Quick Answer: Can you get a line under Interstate 45, a Union Pacific track or Spring Creek without cutting it? Yes, Trinity Boring Solutions does directional boring, also called horizontal directional drilling (HDD), for crossings in Spring, Texas. The Yukon main office is 439 road miles away, with Hardy Road among the local routes a bore may follow. Cyfair soil and sandy clay loam can make the hole sticky, so reaming and fluid need care. We plan around the mapped route and its crossings.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Spring bores at a glance

  • Unincorporated community in Harris County, Texas. Population 62,559 (2020 Census count).
  • Road distance from our Yukon, Oklahoma main office: 439 miles, about 8.5 hours of driving.
  • Ground: Cyfair soil is mapped on 30 percent of the area, with sandy clay loam about 40 inches down.
  • Rock: no bedrock is mapped in the top 60 inches.
  • Highways inside the boundary: Interstate 45, Spur 548 and Texas State Highway 99. State permit office: TxDOT Houston District.
  • Railroad track inside the boundary: Union Pacific, with 20 mapped street and rail crossings.
  • Named streams inside the boundary: Spring Creek, Cypress Creek, Lemm Gully and Wild Cow Gulch Cypress Creek.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Which contractor handles directional boring near Spring Creek in Spring?

Can you get a line under Spring Creek or a road in Spring without cutting it? We take directional boring work across Texas, including Spring in Harris County. The Census Bureau counted 62,559 people here in the 2020 Census. Our crews install water, sewer, gas, electric conduit and fiber, including service runs along Hardy Road or routes that need to pass beneath Spring Creek.

Our main office is in Yukon, Oklahoma, and Spring work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our longest bore runs roughly 4,100 feet with 48 inch pipe beneath the Arkansas River in Tulsa. Against that reach, a Spring job may be a shorter service bore beneath Hardy Road or a line near Spring Creek. Trinity is a family business started in 1965, with directional boring work since 1982.

Directional drill rig and crew working on a street beside a brick commercial building
Our drill and crew set up on a street beside a brick commercial building. Photos on this page are from our jobs in Oklahoma and Texas.

What is Cyfair soil like to bore through in Spring?

The USDA soil survey maps Cyfair soil across 30 percent of Spring, with Splendora at 21 percent and Texla at 14 percent. At about 40 inches below the surface, sandy clay loam covers 33 percent of the mapped area, while loam accounts for 26 percent and silty clay loam for 14 percent. We use Spring’s mapped soil patterns as planning context, not as test borings for a boring alignment. The clay can cling to a reamer and grip pipe, so a bore near Cypresswood Drive needs controlled fluid and staged reaming rather than an aggressive pull.

USDA soil survey, inside the Spring mapped community boundaryWhat is mapped
Soil series mappedCyfair 30 percent, Splendora 21 percent, Texla 14 percent, Atasco 11 percent and Hatliff 10 percent
Texture at the surfacefine sandy loam 70 percent, silt loam 15 percent and loam 10 percent
Texture about 40 inches downsandy clay loam 33 percent, loam 26 percent and silty clay loam 14 percent
Engineering class about 40 inches downlean clay (CL) 74 percent, fat clay (CH) 11 percent and silty clayey sand (SC SM) 10 percent
Average clay content about 40 inches down28 percent
Bedrock mapped within 60 inchesNone mapped
Seasonal water table within 60 inches84 percent of the area
Flood prone soils10 percent of the area
High corrosion risk for uncoated steel84 percent of the area

The USDA soil survey maps a seasonal water table within 60 inches across 84 percent of Spring, so pits near Spring Creek may need pumping and careful placement. Flood prone soils cover 10 percent of the mapped area, making channel depth part of creek crossing plans. High steel corrosion risk is mapped across 84 percent, a concern for uncoated casing and tracer wire; the line owner selects coatings. We plan Spring boring depths without treating bedrock as mapped within the top five feet. The geologic map shows Alluvial sand, silt, and clay of Chibanian age, with intermixed sand, silt, gravel and clay that can vary along the route.

How do we drill Spring’s sandy clay loam while planning a boring alignment?

The USDA soil survey maps sandy clay loam beneath Spring, and Cyfair is the leading soil series. We use that ground information to shape the bore plan, then check actual conditions and marked lines along the route.

  1. For Cyfair clay near Cypresswood Drive, we use controlled fluid and ream in stages so sticky cuttings do not build up on the tools.
  2. Where Spring’s sandy clay loam gives way to sand or silt, we manage the fluid to keep the hole stable without washing it out.
  3. With seasonal water mapped across 84 percent of Spring, we keep pits small and pump water where a route near Spring Creek calls for it.
  4. Before a bore near Hardy Road, we hydrovac pothole every marked utility on the path; a locator tracks the head and we log depth and pitch.
Walkover locator at the edge of the wetland on a directional bore at the Cimarron site in Logan County, Oklahoma
Walkover locator at the edge of a wetland on a directional bore in Logan County, Oklahoma.

What can a new line cross in Spring near Interstate 45?

Interstate 45 has a mapped segment inside Spring, alongside Spur 548 and Texas State Highway 99. A line beneath Interstate 45 calls for a bore rather than an open cut through existing highway pavement. Local routes can also shape the alignment: Cypresswood Drive runs 12.52 miles inside the community, Hardy Road 8.21 miles, and Northgate Crossing Boulevard 4.6 miles. A map pin helps show which road section, driveway or pavement edge the bore must avoid.

CrossingTypeMapped extentWho has a say
Interstate 45Interstate0.1 roadway miles insideState highway office
Spur 548State highway12.1 roadway miles insideState highway office
Texas State Highway 99State highway2.9 roadway miles insideState highway office
Union PacificRailroad18.61 track miles insideThe railroad
Spring CreekStream35.48 channel miles insideChecked for Corps of Engineers jurisdiction
Cypress CreekStream9.14 channel miles insideChecked for Corps of Engineers jurisdiction
Lemm GullyStream2.85 channel miles insideChecked for Corps of Engineers jurisdiction
Wild Cow Gulch Cypress CreekStream2.21 channel miles insideChecked for Corps of Engineers jurisdiction
Wunsche DitchStream1.23 channel miles insideChecked for Corps of Engineers jurisdiction
Senger GullyStream1.11 channel miles insideChecked for Corps of Engineers jurisdiction
Shultz Gully Cypress CreekStream1.01 channel miles insideChecked for Corps of Engineers jurisdiction
Turkey CreekStream nearbyAlong the boundaryChecked for Corps of Engineers jurisdiction
Seals GullyStream nearby0.8 miles outsideChecked for Corps of Engineers jurisdiction
Panther BranchStream nearby1 miles outsideChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

Union Pacific has 18.61 track miles in Spring, on the Navasota and Palestine subdivisions. The mapped community contains 20 street and rail crossings, so a route near either subdivision needs its track owner identified. Spring Creek runs 35.48 channel miles here and Cypress Creek 9.14; public records map 19 street crossings of named streams. Horsehoe Lake and Bender Laker are also inside the community, so water crossings need review during planning.

Who has to approve a bore in Spring and Harris County?

Spring is an unincorporated community, so there is no city government to permit its streets. The responsible road authority must be confirmed for a Hardy Road or Cypresswood Drive bore. For work in the right of way of Interstate 45, Spur 548 or Texas State Highway 99, TxDOT’s Houston District reviews the utility permit. The utility owner, not the drilling contractor, submits through TxDOT’s online RULIS system; we prepare the bore plan and profile and work under the permit issued to that owner. TxDOT sets highway cover requirements, and its permit may specify a different depth. A Union Pacific track crossing requires an agreement with the railroad. Spring Creek or Cypress Creek crossings are checked for U.S. Army Corps of Engineers jurisdiction during planning.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Who owns the lines already in the ground in Spring, Harris County?

The water provider for the specific address has to be confirmed with the county or local water district before a bore is planned. Public records do not match a named water system to Spring, so check the address before sizing a water service along Hardy Road. CenterPoint Energy, Entergy Texas and San Bernard Electric Cooperative report electric service in Harris County. That does not identify the provider at every address; we confirm the line owner before planning an electric conduit bore.

Line ownerWhat it isSourceSize
CenterPoint Energy, Entergy Texas and San Bernard Electric CooperativeElectric utilities reporting service in Harris CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

We treat Spring’s 1991 median housing year as background, then plan underground work around the site’s actual conditions. The survey estimates that 44 percent of housing units were built in 2000 or later and 56 percent from 1960 to 1999. A replacement bore near Cypresswood Drive may need to connect around older buried lines, while a newer service still has to avoid existing utilities. We hydrovac pothole each marked utility on the bore path before drilling near it; paint shows a line’s position, not its depth.

Large HDPE conduit reels staged on a Rotate A Reel trailer for a fiber and utility installation in Oklahoma
HDPE conduit reels on a reel trailer for a fiber and utility installation in Oklahoma.

What places near Houston does Trinity serve from Spring?

Spring is an unincorporated community in Harris County, within Houston’s extraterritorial jurisdiction. Its mapped area covers 22.49 square miles at an elevation of 107 feet, and ZIP code 77373 serves the community. Porter Heights is 7.0 miles northeast, Oak Ridge North is 7.4 miles northwest, and Humble is 8.8 miles southeast. Houston, the county seat and nearest larger city, is 19.1 miles south. The Yukon yard is 439 road miles away, an 8.5 hour drive, so mobilization matters for a bore near Spring Creek or Interstate 45.

Places near Spring

What would we bore near Hardy Road in Spring?

  • Highway crossing: A line beneath Interstate 45 needs a planned bore route that stays below the road surface and works within the TxDOT permit.
  • Street service: A water or sewer run along Hardy Road can use a bore to cross pavement and reach a property without cutting the road.
  • Fiber conduit: A route near Northgate Crossing Boulevard can place conduit beneath a street or driveway while avoiding marked buried lines.
  • Creek crossing: A bore beneath Spring Creek needs a planned depth below the channel and a check for federal jurisdiction during planning.
  • Rail crossing: A line crossing Union Pacific track needs the railroad’s agreement and a route coordinated with its crossing conditions.
  • Drainage crossing: A bore near Cypress Creek or Lemm Gully needs pits placed with wet ground and channel access in mind.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

What drives the price of directional boring near Cypresswood Drive in Spring?

A map pin matters near Cypresswood Drive because the exact crossing can change the route, access and surface to protect. For a Spring quote, send the address or pin, what goes in the ground, the pipe or conduit size and the footage. A sketch or plans help show nearby Spring Creek crossings, pavement and the intended tie in.

Mobilization starts with the 439 road miles from Yukon, then the job’s ground and route shape the price. Cyfair clay can change fluid and reaming needs; a crossing of Interstate 45 or Union Pacific track adds planning and exposure work. We also consider length, pipe or conduit size, other utilities crossed, pavement, creek or drainage crossings, pits, excavator time, sand backfill and emergency timing. Cypresswood Drive access and the scope of the crossing help us assess the work.

Questions people ask about boring in Spring

Does Trinity Boring Solutions take directional boring work in Spring, Harris County?

Yes. We take directional boring jobs in Spring and across Texas, and our main office is in Yukon, Oklahoma. Our own crews and vetted drilling partners staff the work, with Trinity handling the job from the first call through the bore log. For a route near Spring Creek, the crossing and ground help shape the plan.

Can you replace an old buried line near Hardy Road in Spring?

Yes. Replacement bores can route around existing lines near Hardy Road without opening the full road surface. The American Community Survey 2019 to 2023 estimates a median housing year of 1991, with 56 percent of housing units built from 1960 to 1999. We expose marked utilities along the bore path before drilling near them.

Will groundwater or flood prone ground affect a bore pit near Spring Creek in Spring?

It can. The USDA soil survey maps a seasonal water table within 60 inches across 84 percent of Spring, and flood prone soils across 10 percent. Near Spring Creek, we account for wet pits, plan to stay below the channel, and consider pumping where needed. Creek crossings are checked for U.S. Army Corps of Engineers jurisdiction during planning.

Can Cyfair soil in Spring corrode steel casing, and what pipe should I use?

The USDA soil survey maps high steel corrosion risk across 84 percent of Spring, so the line owner should consider casing and tracer wire materials. Cyfair is the leading mapped soil series at 30 percent. HDPE does not have the same soil corrosion concern, while the line owner decides whether steel needs a coating for a bore near Cypresswood Drive.

What ground will a bore pass through in Spring around Cyfair soil?

The USDA soil survey maps Cyfair across 30 percent of Spring. At about 40 inches below the surface, sandy clay loam covers 33 percent of the mapped area, with loam at 26 percent and silty clay loam at 14 percent. These are mapped patterns, not test borings, so conditions along a specific route near Hardy Road still need field checks.

Is a directional bore in Spring likely to hit rock?

Bedrock is not mapped in Spring’s top five feet, but that does not rule out rock deeper down. The geologic map shows Alluvial sand, silt, and clay of Chibanian age, with sand, silt, gravel and clay. Along a route near Spring Creek, actual ground conditions can still vary, so the bore plan must account for what the drill encounters.

Can I reach Trinity after hours about an urgent bore near Northgate Crossing Boulevard in Spring?

Yes. We answer Trinity’s phone 24 hours a day at (405) 409-7423 for Spring boring questions. For urgent work near Northgate Crossing Boulevard, tell us the location, what line is involved and whether the route crosses a road, utility or drainage feature. We provide 24 hour emergency response, with the work plan based on the specific Spring site.

How early should I call Texas811 for a Spring bore near Cypresswood Drive, and what if marks move?

For a bore near Cypresswood Drive, place the Texas811 locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before work. We make a new request when a Spring start slips more than 14 days past the original notice. Refresh marks through Texas811 if they wear off or move before work continues.

What affects the cost of a directional bore under Interstate 45 in Spring?

The job scope determines the price, not just the length. A bore under Interstate 45 may involve TxDOT permitting, highway cover, pavement and utility exposure. Cyfair soil, Union Pacific track or Spring Creek crossings, bore length, pipe size, pits, equipment time and mobilization from Yukon also affect the work. We use the route and plans to assess those factors.

Where the Spring facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Spring

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Spring, Texas

Type the address of your job in Spring. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Spring

Same county: Pasadena · The Woodlands · Baytown · Atascocita · Channelview · La Porte · Mission Bend · Deer Park · Cloverleaf · Cinco Ranch · Bellaire · South Houston. All counties: Texas county list.