Lockney Texas Directional Boring: Pullman Clay Loam, US 70 And 8th Street
Quick Answer: US 70 is the main highway bore to plan around, and Trinity Boring Solutions takes directional boring, also called horizontal directional drilling (HDD), work in Lockney, Texas. Lockney is 303 road miles from our Yukon, Oklahoma main office, so mobilization is part of planning for a run near 8th Street. USDA maps Pullman clay loam across most of town, and sticky clay can hold the hole and grip the pipe. We stage reaming in Pullman soil and manage fluid before pulling pipe.
Lockney bores at a glance
- Incorporated city in Floyd County, Texas. Population 1,380 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 303 miles, about 6.5 hours of driving.
- Ground: Pullman soil is mapped on 97 percent of the area, with clay loam about 40 inches down.
- Rock: no bedrock is mapped in the top 60 inches.
- Highways inside the boundary: US 70, FM 378 and FM 97. State permit office: TxDOT Lubbock District.
- Railroad track inside the boundary: none mapped.
- Public water: City of Lockney, surface water bought from another system.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Who handles directional boring near 8th Street in Lockney?
US 70 is a key route for utility work in Lockney, and we install water, sewer, gas, electric conduit and fiber beneath streets and properties where the route calls for it. The Census Bureau Vintage 2024 estimate puts Lockney at 1,380 people in Floyd County. A bore along 8th Street, for example, can carry a service line without opening the pavement along its route.
Our main office is in Yukon, Oklahoma, and Lockney work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Trinity is a family business started in 1965, with directional boring since 1982. We have had no utility strike in over 25 years, a record that matters around the City of Lockney water lines and the electric systems reported in Floyd County.

What does Pullman soil mean for a bore in Lockney?
The USDA soil survey maps Pullman soil across 97 percent of Lockney and Estacado across 3 percent. Pullman clay loam, on 0 to 1 percent slopes, covers 95 percent of the mapped area; Estacado clay loam covers 3 percent. The mapped surface texture is clay loam, and the texture at about 40 inches is also clay loam. At that depth, the mapped average clay content is 39 percent, and the survey classifies the area as heavy clay. Pullman and Estacado clay loam mapping gives us context for Lockney boring plans, not test borings. In practice, clay can cling to the reamer and grip pipe.
| USDA soil survey, inside the Lockney city limits | What is mapped |
|---|---|
| Soil series mapped | Pullman 97 percent and Estacado 3 percent |
| Texture at the surface | clay loam 100 percent |
| Texture about 40 inches down | clay loam 100 percent |
| Engineering class about 40 inches down | lean clay (CL) 100 percent |
| Average clay content about 40 inches down | 39 percent |
| Bedrock mapped within 60 inches | None mapped |
| Seasonal water table within 60 inches | 0 percent of the area |
| Flood prone soils | 0 percent of the area |
| High corrosion risk for uncoated steel | 100 percent of the area |
The USDA soil survey does not map bedrock within 60 inches of the surface in Lockney, so rock is not mapped in the top five feet; that does not rule out deeper rock. A seasonal water table and flood prone soils are not mapped. The survey maps high steel corrosion risk across the area, so the line owner should consider casing and tracer wire materials; HDPE avoids the soil corrosion concern. The geologic map names Eolian Sheet Sand, a Cenozoic unit described as silty to clayey fine or medium sand. Pullman clay loam remains the main planning concern for fluid and reaming.
How do we drill Lockney’s clay loam?
Pullman clay loam can stay open but stick to the reamer and pipe. On a route near 8th Street, we plan the fluid, staged reaming and pipe pull around those clay conditions.
- Pullman clay loam can ball on the reamer, so we use a thinner drilling fluid with polymer and open the hole in stages before pulling pipe.
- On a Lockney route beneath pavement, we watch fluid returns and keep pressure controlled so clay conditions do not lift the surface.
- Before drilling near the City of Lockney water lines or electric lines reported in Floyd County, we hydrovac expose each marked utility on the bore path.
- Along 8th Street, a walkover locator tracks the drill head from the surface while we record depth and pitch as the bore advances.

What does a bore have to cross in Lockney near US 70?
US 70 has 1.7 mapped roadway miles inside Lockney; FM 378 has 1.8, and FM 97 has 1.2. Those routes can put a utility bore under a state or US highway, where the planned path and pavement protection matter. The longest named street is 8th Street at 2.63 miles in town. 2nd Street and 4th Street each have 1.7 miles mapped, while 6th Street has 1.6. A route along any of these streets needs utility locations checked before drilling.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| US 70 | US highway | 1.7 roadway miles inside | State highway office |
| FM 378 | State highway | 1.8 roadway miles inside | State highway office |
| FM 97 | State highway | 1.2 roadway miles inside | State highway office |
Public records map no railroad within Lockney or within one mile outside its limits, and no street and rail crossing is mapped. No streams are mapped in town or within one mile outside it, and no street crossing of a named stream is mapped. We find no mapped lakes or ponds within one mile of Lockney, so 8th Street planning still needs site specific review. That means the mapped crossing picture around US 70 is mainly roads and buried utilities, rather than a local track or watercourse.
Who approves a bore in Lockney and Floyd County?
For a US 70 crossing, the TxDOT cover depth sets the bore profile: electric and communication lines need 60 inches below the lowest crossed grade, and water and pressurized sewer lines need 60 inches. Along highway right of way, the listed depths are 48 inches for electric and communication lines and 36 inches for water. TxDOT requires boring or tunneling beneath existing highway pavement, with crossings encased; its rural highway rule calls for the bore to extend under all travel lanes. The utility owner files the right of way application in RULIS, and the TxDOT Lubbock District reviews it. For filings through TxDOT Lubbock District, we provide the bore plan and profile for the Lockney work. Lockney street work falls under the city because Lockney is incorporated. No railroad agreement is implicated by a mapped local track crossing.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
What is already in the ground near the City of Lockney?
The City of Lockney public water system uses purchased surface water and reports 768 service connections serving 1,328 people. That makes its water lines a key locate to check on a bore route in town. Electric service reported in Floyd County includes Southwestern Public Service, Lighthouse Electric Cooperative and South Plains Electric Cooperative. Those records do not identify the provider at every address, so we confirm the line owner before planning an electric conduit bore. Near the City of Lockney water system and electric lines, marked utilities on the bore path need hydrovac exposure before the drill approaches.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| City of Lockney | Public water system | Surface water bought from another system | 768 connections, 1,328 people served |
| Southwestern Public Service, Lighthouse Electric Cooperative and South Plains Electric Cooperative | Electric utilities reporting service in Floyd County | EIA Form 861 | Confirm the line owner by address |
The 2019 to 2023 five year estimates put Lockney’s median housing year at 1958; we still verify existing utilities before boring. The estimates show 61 percent of housing built before 1960, 33 percent from 1960 to 1999 and 6 percent in 2000 or later. That age mix makes replacement bores along streets such as 2nd Street a different planning question from a new service. It does not establish the age of any buried line. We expose marked utilities along the planned path before drilling near them because locate marks show position, not depth.

How far is Lockney from Plainview and our Yukon office?
Lockney is an incorporated town in Floyd County, at an elevation of 3,279 feet and covering 1.55 square miles. Its ZIP code is 79241. Floydada, the county seat, is 11.4 miles southeast; Seth Ward is 15.8 miles northwest; and Plainview, the nearest larger city, is 16.7 miles west. Petersburg is 19.5 miles southwest, and Hale Center is 23.4 miles west. From our Yukon, Oklahoma main office, Lockney is 303 road miles away, a 6.5 hour drive. That distance is part of mobilization planning for a job near US 70 or 8th Street.
Places near Lockney
- Directional boring in Floydada: 11.4 miles southeast
- Directional boring in Seth Ward: 15.8 miles northwest
- Directional boring in Plainview: 16.7 miles west
- Directional boring in Petersburg: 19.5 miles southwest
- Directional boring in Hale Center: 23.4 miles west
What would we bore near 4th Street in Lockney?
- Highway crossing: A bore beneath US 70 follows the TxDOT profile and keeps existing highway pavement uncut.
- Water service: A route near 4th Street can connect a service while avoiding an open cut along the street.
- Water main work: A bore near the City of Lockney system needs the marked water lines exposed before the drill approaches.
- Electric conduit: Near 2nd Street, we confirm the electric line owner before laying out a conduit route.
- Fiber route: A fiber bore along 8th Street can pass beneath pavement while keeping the street surface intact.
- Street service: A replacement line near FM 378 can be planned around the mapped Pullman clay loam and marked utilities.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What should I send for a Lockney bore quote near 8th Street?
For a route near 8th Street, start with the address or map pin. Tell us what is going in the ground, such as a water line or fiber conduit, then give the pipe or conduit size and the footage. A sketch or plans help show where the route meets a street or US 70. We stay involved from the first call through the bore log, whichever crew is on site.
For a proposed US 70 crossing, we set price from its job scope. Pullman clay loam can affect drilling and fluid needs; a crossing at US 70 brings highway requirements into the plan; and marked utilities may need exposure along the route. Pipe size, footage, pavement, pits, excavator time and backfill also matter. Creek or drainage crossings are another factor when present. Lockney is 303 road miles from Yukon, so mobilization is part of the logistics. High profile or emergency work can also change the planning needs.
Questions people ask about boring in Lockney
Does Trinity take directional boring work in Floyd County near Lockney, and who staffs it?
Yes. We take directional boring work in Lockney along FM 378 and across Texas, planning each route around the project scope. Our own crews and vetted partner contractor crews handle the field work, while you deal with Trinity from the first call through the bore log. For a route near 8th Street in Floyd County, we plan the bore around the address and ground conditions.
Who approves a Lockney bore beneath US 70?
The utility owner applies for a right of way permit through TxDOT’s RULIS system, and the TxDOT Lubbock District reviews it. For a US 70 crossing, the owner submits the application and we provide the bore plan and profile. TxDOT’s permit sets the approved crossing conditions.
For Lockney in Floyd County, who runs the public water system, and where does its water come from?
The City of Lockney owns and runs the public water system, which uses purchased surface water. Public records list 768 service connections serving 1,328 people. We account for those water lines when planning a bore near a Lockney street or property.
Which electric company serves my Lockney address in Floyd County, and who confirms conduit needs?
Southwestern Public Service, Lighthouse Electric Cooperative and South Plains Electric Cooperative report electric service in Floyd County, but that does not identify the provider at every address. We confirm the line owner before planning conduit. Near 4th Street, marked lines on the planned route are exposed before drilling close to them.
Does Lockney control 4th Street, and can we avoid cutting it?
Lockney is incorporated, so the city is responsible for its city streets. A bore near 4th Street can pass beneath the pavement rather than opening a trench across it. The route still needs planning around marked utilities and any applicable approval for the work.
Does the housing age near 2nd Street tell us how old buried lines are in Lockney?
No. The American Community Survey estimates a 1958 median housing year in Lockney, but that does not date any particular buried line. On a replacement bore near 2nd Street, we plan for the existing route and expose marked utilities because paint shows position, not depth.
Does Lockney’s distance from Plainview change a bore scheduled from Yukon?
From our Yukon, Oklahoma main office, Lockney is 303 road miles and a 6.5 hour drive, so we plan travel around the job schedule. Plainview is 16.7 miles west and is the nearest larger city. That distance affects mobilization planning for a bore near US 70 or another Lockney route.
How early should I request 811 marks for a Lockney bore near 8th Street?
For an 8th Street excavation, make the Texas811 locate request at least 48 hours before the start, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before excavation. If the start slips more than 14 days past the original notice near Shurbet Street, we make a new request. Before work continues near Locust Street, we have worn or moved marks refreshed through Texas811.
What affects the price of a Lockney directional bore under US 70?
The scope determines the price, not a single factor. Pullman clay loam, pipe size and footage affect the drilling plan; US 70 crossings add highway planning; and marked utilities, pavement, pits and backfill can add work. Lockney’s 303 road miles from Yukon also make mobilization part of the job.
Where the Lockney facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Lockney
- U.S. Census Bureau, TIGER/Line 2024: Lockney boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Lockney
- U.S. Census Bureau, American Community Survey 2019 to 2023: Lockney housing units and year built
- Macrostrat geologic map compilation: map units under Lockney
- U.S. EPA Safe Drinking Water Information System: public water systems serving Lockney
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Floyd County
- U.S. Geological Survey, Elevation Point Query Service: Lockney elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Lockney
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Lockney
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Lockney, Texas
Type the address of your job in Lockney. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Lockney
All counties: Texas county list.