Aldine Texas Directional Boring: Clodine Soil, Union Pacific and Halls Bayou
Quick Answer: Hardy Road, Aldine Mail Road and Chrisman Road are long local routes; we use directional boring, or horizontal directional drilling (HDD), in Aldine, Texas, to cross them without opening pavement. FM 525 crosses the community, and the Yukon main office is 448 road miles away, shaping mobilization near Union Pacific track. Clodine soil covers 77 percent of mapped ground, and loam at about 40 inches calls for a plan suited to wet soil. Halls Bayou adds a creek crossing to route planning.
Aldine bores at a glance
- Unincorporated community in Harris County, Texas. Population 15,999 (2020 Census count).
- Road distance from our Yukon, Oklahoma main office: 448 miles, about 8.6 hours of driving.
- Ground: Clodine soil is mapped on 77 percent of the area, with loam about 40 inches down.
- Rock: no bedrock is mapped in the top 60 inches.
- Highways inside the boundary: Spur 548 and FM 525. State permit office: TxDOT Houston District.
- Railroad track inside the boundary: Union Pacific, with 2 mapped street and rail crossings.
- Named streams inside the boundary: Halls Bayou.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Who can I call for directional boring near Spur 548 in Aldine?
Hardy Road and FM 525 are among the routes where we can bore water, sewer, gas, electric conduit or fiber lines, keeping a new line beneath the route rather than in its travel surface. The Census Bureau counted 15,999 people in Aldine in the 2020 Census; this unincorporated Harris County community has no city government.
Our main office is in Yukon, Oklahoma, and Aldine work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. We take on work from a 3/4 inch service line to 48 inch casing, with bore lengths from 10 feet to 5,000 feet. Our family business began in 1965, and we have done directional boring since 1982; Aldine’s mix of older streets and routes such as FM 525 can call for either scale.

What is Aldine ground like to bore through Clodine soil?
The USDA soil survey maps Clodine soil across 77 percent of Aldine, with Addicks mapped under 16 percent and Bernard under 6 percent. At the surface, fine sandy loam covers 77 percent of the mapped area, loam 18 percent and clay loam 6 percent. At about 40 inches, the survey maps loam under 94 percent and clay under 6 percent, with average clay content of 18 percent. For Aldine, we treat mapped patterns as planning guidance, not test borings, before setting a bore path. The loam and fine soil can soften when wet, so crews manage drilling fluid to avoid washing out the hole.
| USDA soil survey, inside the Aldine mapped community boundary | What is mapped |
|---|---|
| Soil series mapped | Clodine 77 percent, Addicks 16 percent and Bernard 6 percent |
| Texture at the surface | fine sandy loam 77 percent, loam 18 percent and clay loam 6 percent |
| Texture about 40 inches down | loam 94 percent and clay 6 percent |
| Engineering class about 40 inches down | lean clay (CL) 84 percent and silty clay (CL ML) 16 percent |
| Average clay content about 40 inches down | 18 percent |
| Bedrock mapped within 60 inches | None mapped |
| Seasonal water table within 60 inches | 100 percent of the area |
| Flood prone soils | 0 percent of the area |
| High corrosion risk for uncoated steel | 100 percent of the area |
The Lissie Formation, mapped as Pleistocene sand, silt and clay, puts no bedrock marker in Aldine’s upper five feet; deeper rock is not ruled out. The USDA survey maps a seasonal water table within 40 inches across 100 percent of the area, so pits may need pumping and wet ground affects setup. Flood prone soils are not mapped along Halls Bayou, but the channel still needs crossing review. High steel corrosion risk is mapped across 100 percent of Aldine, so the line owner should consider casing and tracer wire materials; HDPE has no soil corrosion concern.
How do crews handle Aldine loam during a bore?
The USDA survey maps loam at about 40 inches across most of Aldine, along with a shallow seasonal water table. We adjust the drilling plan to keep the hole stable and the work area controlled near local streets and drainage.
- Because Clodine soil and loam are widespread in Aldine, we control fluid and ream in stages so the hole holds its shape without being washed out.
- With a seasonal water table mapped within 40 inches across Aldine, crews keep pits manageable and pump water when it collects near a Hardy Road bore.
- Before drilling near a marked line on Aldine Mail Road, we hydrovac pothole to expose it; surface marks show position but not depth.
- For an Aldine route in an area with mapped high steel corrosion risk, the line owner selects suitable casing and tracer wire materials, or considers HDPE.

What is in the way of a new line in Aldine near Hardy Road?
Spur 548 and FM 525 run inside Aldine, while Loop 8 touches the mapped community boundary. Interstate 45 and Texas State Highway 249 are each 0.2 miles outside it. Hardy Road is the longest named street in the community at 4.53 miles; Aldine Mail Road runs 2.72 miles and Chrisman Road 2.6 miles. Those routes can put pavement and existing services over a proposed path, so a bore plan needs to account for the exact crossing and access for entry and exit pits.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| Spur 548 | State highway | 5.7 roadway miles inside | State highway office |
| FM 525 | State highway | 1.4 roadway miles inside | State highway office |
| Loop 8 | Highway nearby | Runs along or touches the city limits | State highway office |
| Texas State Highway 249 | Highway nearby | 0.2 miles outside | State highway office |
| Interstate 45 | Highway nearby | 0.2 miles outside | State highway office |
| Spur 261 | Highway nearby | 1.4 miles outside | State highway office |
| Union Pacific | Railroad | 2.82 track miles inside | The railroad |
| Halls Bayou | Stream | 3.69 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Greens Bayou | Stream nearby | 0.2 miles outside | Checked for Corps of Engineers jurisdiction |
Union Pacific has 2.82 track miles inside Aldine, and two street and rail crossings are mapped. Any proposed track crossing needs an agreement with Union Pacific that sets the crossing details. Halls Bayou runs 3.69 channel miles through the community, with five mapped street crossings of named streams. A bore route at the bayou needs channel planning and a check for U.S. Army Corps of Engineers jurisdiction.
Who approves a bore in Aldine and Harris County?
Aldine is an unincorporated community, so it has no city government to approve its streets; county or state authority depends on the route. For a bore under FM 525, Spur 548 or another state highway, TxDOT Utility Accommodation Rules set cover depths: electric and communication lines need 60 inches at a crossing and 48 inches along the right of way; water needs 60 inches at a crossing and 36 inches along it; pressurized sewer needs 60 inches at crossings. The line owner submits the TxDOT utility permit application through RULIS for review by the Houston District, while we prepare the bore plan and profile. At an Aldine Union Pacific crossing, we obtain the railroad’s agreement before scheduling boring work across its right of way. Halls Bayou is checked for Corps jurisdiction during planning.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
What lines are already in the ground in Harris County and Aldine?
For a bore near Halls Bayou or Hardy Road, the water provider for the specific address has to be confirmed with Harris County or the local water district before a bore is planned. Electric service reported in Harris County includes CenterPoint Energy, Entergy Texas and San Bernard Electric Cooperative; that county list does not identify the provider for every Aldine address. We confirm the electric line owner before planning a conduit bore.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| CenterPoint Energy, Entergy Texas and San Bernard Electric Cooperative | Electric utilities reporting service in Harris County | EIA Form 861 | Confirm the line owner by address |
The American Community Survey 2019 to 2023 five year estimates put Aldine’s median housing year at 1971; 21 percent of homes were built before 1960, 68 percent from 1960 to 1999 and 11 percent in 2000 or later. A replacement bore along Aldine Mail Road may meet older buried services as well as newer connections. Before drilling near a marked line, we use hydrovac potholing to expose it; paint shows its position, not its depth.

Do you cover Aldine and nearby Humble?
Aldine is an unincorporated Harris County community covering 7.87 square miles at an elevation of 78 feet. Its ZIP codes are 77039, 77060, 77037 and 77032. Humble is 8.5 miles northeast, and Houston is 8.8 miles south; Houston is also the county seat and the nearest larger city listed. From our Yukon, Oklahoma main office, Aldine is 448 road miles away, an 8.6 hour drive, so distance is part of planning work near Hardy Road and the Union Pacific track.
Places near Aldine
- Directional boring in Humble: 8.5 miles northeast
- Directional boring in Houston: 8.8 miles south
- Directional boring in Spring: 10.3 miles north
- Hilshire Village: 10.8 miles southwest
- Spring Valley Village: 11.4 miles southwest
What boring work comes up in Aldine near Aldine Mail Road?
- Street crossing: A bore beneath Hardy Road can keep a new water or sewer line out of the pavement.
- Highway crossing: An FM 525 crossing needs a route planned to meet the TxDOT permit and cover requirements.
- Utility conduit: A conduit route near Aldine Mail Road starts with confirming the line owner and exposing marked utilities.
- Creek crossing: A water or sewer bore near Halls Bayou needs channel planning and a jurisdiction check.
- Rail crossing: A proposed crossing of Union Pacific track needs the railroad’s agreement and its crossing conditions.
- Service line: A short service bore near Chrisman Road can connect a property without opening the street surface.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What do you need to quote an Aldine bore near Union Pacific?
A map pin matters near Hardy Road because the exact side of a street or drainage route can change the crossing plan. Send the address or pin, what will go underground, pipe or conduit size and footage; a sketch or plans help us check the proposed route and access for pits.
A short, direct route with clear access can be simpler to plan than a crossing with pavement, tight pits or several marked utilities. In Aldine, Clodine soil and the shallow water table affect drilling and pit work; a route under FM 525 or Union Pacific track adds crossing planning. Price also reflects pipe size, length, exposed utilities, concrete, creek crossings, equipment time and mobilization from Yukon.
Questions people ask about boring in Aldine
Does Trinity Boring Solutions take directional boring work in Aldine and Harris County, and how are crews assigned?
Yes. We take directional boring work across Texas, including Aldine in Harris County. Our crews work from the Yukon main office or from satellite yards run by vetted drilling partners, while you deal with Trinity through the work and bore log. Routes near Hardy Road are planned around the specific site and crossings.
Who owns electric lines in Aldine, Harris County, and who confirms conduit specifications?
The specific line owner must be confirmed before a conduit bore. CenterPoint Energy, Entergy Texas and San Bernard Electric Cooperative report electric service in Harris County, but that does not establish which provider serves an address near FM 525. The line owner confirms conduit specifications for its system and the planned work.
Who is responsible for Chrisman Road in Aldine, and does a bore require cutting it?
Aldine has no city government because it is an unincorporated community, so street authority rests with the county or state depending on the road. A bore can pass beneath Chrisman Road without cutting its surface. The authority for that specific segment and any required approval depend on whether it is a county or state route.
How old are buried lines near Aldine Mail Road in Aldine, and what does that mean for replacement bores?
Aldine’s median housing year is 1971 in the American Community Survey 2019 to 2023 estimates, and 21 percent of homes predate 1960. Replacement routes near Aldine Mail Road may encounter older services as well as later connections. We expose marked utilities before drilling close to them, since paint does not show depth.
Can groundwater near Halls Bayou in Aldine affect bore pits or cause flood prone ground?
Yes, a shallow water table can affect pit work: the USDA survey maps it within 40 inches across 100 percent of Aldine. Flood prone soils are not mapped, but a proposed Halls Bayou crossing still needs channel planning and a check for Corps jurisdiction. Crews may need to pump water from pits.
Does Clodine soil in Aldine corrode steel, and what pipe should I use?
The USDA survey maps high steel corrosion risk across 100 percent of Aldine, including areas mapped as Clodine soil. The line owner chooses coatings or other material requirements for steel casing and tracer wire. HDPE is not affected by soil corrosion, but the suitable pipe depends on the line and project specifications.
Can I reach Trinity after hours about an urgent bore near Chrisman Road in Aldine?
Yes. A person answers Trinity’s phone 24 hours a day at (405) 409-7423 for urgent work near Chrisman Road or elsewhere in Aldine. We can discuss what is going in the ground, the route and the immediate site conditions, including access and nearby marked utilities.
How much notice does Texas811 need for a bore near Hardy Road in Aldine, and what if marks move?
For a bore near Hardy Road, Texas law requires a locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days ahead. For Aldine work, if our start slips more than 14 days past the original notice, we submit a new request. Before we continue an Aldine bore, we refresh worn or moved marks through Texas811.
What affects the cost of directional boring near Spur 548 in Aldine?
The job route and scope set the price, not one factor alone. Length, pipe size, soil, exposed utilities, pavement, pits and equipment time all matter. Near Spur 548, highway crossing requirements can add planning, while Clodine soil and Aldine’s distance from Yukon affect drilling and mobilization. Creek or rail crossings can also change the work.
Where the Aldine facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Aldine
- U.S. Census Bureau, TIGER/Line 2024: Aldine boundary, roads, rail lines and streams
- U.S. Census Bureau, 2020 Census: Aldine population count
- U.S. Census Bureau, American Community Survey 2019 to 2023: Aldine housing units and year built
- Macrostrat geologic map compilation: map units under Aldine
- U.S. Department of Transportation, North American Rail Network: track owners in Harris County
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Harris County
- U.S. Geological Survey, Elevation Point Query Service: Aldine elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Aldine
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Aldine
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Aldine, Texas
Type the address of your job in Aldine. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Aldine
Same county: Pasadena · The Woodlands · Baytown · Atascocita · Channelview · La Porte · Mission Bend · Deer Park · Cloverleaf · Cinco Ranch · Bellaire · South Houston. All counties: Texas county list.