, including routes near US 385. Our own crews handle the work, and vetted partner drilling contractors run satellite yards when used. You work with Trinity from the first call through the bore log, even when a partner crew is on site.
Will a Dimmitt bore hit rock near Bedford Street?
The USDA soil survey does not map bedrock in Dimmitt’s top five feet. The geologic map shows the Blackwater Draw Formation, made of sand, silt and locally clayey material, above older Cenozoic sedimentary rocks. That mapping cannot rule out deeper rock, so the actual route and depth still matter for a Bedford Street bore.
Who approves a Dimmitt utility bore under US 385?
TxDOT reviews a US 385 right of way utility permit through its Lubbock District. The utility owner files the application in the online RULIS system, while we prepare the bore plan and profile and work under the permit issued to that owner. The crossing depth and installation details follow the permit requirements for US 385.
What does a Dimmitt bore under the Lubbock and Western Railway require?
The Lubbock and Western Railway owns the 2.05 track miles mapped inside Dimmitt. A bore beneath its track needs an agreement with the railroad, which sets casing, depth and flagging. If the utility also occupies highway right of way, TxDOT asks for a copy of that railroad agreement.
Who runs Dimmitt’s public water system, and where does its water come from as we plan underground work?
The local government owns the Dimmitt Municipal Water System, and groundwater wells supply it. Dimmitt’s public water system lists 1,852 service connections serving 4,393 people, figures we consider when planning underground work. For a new or replacement service near Bedford Street, the system’s presence is a reason to identify and expose existing lines before drilling.
Which electric utilities report service in Dimmitt and Castro County?
Southwestern Public Service, Bailey County Electric Cooperative Association, Deaf Smith Electric Cooperative and Lamb County Electric Cooperative report electric service in Castro County. That does not identify the owner at every Dimmitt address. We confirm the line owner before planning conduit, including on a route near 5th Street.
What bore sizes and lengths can Trinity handle near Dimmitt’s 5th Street?
We handle lines from 3/4 inch service size up to 48 inch casing, with bore lengths from 10 feet to 5,000 feet. A short service near 5th Street and a longer highway crossing are different scopes, so send the route, footage and pipe or conduit size for planning.
How much notice does Texas811 need for a Dimmitt bore near Bedford Street?
Count back at least 48 hours from the planned start, excluding Saturdays, Sundays and legal holidays; Texas811 describes that as at least two working days. The request cannot be made more than 14 days before work. If the start slips more than 14 days past the original notice, make a new request; worn or moved marks must be refreshed through Texas811 before work continues.
What affects the cost of a Dimmitt bore crossing US 385?
In Dimmitt, we price each boring job according to its scope and the underground work involved. Length, pipe size, Pullman clay loam, exposed utilities, pavement, pits, backfill and excavator time all matter. A US 385 crossing or work at the Lubbock and Western Railway can require added coordination, while Dimmitt’s 320 road miles from Yukon affect mobilization. Emergency or high profile work can change the scope too.
Where the Dimmitt facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Dimmitt
- U.S. Census Bureau, TIGER/Line 2024: Dimmitt boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Dimmitt
- U.S. Census Bureau, American Community Survey 2019 to 2023: Dimmitt housing units and year built
- Macrostrat geologic map compilation: map units under Dimmitt
- U.S. EPA Safe Drinking Water Information System: public water systems serving Dimmitt
- U.S. Department of Transportation, North American Rail Network: track owners in Castro County
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Castro County
- U.S. Geological Survey, Elevation Point Query Service: Dimmitt elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Dimmitt
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Dimmitt
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Dimmitt, Texas
Type the address of your job in Dimmitt. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.