Summerfield Texas Directional Boring: Pullman Clay Loam, US 60 and BNSF Railway
Quick Answer: Along US 60, Trinity Boring Solutions handles directional boring, also called horizontal directional drilling (HDD), in Summerfield, Texas. Walnut and 7th Street are among the community’s longest named streets, and our Yukon, Oklahoma main office is 310 road miles away. Pullman clay loam is mapped across Summerfield, including at about 40 inches. Its sticky cuttings call for controlled fluid and staged reaming.
Summerfield bores at a glance
- Unincorporated community in Castro County, Texas. Population 34 (2020 Census count).
- Road distance from our Yukon, Oklahoma main office: 310 miles, about 5.8 hours of driving.
- Ground: Pullman soil is mapped on 100 percent of the area, with clay loam about 40 inches down.
- Rock: no bedrock is mapped in the top 60 inches.
- Highways inside the boundary: US 60 and FM 1057. State permit office: TxDOT Lubbock District.
- Railroad track inside the boundary: none mapped.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Who handles directional boring on Walnut in Summerfield?
We take directional boring work in Summerfield, an unincorporated community in Castro County with 34 people in the 2020 Census count. Water, sewer, gas, electric conduit and fiber lines can follow routes along Walnut, 7th Street or US 60, depending on the project. We plan the bore around the actual route and the lines already in its path.
Our main office is in Yukon, Oklahoma, and Summerfield work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our longest bore ran roughly 4,100 feet under the Arkansas River in Tulsa. A typical Summerfield job beside that reach may be a shorter service or utility crossing along US 60. For planning near US 60 in Summerfield, our family business began in 1965, and we have done directional boring since 1982.

How does Pullman soil affect drilling in Summerfield?
The USDA soil survey maps Pullman across Summerfield. Pullman clay loam, 0 to 1 percent slopes, covers 91 percent of the mapped area, while the 1 to 3 percent slopes unit covers 9 percent. Clay loam is mapped across the area at about 40 inches, with an average clay content of 39 percent at that depth. Near US 60 in Summerfield, we treat these as mapped soil patterns, not test borings, and do not use them as bore logs. For a bore near Walnut, that clay rich ground can cling to the reamer and grip pipe, so we manage fluid and reaming carefully.
| USDA soil survey, inside the Summerfield mapped community boundary | What is mapped |
|---|---|
| Soil series mapped | Pullman 100 percent |
| Texture at the surface | clay loam 100 percent |
| Texture about 40 inches down | clay loam 100 percent |
| Engineering class about 40 inches down | lean clay (CL) 100 percent |
| Average clay content about 40 inches down | 39 percent |
| Bedrock mapped within 60 inches | None mapped |
| Seasonal water table within 60 inches | 0 percent of the area |
| Flood prone soils | 0 percent of the area |
| High corrosion risk for uncoated steel | 100 percent of the area |
When planning near BNSF Railway in Summerfield, we remember bedrock is not mapped in the top five feet, though that does not rule out deeper rock. The USDA soil survey also maps no seasonal water table within 60 inches and no flood prone soil, which gives us no mapped shallow water or flood zone to plan around. High steel corrosion risk covers the mapped area, so the line owner should consider casing and tracer wire materials. The map shows the Blackwater Draw Formation, Cenozoic sand, fine alluvium and silt, locally clayey; deeper mapped Cenozoic sedimentary rocks are Paleocene.
How do we bore through Summerfield clay loam?
Pullman clay loam is the key ground condition for a bore near Walnut or 7th Street. We use a controlled drilling sequence to limit sticky buildup and keep the bore path on line.
- On Walnut, we select fluid for Pullman clay loam and keep it controlled, since heavy clay can stick to the reamer and swell around the pipe.
- Where a bore runs near 7th Street, we ream in stages and have the pipe ready so the open hole is not left waiting.
- Before drilling close to marked services along US 60, we hydrovac pothole each one to see its depth instead of relying on surface paint.
- As the head advances through Summerfield clay loam, we track it from the surface and record its depth and pitch.

What could a bore cross in Summerfield near BNSF Railway?
US 60 has 1.7 mapped roadway miles inside Summerfield’s community boundary, and FM 1057 has 0.4. There are no mapped highways within 1.5 miles outside that boundary. Among named streets, Walnut runs 0.33 miles in the community, 7th Street 0.3 miles and 4th Street 0.28 miles. A route along US 60 or these streets may encounter pavement, driveways or buried services, so a bore can keep the surface intact while the path is planned around them.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| US 60 | US highway | 1.7 roadway miles inside | State highway office |
| FM 1057 | State highway | 0.4 roadway miles inside | State highway office |
| BNSF Railway | Railroad nearby | 0 miles outside | The railroad |
BNSF Railway runs along or touches the Summerfield boundary, but no railroad is mapped inside the community and no street and rail crossing is mapped there. No streams or lakes are mapped inside or within one mile, so the records identify no local creek or water crossing. If a planned route reaches BNSF Railway, the track owner’s agreement will set the crossing conditions, including casing, depth and flagging.
Who approves a bore in Summerfield and Castro County?
Summerfield has no city government, so local streets such as Walnut and 4th Street are handled by the county, while US 60 and FM 1057 fall under state highway review. For work in a highway right of way, the line owner, not our drilling crew, applies for a TxDOT utility permit through RULIS. We give the owner the bore plan and profile, and the TxDOT Lubbock District reviews it. TxDOT cover rules set 60 inches for electric and communication lines crossing a highway, with different requirements for lines running along the right of way and for water or sewer. A route at BNSF Railway also needs the railroad owner’s agreement.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Whose lines may be buried in Summerfield, Castro County?
The water provider for a specific Summerfield address must be confirmed with Castro County or the local water district before we plan a bore. The provider cannot be matched to the community from the available records, so we do not assume one serves every property. Utilities reporting electric service in Castro County include Southwestern Public Service, Bailey County Electric Cooperative Association, Deaf Smith Electric Cooperative and Lamb County Electric Cooperative. We confirm the electric line owner before planning conduit work near US 60 or Walnut.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| Southwestern Public Service, Bailey County Electric Cooperative Association, Deaf Smith Electric Cooperative and Lamb County Electric Cooperative | Electric utilities reporting service in Castro County | EIA Form 861 | Confirm the line owner by address |
Housing figures are not published for a place as small as Summerfield, so the age of buried services along 7th Street cannot be inferred from a local housing survey. A small community can still have long service runs and lines following its roads. Castro County averages 3.0 inches of precipitation in June and 0.5 inches in February, details that help us consider site conditions when scheduling. Before the drill nears a marked line on Walnut, we use hydrovac potholing to expose it; paint shows a route, not its depth.

Where is Summerfield in relation to Hereford?
Summerfield is an unincorporated community in Castro County, at an elevation of 3,936 feet and with a land area of 0.15 square miles. Its ZIP code is 79085. Hereford is 8.4 miles northeast and is the nearest larger city; Friona is 14.0 miles southwest, and Dimmitt, the county seat, is 17.6 miles southeast. From our Yukon, Oklahoma main office, the trip to Summerfield is 310 road miles and 5.8 hours by drive. That distance is part of planning a job along US 60.
Places near Summerfield
- Directional boring in Hereford: 8.4 miles northeast
- Directional boring in Friona: 14 miles southwest
- Directional boring in Dimmitt: 17.6 miles southeast
- Directional boring in Bovina: 26.4 miles southwest
- Directional boring in Nazareth: 26.9 miles southeast
What could we bore near 7th Street in Summerfield?
- Highway crossing: A route beneath US 60 is bored rather than open cut, with the line owner arranging the TxDOT permit for right of way work.
- Water service: A service route near Walnut needs the address specific water provider confirmed before we set the bore path.
- Fiber conduit: A conduit bore along 7th Street can pass beneath pavement, with marked utilities exposed before drilling nearby.
- Rail crossing: If a route reaches BNSF Railway at the Summerfield boundary, its owner’s crossing agreement sets the conditions for the bore.
- Street utility: A line crossing 4th Street can be installed below the surface, avoiding an open cut through the road.
- Electric conduit: Near FM 1057, we confirm the line owner and coordinate the bore plan with the utility permit holder.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What should I send for a Summerfield bore near US 60?
For a Summerfield quote, send the address or map pin, what will go in the ground, the pipe or conduit size and the footage; a sketch or plans help us understand the route. A route along US 60 should show the pavement and any nearby utilities, since those details affect the bore plan as well as the work area.
Pullman clay loam is the first pricing consideration because sticky clay can take more control during reaming and pipe pullback. The number and exposure of utilities along Walnut or 7th Street matter next, along with pipe size, bore length and pavement. A route involving BNSF Railway or a drainage crossing can add planning or crossing work. Pits, excavator time and sand backfill also affect the scope. Mobilization from Yukon matters because Summerfield is 310 road miles from our main office.
Questions people ask about boring in Summerfield
Does Trinity take directional boring work in Summerfield, Castro County?
Yes. We take directional boring work in Summerfield, and the customer works with Trinity from the first call through the bore log. Our own crews or crews from satellite yards managed by drilling contractors we have vetted may staff the job. The route and scope on a street such as Walnut determine the field plan.
Will a bore under US 60 in Summerfield hit rock, though bedrock is not mapped in the top five feet?
Rock is not mapped in the top five feet of Summerfield, but that does not rule out rock deeper down. The geologic map shows the Blackwater Draw Formation, with Cenozoic sand, fine alluvium and silt, and also identifies deeper Cenozoic sedimentary rocks of Paleocene age. We plan from site conditions along the actual route.
Who approves our bore under US 60 in Summerfield, and what approval is needed before that crossing proceeds?
For work in the US 60 right of way, TxDOT reviews the utility permit through its Lubbock District. The line owner files in TxDOT’s RULIS system; we provide the bore plan and profile. A crossing route also has to account for TxDOT cover requirements and the specific alignment along US 60.
For a Summerfield crossing under BNSF Railway, what must we arrange before directional boring can proceed?
BNSF Railway runs along or touches the Summerfield boundary, though no track is mapped inside the community. If a bore must cross its track, the railroad owner’s agreement sets requirements such as casing, depth and flagging. When the route also uses highway right of way near US 60, the railroad agreement is relevant to the TxDOT permit.
Who owns electric lines in Summerfield, Castro County, and who sets conduit specs?
Several utilities report electric service in Castro County: Southwestern Public Service, Bailey County Electric Cooperative Association, Deaf Smith Electric Cooperative and Lamb County Electric Cooperative. That does not establish which one serves a particular Summerfield address. We confirm the line owner before a conduit bore near Walnut, and the owner provides the applicable conduit specifications.
Who is in charge of 4th Street in Summerfield, and does it have to be cut?
Summerfield is unincorporated and has no city government, so its local streets are handled by the county rather than a city. A bore beneath 4th Street can avoid cutting the roadway; the route still needs to account for marked lines and access. US 60 and FM 1057 are state highways with TxDOT right of way rules.
How much notice does Texas811 need for a Summerfield bore along Walnut?
The locate request for work along Walnut must be made at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before it. If the start moves more than 14 days beyond the original notice, a new request is needed. In Summerfield, we refresh marks through Texas811 if they wear off or move, before work continues.
How far is Summerfield from the Yukon office, and does Hereford affect the job?
Summerfield is 310 road miles and 5.8 drive hours from our Yukon, Oklahoma main office. Hereford is 8.4 miles northeast of Summerfield, but it does not change the route or scope at the job address. The Yukon distance can affect mobilization planning for work along US 60 or the local streets.
How do we assess what affects the cost of directional boring in Summerfield near US 60, including crossing requirements?
The scope sets the price, with Pullman clay loam, bore length and pipe or conduit size among the main factors. Utility crossings and exposures, pavement, pits, excavator time and backfill also matter. Work involving US 60 or BNSF Railway may require added planning, and mobilization reflects the 310 road miles from Yukon. We price the work from its specific conditions, not a set local rate.
Where the Summerfield facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Summerfield
- U.S. Census Bureau, TIGER/Line 2024: Summerfield boundary, roads, rail lines and streams
- U.S. Census Bureau, 2020 Census: Summerfield population count
- Macrostrat geologic map compilation: map units under Summerfield
- U.S. Department of Transportation, North American Rail Network: track owners in Castro County
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Castro County
- U.S. Geological Survey, Elevation Point Query Service: Summerfield elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Summerfield
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Summerfield
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Summerfield, Texas
Type the address of your job in Summerfield. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Summerfield
Same county: Hart. All counties: Texas county list.