Floydada Texas Directional Boring: Pullman Clay Loam, US 70 and Farm Road 784
Quick Answer: Can we get your line beneath US 70 without cutting pavement? Yes, Trinity handles directional boring, also called horizontal directional drilling (HDD), in Floydada for crossings like US 70. Our Yukon, Oklahoma main office is 312 road miles away, and Lee Street gives us a local route to assess. USDA maps show Pullman clay loam across most of Floydada. Pullman clay loam can load the reamer, so we stage the passes and plan the pipe pull.
Floydada bores at a glance
- County seat of Floyd County, Texas. Population 2,503 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 312 miles, about 6.2 hours of driving.
- Ground: Pullman soil is mapped on 95 percent of the area, with clay loam about 40 inches down.
- Rock: no bedrock is mapped in the top 60 inches.
- Highways inside the boundary: US 70, US 62, Texas State Highway 207, FM 784 and FM 1958. State permit office: TxDOT Lubbock District.
- Railroad track inside the boundary: none mapped.
- Public water: City of Floydada, surface water bought from another system.
- Electric: City of Floydada municipal electric system.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Which contractor handles directional boring in Floyd County near Floydada?
Can we put a line under Lee Street or another Floydada road without cutting the surface? We take directional boring work in Floydada, in Floyd County, where the Census Bureau Vintage 2024 estimate puts the population at 2,503. We install water, sewer, gas, electric conduit and fiber, including routes beneath streets such as Lee Street when the project calls for a crossing.
Our main office is in Yukon, Oklahoma, and Floydada work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Since 1982, four decades of directional boring have taught us how to plan for the sticky Pullman clay loam mapped around Floydada. Our family business started in 1965, and Trinity stays involved from the first call through the bore log, whichever crew is on site.

How does Pullman soil shape a bore in Floydada?
The USDA soil survey maps Pullman soil across 95 percent of Floydada, with Pullman clay loam on 93 percent of the mapped area. Clay loam makes up 96 percent of the soil texture at about 40 inches below the surface; clay accounts for the other 4 percent at that depth. The average clay content there is 40 percent. Pullman soil maps describe patterns for Floydada bores, not test borings, so we use them as planning context only. In the field, this ground can stick to a reamer and grip pipe, so we plan staged reaming and a prompt pull after opening the hole.
| USDA soil survey, inside the Floydada city limits | What is mapped |
|---|---|
| Soil series mapped | Pullman 95 percent |
| Texture at the surface | clay loam 97 percent and clay 3 percent |
| Texture about 40 inches down | clay loam 96 percent and clay 4 percent |
| Engineering class about 40 inches down | lean clay (CL) 96 percent and fat clay (CH) 4 percent |
| Average clay content about 40 inches down | 40 percent |
| Bedrock mapped within 60 inches | None mapped |
| Seasonal water table within 60 inches | 4 percent of the area |
| Flood prone soils | 0 percent of the area |
| High corrosion risk for uncoated steel | 100 percent of the area |
Bedrock is not mapped in the top five feet of Floydada, but deeper rock is not ruled out. The USDA soil survey maps a seasonal water table within 60 inches across 4 percent of the area, so pits may need pumping. Floydada’s clay loam mapping does not include flood prone soils, so we account for that limit when planning a bore. High steel corrosion risk covers the mapped area, a concern for uncoated casing or tracer wire; the line owner selects coatings, while HDPE is unaffected. The geologic map shows Eolian sheet sand of Cenozoic age and Cenozoic sedimentary rocks of Paleocene age, so the soil map alone does not describe every deeper layer.
How do crews bore Floydada clay loam?
Pullman clay loam dominates the USDA soil map in Floydada, so we plan for sticky cuttings and pipe that can drag in the hole. A walkover locator tracks the drill head as each rod advances.
- Pullman clay loam can ball up on the reamer, so we use thinner fluid with polymer and open the hole in stages before pulling pipe.
- Because clay makes up 40 percent on average at about 40 inches in Floydada, we watch returns and keep fluid pressure low beneath paved streets.
- The soil survey maps a seasonal water table within 60 inches across 4 percent of Floydada, so we plan small pits and pumping where needed.
- A walkover locator follows the drill head along a route such as Lee Street, while we record its depth and pitch as each rod advances.

Which roads, tracks or creeks can a Floydada bore cross near Farm Road 784?
US 70, US 62, Texas State Highway 207, Farm Road 784 and FM 1958 all run inside Floydada. A utility route beneath an existing highway pavement is bored or tunneled rather than open cut. Farm Road 784 is the longest named street in the city at 1.86 miles, followed by Lee Street at 1.64 miles and Virginia Street at 1.53 miles. Price Street also runs 1.53 miles. These street names help identify a route, but the exact crossing and pavement still shape the bore plan.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| US 70 | US highway | 2.4 roadway miles inside | State highway office |
| US 62 | US highway | 2 roadway miles inside | State highway office |
| Texas State Highway 207 | State highway | 2.9 roadway miles inside | State highway office |
| FM 784 | State highway | 0.6 roadway miles inside | State highway office |
| FM 1958 | State highway | 0.3 roadway miles inside | State highway office |
No railroad is mapped inside Floydada or within one mile outside the city limits, so there is no mapped track route to plan around. The mapped street and rail crossing count is none. No streams are mapped inside the limits or within one mile outside them, and no lakes or ponds are mapped within one mile. That leaves no mapped creek or lake crossing to plan for in Floydada, though the exact work location still determines the route.
Do I need a permit to bore under US 70 in Floydada?
For an electric or communication line crossing US 70, plan for at least 60 inches of cover below the lowest point of the crossed grade; a line running along the right of way needs 48 inches. Water needs 60 inches at a crossing and 36 inches along the right of way, while pressurized sewer needs 60 inches at a crossing. TxDOT can set another depth in the permit. The utility owner, not Trinity, files in TxDOT’s online RULIS system, and the TxDOT Lubbock District reviews the application. We prepare the bore plan and profile for the owner’s filing. Existing highway pavement is bored or tunneled beneath, with crossings encased. Lee Street is a city street, while highway right of way follows TxDOT permitting.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
What is already in the ground near the City of Floydada water system?
The City of Floydada public water system uses purchased surface water and reports 1,354 service connections serving 2,675 people. Floydada also owns its municipal electric system. Before a conduit route near the water system or city electric lines is set, we hydrovac pothole marked utilities on the bore path because locate paint shows position, not depth. This exposes the line before the drill approaches it.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| City of Floydada | Public water system | Surface water bought from another system | 1,354 connections, 2,675 people served |
| City of Floydada municipal electric system | City owned electric system | Reports to the U.S. Energy Information Administration | 1,255 customers reported |
| Southwestern Public Service, Lighthouse Electric Cooperative and South Plains Electric Cooperative | Electric utilities reporting service in Floyd County | EIA Form 861 | Confirm the line owner by address |
For Floydada underground planning, we treat the survey’s 1964 median housing year as context, not a map of buried utilities. Floydada housing estimates show 41 percent of homes built before 1960, 52 percent from 1960 to 1999, and 7 percent in 2000 or later; we verify utilities. Replacement work on an older Lee Street service may need to match an existing route, while a new service has a different path to plan. On Lee Street, we expose marked utilities before drilling nearby and confirm marks at the work area.

Do you cover Floydada and nearby Lockney?
Floydada is the incorporated county seat of Floyd County, at an elevation of 3,183 feet and covering 2.03 square miles. The city’s ZIP code is 79235. Lockney is 11.4 miles northwest, and Petersburg is 16.8 miles southwest; Plainview, the nearest larger city, is 26.4 miles northwest. Floydada is 312 road miles and a 6.2 hour drive from our Yukon, Oklahoma main office, so mobilization is part of planning work in Floydada, Lockney and nearby areas.
Places near Floydada
- Directional boring in Lockney: 11.4 miles northwest
- Directional boring in Petersburg: 16.8 miles southwest
- Directional boring in Ralls: 21.2 miles south
- Directional boring in Crosbyton: 24.3 miles south
- Directional boring in Lorenzo: 24.5 miles southwest
- Directional boring in Plainview: 26.4 miles northwest
Which jobs call for a bore near Lee Street in Floydada?
- Highway crossing: A route beneath US 70 is planned as a bore under existing pavement, with the line type and required cover shaping the profile.
- Street crossing: A bore beneath Lee Street can carry water, sewer or conduit while leaving the street surface uncut.
- Water service: A new or replacement connection near the City of Floydada water system needs marked lines exposed before the drill approaches.
- Electric conduit: Near Floydada’s municipal electric system, we confirm marked utilities and pothole them before setting the conduit route.
- Fiber route: A fiber bore along Farm Road 784 can cross pavement underground, with Pullman clay loam informing the reaming plan.
- Airport service: A utility route near Floydada Municipal Airport can be assessed for a bore based on its line size, footage and marked conflicts.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What should I send for a Floydada bore near Price Street?
Start with a map pin, because the exact spot on Price Street or Farm Road 784 shows us which pavement, marked utilities and access points may shape the route. Send what will go in the ground, the pipe or conduit size, and the footage. A sketch or plans help us check the crossing and prepare the bore scope.
A short route with clear access and no pavement or utility conflicts is simpler to plan than a long crossing with several exposed lines. In Floydada, Pullman clay loam can affect reaming, while pavement on US 70 brings highway requirements into the plan. The number of utilities crossed, concrete, pits, excavator time and sand backfill also matter. A route 312 road miles from Yukon can add mobilization needs, and emergency or high profile work changes the scope.
Questions people ask about boring in Floydada
Does Trinity take directional boring work in Floyd County near Floydada, and who staffs it?
Yes. We take directional boring work in Floydada, and the project is handled through Trinity from the first call to the bore log. Our own crews and partner contractor crews we have vetted can staff the work. That model lets us take Texas jobs without presenting Floydada as a local office location.
What do older homes along Lee Street mean for a Floydada replacement bore?
The American Community Survey 2019 to 2023 estimates give Floydada a median housing year of 1964, with 41 percent of homes built before 1960. Older services near Lee Street may need replacement along an existing route, while newer service work can have a different alignment. On Lee Street, we expose marked utilities before drilling nearby and confirm marks at the work area.
Does Pullman soil in Floydada corrode steel, and what pipe can I use?
The USDA soil survey maps high steel corrosion risk across Floydada, so the line owner should consider casing and tracer wire materials. For a Floydada bore in Pullman soil, we account for the fact that HDPE is unaffected by that soil corrosion concern. Pullman clay loam is widely mapped here, and the line owner selects any coating needed for steel components.
What ground will a directional bore pass through in Floydada Pullman soil?
The USDA soil survey maps Pullman soil across 95 percent of Floydada. At about 40 inches below the surface, clay loam covers 96 percent of the mapped area and clay 4 percent. The average clay content at that depth is 40 percent, so sticky cuttings and staged reaming are relevant planning concerns.
Can we predict whether a bore in Floydada will hit rock from clay loam mapping alone?
The USDA soil survey does not map bedrock in the top five feet of Floydada, but that does not rule out deeper rock. The geologic map includes Eolian sheet sand of Cenozoic age and Cenozoic sedimentary rocks of Paleocene age. The actual bore profile still depends on the route and field conditions.
Does the TxDOT Lubbock District handle state permit review for a US 70 bore in Floydada?
The utility owner applies for a TxDOT utility permit through RULIS for work in US 70 right of way, and the TxDOT Lubbock District reviews it. We prepare the bore plan and profile for the owner’s application. Cover depends on line type, and the district may set a different depth in the permit.
Can I call Trinity after hours about an urgent bore on Virginia Street in Floydada?
Yes. A person answers Trinity’s phone at (405) 409-7423 24 hours a day, including for an urgent job near Virginia Street. We also provide 24 hour emergency response. The route, line type and site conditions still need review before the work plan is set.
How much notice does Texas811 need for a bore by Farm Road 784 in Floydada?
For work near Farm Road 784, submit the locate request through Texas811 at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days beforehand. On Farm Road 784 work, if the start slips more than 14 days past the original notice, we make a new request. If marks are worn or moved near Virginia Street, we refresh them through Texas811 before we continue work.
When we price a US 70 bore in Floydada, does the 312 road miles from the Yukon main office affect mobilization costs?
The route length, pipe or conduit size, Pullman clay loam, pavement, exposed utilities, pits and excavator time all affect the scope. A US 70 crossing adds highway planning, and mobilization from the Yukon office is affected by Floydada’s 312 road miles of distance. Emergency or high profile work can also add planning demands.
Where the Floydada facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Floydada
- U.S. Census Bureau, TIGER/Line 2024: Floydada boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Floydada
- U.S. Census Bureau, American Community Survey 2019 to 2023: Floydada housing units and year built
- Macrostrat geologic map compilation: map units under Floydada
- U.S. EPA Safe Drinking Water Information System: public water systems serving Floydada
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Floyd County
- U.S. Geological Survey, Elevation Point Query Service: Floydada elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Floydada
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Floydada
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Floydada, Texas
Type the address of your job in Floydada. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.